Kayakkodi Post
Office, she was working as GDS MD in the revised TRCA of
4220-75-6470. The invitation for applications for
appointment as GDSBPM ... Cheekkonnummal West was in
the TRCA of 2745-50-4245.
4. The order that was impugned before the Tribunal
also stood in the form
decision is the entitlement of
protection to Time Related Continuity Allowance (TRCA).
Two issues were referred to the Full Bench of the Tribunal
for consideration ... When a Gramin Dak Sevak
drawing pay in a higher TRCA is transferred from one Post
Office to another within the same recruiting unit
Office Memo dated 08.04.2013 with one of
the specific conditions that "TRCA of the new post to which the
GDS is transferred shall ... post, a GDS cannot have any claim for protection of
his/her TRCA drawn in the old post. The petitioner was drawing
TRCA @ Rs.5045
request for enhancement of Time
Related Continuity Allowance (in short 'TRCA'). The applicant
was regularly selected as Gramin Dak Sevak MP - Enathu ... with effect from 12.03.2012. The applicant was sanctioned
with TRCA in lowest grade, considering the workload at 2 hours
and 57 minutes
1862/2012 2
willing to work on the lower TRCA in the post of BPM. The
applicant had given his consent in writing. Thereafter ... post of GDS BPM at Kokkottukonam GDS BO
on a TRCA of Rs.2745 - 50 -4245.
3. Annexure A1 is challenged by the petitioner
quash the same and direct the respondents to fix the TRCA (Time Related Continuity Allowance), i.e. Scale of pay of the petitioner ... request to enhance the Time Related Continuity Allowance (hereinafter referred to as TRCA).
The petitioner joined the Postal service as Extra Department Delivery Agent
near to her matrimonial residence. She was
entitled to protection of the TRCA drawn by her in NR City Post
Office, since that was higher ... than the TRCA for the post in
Pottenkad. Protection was granted. Thereafter, TRCA scales were
revised on the recommendation of R.S.Nataraja Murthy
Committee
issue appropriate direction or order directing the
1st respondent to restore the TRCA of the applicant
which he was drawing upto the month of June ... continue to pay the TRCA with annual increments
admissible and to refund the TRCA unlawfully
recovered from the pay of the applicant;
(iii) To issue
further seeks
direction to the opposite parties to re-fix the revised TRCA of the
petitioner w.e.f. 01.01.2006 in the TRCA Slab ... 3660-70-5760/-
corresponding to pre-revised TRCA slab of Rs.1600-40-2400/- and
refund the illegally recovered amount and disburse the arrear from
which direction has been
issued to the present petitioners to grant full TRCA in
favour of the deceased employee for the intervening
Page ... petitioners to
regularize his service and to pay the back wages (TRCA)
w.e.f. 15.07.1997 to 21.05.2008. In response to the said
representation