accordance with
the Bid Documents. The project was to be executed on turnkey basis.
W.P.(C) No.3914/2012 Page ... Award on 23.12.2008 awarding the
work of executing the project on a turnkey basis to the Consortium.
23.12.2008 was also fixed as the effective date
Sterling And Wilson Private Ltd vs M/S Sharma Turnkey Engineers Pvt Ltd on 28 May, 2024
Author: Vibhu Bakhru
Bench: Vibhu Bakhru ... Appellant
Through: Mr.Sanjeev Kumar Tyagi, Advocate.
versus
M/S SHARMA TURNKEY ENGINEERS PVT LTD ..... Respondent
Through: Mr.Gautam Suhag and Mr.Ashish
Verma, Advocates
Advance Steel Tubes Ltd vs Spack Turnkey Projects P. Ltd on 31 March, 2022
Author: Vibhu Bakhru
Bench: Vibhu Bakhru
$~9 & 10 (Company ... 2019
ADVANCE STEEL TUBES LTD. ..... Petitioner
Through
versus
SPACK TURNKEY PROJECTS P. LTD. ..... Respondent
Through: Mr Ashok Kumar and Mr Ujjawal
Goel, Advocates.
Through
further held that the
contracts with Reliance constituted a single turnkey contract which had
been artificially divided into three separate contracts. The AO further
held ... between Nortel India and Reliance Infocom were a part of a
'turnkey contract' which had been artificially split up into three separate
contracts
machinery/plant/system (referred to as „M&P‟) on a Turnkey basis. It
was held that IRCON was only responsible to provide electricity ... basis that the entire contract was to be performed on
Turnkey Basis. She submitted that the contract between the parties
was split into two separate
outside India is concerned, the AO held that the contract was a
turnkey and a composite contract and was not divisible as claimed ... applicable. It held that the contract in question was a turnkey contract
in the nature of a works contract and could not be considered
contract for setting up a Thermal Power
Plant in Syria on a turnkey basis. BHEL in turn has placed purchase order
dated 26.03.2013 for supply
survey, supply of materials,
design, erection, testing & commissioning on
a turnkey basis."
28. The respondent claims that its marks are registered in various
engaged in the business of
construction and taking up projects on a turnkey basis.
6. The parties entered into an agreement dated 10.03.2005
(hereafter
works of "6
Pipeline Replacement Project (Assam Asset) on lumpsum turnkey
basis" (hereafter 'the Project'). Thereafter, by a Notification of Award