damages charged for unauthorised
construction for the period from 4th December, 1976 till 14th July, 2012 as
also mis-user charges from the period from ... construction as it
stood is itself adequate notice which was accepted by the DMC, as no notice
of demolition, claiming the construction to be unauthorised
passed order in W.P.No.18723 of 1990 confirming that unauthorised construction in the ground floor including Flat No.1 by annexing the common ... take enforcement action, namely locking and sealing and demolition of the unauthorised construction. Indeed, the CMDA has issued notice in Ref.1742, dated
submitted that the petitioner and her husband had carried
out unauthorised construction during the term of the office of the petitioner. The
petitioner as well ... capacity as a Councillor in carrying out
such illegal or unauthorised construction or has obstructed or tried to obstruct the
Mangaon Municipal Council from discharging
sanctioned structure without a proper sanction from the
KMC, is an unauthorised construction..
There was no sanctioned plan whatsoever allowing such changes to be
made ... neighbours also who claimed to
be effected by reason of the unauthorised construction. A demolition proceeding
was initiated under section 400 of the Kolkata Municipal
accepted the retention fee from the present applicant to regularise the unauthorised
construction of two floors, the 5th and 6th floors of the two buildings ... Road (North) Howrah, the latter is entitled to retain such unauthorised construction. In the said writ
petition, the present opposite party
said building, occupiers had carried out various unauthorised construction
and thus the petitioner society shall not be allowed to be registered. The
Divisional Joint Registrar ... regularised. It was stated
by the Municipal Corporation that if those unauthorised construction
works were not regularised by the Municipal Corporation, the same shall
site. I further certify that the unauthorised buildings is/are structurally stable (applicable in the case of unauthorised construction with the exception of high rise ... Engineer to the effect that "the unauthorised high rise buildings/unauthorised telecommunication towers or the building above which unauthorised telecommunication tower is erected
Section 27 in Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018
27. The following documents have to be submitted along with the application, namely ... unauthorised building(s) is high rise building and/or telecommunication tower)"...........
Compulsory
(iii) the Structural Engineer:"Certified that the unauthorised high rise building(s)/ unauthorised
Section 6 in Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018
6. Procedure for disposal of application.
(1) In the case of applications other ... duplicate, incorporating compounding fee (Appendix I), in the case if the unauthorised construction is regularised, duly sign and make a certification, as provided therein
Section 13 in Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018
13. Removal of doubts.
- The Government shall have power, if any doubt arises ... constructed unauthorisedly, for the purpose of calculation of the fees as per these rules, the whole structure shall be considered as unauthorised construction