Provide exact details of
non compoundable deviations for eg non-compoundable area, setback violation excess FAR etc.
2. How many floors have been constructed
Port Blair Municipal Area and Dud Line to
School line with setback area of 0 to 10 meter from main road.
Grounds for the Complaint
violation of my legal rights as co-owner as relevant setbacks and
open areas as per the FAR rules for the entire plot
that in the
area Kishangarh, on Aruna Asaf Ali Marg, the road is supposed to be of 45meters with a
setback of 60 meters from ... meters or 60 meters. The respondent stated that
the area of Kishangarh falls in South Zone. The appellant stated that
that in the
area Kishangarh, on Aruna Asaf Ali Marg, the road is supposed to be of 45meters with a
setback of 60 meters from ... meters or 60 meters. The respondent stated that
the area of Kishangarh falls in South Zone. The appellant stated that
aggrieved with the fact that a copy of
communication with Rajasthan project area toward execution of RT-DAS project
has been wrongly denied ... shall
not be possible.
This action may be major setback to Govt. initiative's toward sectorial
reforms, public may suffered in large scale
Copy of photographs of the area before and after the demolition action been taken.
3- Details of the area of the property ... violation as per department record.
Reply of the PIO
1- Demolished front setback bathroom and 2nd floor demolished (punctured slab at 2 points
Maduravoyal Bypass., Mogappiar, Chennai:-
1. The details of inspection carried out on setback space, approach road for fire
fighting vehicle.
1
2. The inspection/ verification ... officials
before releasing Certified Copy of Compliance Report on FSI/Non FSl, area and
/ or percentage of Roads, open space allotment and marked
Bksr Ayyangar vs Archaeological Survey Of India on 30 August, 2018
CENTRAL INFORMATION COMMISSION
(Room
concerned and specify the
height in mtrs.
(d) Does front setback of 10 feet is achieved /left in the ongoing
construction at the residential Property ... Kindly conduct fresh inspection of property site and specify the actual
front setback in feet/mtrs.
(e) Does the ongoing construction at the residential Property