without changing the character and dimension of such roof: Provided that the character of a damaged roof may be allowed to be changed ... copies of plan; on payment of requisite fees and on submission of structural stability certificate from a Structural Engineer, Architect or a Licensed Building Surveyor
Duties and Responsibilities of Structural Reviewer.
(1) To review and certify as complying with these rules the design prepared by Structural Engineer ... certificate or a new certificate in case of subsequent changes in structural design
construct any building, carry on any construction of any structure or development or make any change or modification and shall not allow any other ... license as the case may be, and the demised land along with structures thereon shall vest with the Authority and the amount which had been
shall prepare structural designs and structural details as per the provisions of these rules, (2) They shall prepare and submit all such structural plans together ... intimate to the applicant of the corrections or other changes, they make on the structural plans, documents and details as per requisition from the Municipal
construct any building, carry on any construction of any structure or development or make any change or modification and shall not allow any other
material alteration or enlargement of any building; (ii) the conversion by structural alteration into a place for human habitation of any building not originally constructed ... change in its drainage or sanitary arrangements or materially effect its security; and (vi) the addition of any rooms, buildings, out-houses or other structures
with respects to change of use of land; (xxxv) for prescribing the manner and the time in which water harvesting structure shall be provided
material alteration or enlargement of any building; (ii) the conversion by structural alteration into a place for human habitation of any building not originally constructed ... change in its drainage or sanitary arrangements or materially effect its security; and (vi) the addition of any rooms, buildings, out-houses or other structures
Commissioner may make minor changes to the schedules to suit the local requirements, without however altering the basic structure of the schedules. 8. Circulation
Commissioner may make minor changes to the schedules to suit the local requirements, without however altering the basic structure of the schedules