State of Kerala - Act
Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018
KERALA
India
India
Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018
Rule KERALA-PANCHAYAT-BUILDING-REGULARISATION-OF-UNAUTHORISED-CONSTRUCTION-RULES-2018 of 2018
- Published on 15 February 2018
- Commenced on 15 February 2018
- [This is the version of this document from 15 February 2018.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short title, and commencement and applicability.
2. Definitions.
3. Submission of application for regularization of unauthorised Construction.
4. Application fee.
- The application fee to be paid to the Grama Panchayat while submitting the application for regularisation of unauthorised construction, shall be as follows, namely:-Table| Sl No | Item | Application fee in rupees | |
| Grama Panchayat Category I | Grama Panchayat Category .II | ||
| 1 | 2 | 3 | 4 |
| 1 | Telecommunication Tower | Rs. 5,000 | Rs. 5,000 |
| 2 | Huts and buildings under Group A1 ResidentialOccupancy as per rule 34(3) (a) of the Building Rules with totalbuilt-up area up to 60 sq.metres | Nil | Nil |
| 3 | All buildings otherthan those mentioned above with total built-up area:(i) 61 sq.m and upto100 sq.metres(ii) 101 sq.metresand upto 200 sq.metres(iii) 201 sq.metresand upto 500 sq.metres(iv) 501 sq.metresand upto 1000 sq.metres(v) 1001 sq.metres and above | Rs. 1,000Rs. 2,500Rs. 5,000Rs. 7,500Rs. 7,500 + Rs. 15 per sq.m of built up area inexcess of 1000 sq.m | Rs. 1,000Rs. 2,500Rs. 5,000Rs. 7,500Rs. 7,500 + Rs. 10 per sq.m of built up area inexcess of 1000 sq.m |
5. Construction after submission of application for regularization.
- During verification if it is found that the applicant has undertaken further additions or extensions to the existing building after submission of application for regularization, then such application shall be summarily rejected.6. Procedure for disposal of application.
7. Duties, responsibilities and liabilities.
8. Construction after regularization.
9. Procedure in case the application for regularization is rejected etc.
10. Review by Government.
11. Power of the Government to cancel or revise the order etc.
12. Constitution and Functioning of the Monitoring Committee.
| 1 | The Additional Chief Secretary /The PrincipalSecretary,Local Self Government Department.; | - | Chairman |
| 2 | The Chief Town Planner; | Member | |
| 3 | The Chief Engineer, Local Self GovernmentDepartment.; | - | Member |
| 4 | The Director, Department of Panchayats | - | Convenor |
13. Removal of doubts.
- The Government shall have power, if any doubt arises with regard to the interpretation or otherwise of any provision or if any difficulty arises in the implementation of the provision, to clarify the doubt or to issue necessary direction for removing the difficulty.Appendix I[See rule 6(1)](The Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018)Compounding FeeCompounding fee for regularization of unauthorized construction carried out on or before 31st day of July 2017 violating the provisions of the Building Rules.| Sl No. | Category of Unauthorised construction | Compounding fee in rupees | |
| Grama Panchayat Category I | Grama Panchayat Category II | ||
| 1 | 2 | 3 | 4 |
| a | Telecommunication Towers | Rs. 1,00,000 per tower and its ancillarystructures | Rs. 1,00,000 per tower and its ancillarystructures |
| Sl No. | Category of Unauthorised construction | Compounding fee in rupees Grama PanchayatCategory-I | Grama Panchayat Category-II |
| 1 | 2 | 3 | 4 |
| (a) | Single family residential buildings upto 60 sq.mfloor area | Nil | Nil |
| (b) | Single family residential buildings above 60sq.m and up to 300 sq.m floor area | Rs. 2000Rs. 15000Rs. 20000 | Rs. 2000Rs. 15000Rs. 20000 |
| 61-100sq.m101-200sq.m201-300sq.m |
| Sl No. | Unauthorised construction | Compounding fee in rupees | |
| Grama Panchayat Category -I | Grama Panchayat Category -II | ||
| 1 | 2 | 3 | 4 |
| (i) | Other buildings upto 100 sq.m floor area | Ten times of the permit fee as prescribed in theBuilding Rules, and 1/50th (one-fiftieth) of the fair value ofland in rupees per sq.metre of the land multiplied by the totalfloor area of the unauthorised construction | Ten times of the permit fee as prescribed inthe Building Rules, and 1/50th (one-fiftieth) of the fair valueof land in rupees per sq.metre of the land multiplied by thetotal floor area of the unauthorised construction |
| (ii) | Single family residential buildings above 300sq.m floor area and other buildings above 100 sq.m floor area: | ||
| a | Basic compounding fee | Ten times of the permit fee as prescribed in theBuilding Rules, and 1/40th (one-fortieth) of the fair value ofland in rupees per sq.metre of the land multiplied by the totalfloor area of the unauthorised construction | Ten times of the permit fee as prescribed inthe Building Rules, and 1/40th (one-fortieth) of the fair valueof land in rupees per sq.metre of the land multiplied by thetotal floor area of the unauthorised construction |
| b | Additional compounding fee for deficient carparking in case of violations for off-street parking under rule38 of the building rules: | ||
| (i) | Where minimum of 50% the parking specified isavailable: | Rs. 2,00,000 per deficient car parking | Rs. 2,00,000 per deficient car parking |
| (ii) | Where minimum of 25% the parking specified isavailable: | Rs. 3,00,000 per deficient car parking | Rs. 3,00,000 per deficient car parking |
| (iii) | Where the available parking is less than 25% ofthe parking specified as per rules | Rs. 3,50,000 per deficient car parking | Rs. 3,50,000 per deficient car parking |
| (c) | Additional compounding fee for Floor Area inexcess of that corresponding to Floor Area Ratio value in column(4a) of Table 2 of rule 35 of building rules in the case of GroupG2 Group 1(1) and Group1(2) occupancies and column (4b) of Table2 in the case of other occupancies for Category I Grama Panchayatand column (5a) of Table 2 in the case of Group (I) occupancy andcolumn (5b) of the Table 2 in the case of other occupancies forCategory II Grama Panchayat and notes thereunder as applicable | ||
| (i) | Where provided Floor Area Ratio does not exceed1.5 times the value prescribed in rules | Rs. 3,000 per sq.m of floor area built in excessof that permissible as per building rules. | Rs. 3,000 per sq.m of floor area built in excessof that permissible as per building rules. |
| (ii) | Where provided Floor Area Ratio exceeds 1.5times the value prescribed in rules | Rs. 4,000 per sq.m of floor area built in excessof that permissible as per building rules. | Rs. 4,000 per sq.m of floor area built in excessof that permissible as per building rules. |
| (d) | Additional compounding fee for Covered Area inexcess of that corresponding to the maximum permissible coveragevalue in column (3a) of Table 2 of rule 35 in the case ofCategory I Grama Panchayat and column (3b) of Table 2 of rule 35in the case of category II Grama Panchayat of building rules andNote thereunder as applicable | ||
| (i) | Where provided coverage does not exceed 1.5times the value prescribed in rules | Rs.1,000 per sq.m of coverage area, built inexcess of that permissible as per building rules. | Rs. 1,000 per sq.m of coverage area built inexcess of that permissible as per building rules. |
| (ii) | Where provided coverage exceeds 1.5 times thevalue prescribed in rules | Rs.2,000 per sq.m of coverage area, built inexcess of that permissible as per building rules. | Rs. 2,000 per sq.m of coverage area, built inexcess of that permissible as per building rules. |
| (e) | Additional compounding fee for total floor areabuilt in excess of that permissible corresponding to the minimumwidth of access prescribed in the building rules. | ||
| (i) | Where the access width provided is not less than2/3rd of the value prescribed in rules | Rs. 1,500 per sq.m of floor area built in excessof that permissible as per building rules. | Rs. 1,500 per sq.m of floor area built in excessof that permissible as per building rules. |
| (ii) | Where the access width provided is less than2/3rd of the value prescribed in rules | Rs.3,000 per sq.m of floor area built in excessof that permissible as per building rules. | Rs.3,000 per sq.m of floor area built in excessof that permissible as per building rules. |
| Item | Building occupancy | Percentage of compounding fee applicable asper Appendix I |
| 1 | 2 | 3 |
| (a) | Government offices | Nil |
| (b) | Government educational institutions, buds school | Nil |
| (c) | Government aided schools | 10 |
| (d) | Government sanctioned private educationalinstitutions including self financing educational institutions | 35 |
| (e) | Approved pain and palliative Clinics, Religiousbuildings | 25 |
| (f) | Offices of political parties having importancein Niyamasabha, Lok Sabha and Rajya Sabha | 25 |
| (g) | Old age home, orphanages, Day care centers,creches, Adult day care centers, Block Resource Centers | 10 |
| (h) | Library (Affiliated to Kerala State librarycouncil) | 10 |
3. ________________________ Name and address (ci) ________________________ Name and address Sworn and signed before me on this ----------------- day of ------------- 2018 in the presence of above witnesses.
Public NotaryAppendix IV(See rule 6(11))[The Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018]-------------------------------- Grama PanchayatNo. ___________________ Date ______________Intimation Regarding Sanction For Reularisation Of Unauthorised ConstructionsTo,Smt/Sri _________________________________________________ _________________________________________________________ Your application No. -------------------- dated -------------------, for the regularisation of the unauthorised construction of ------------------building with are ----------------near Building No. ---------------, or telecommunication tower/ pole structure near/ over Building No.----------------- or alteration/ addition/reconstruction to an existing Building No --------------------- in ---------------------- Sy. No. ----------------- Village, ------------------- Taluk has been considered by the Committee constituted by Government.The Committee has sanctioned the above mentioned unauthorised construction for regularisation in accordance with the provisions in the Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018 vide order No. -------------- dated --------- under the following conditions1.
2.
3.
Now Therefore, in pursuance of the provisions of sub- rule (11) of rule 6 of the Kerala Panchayat Building (Regularisation of Unauthorsed Construction) Rules, 2018, it is hereby informed that your applicatiion for regularization is hereby rejected and your unauthorized construction cannot be regularised.If you are aggrieved by this notice, you may prefer a review to the Government as per the provisions of rule 10 of the Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018 within a period of thirty days from the date of receipt of this notice.Date:__________________Place:__________________Secretary------------ Grama PanchayatAppendix IXGeneral Instructions To Applicant For Furnishing Details In Form I-A7. Submit 2 copies of the completed application form (in Form I-A) with the documents required as per rule 3(2) of the Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018, within Ninety days of notification made by the Government calling for such applications.
8. Pay the application fee as prescribed in rule 4 of the Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018, in the Grama Panchayat, and the copy of the receipt shall be submitted along with the application for regularisation.
9. The application fee remitted, shall not be refunded under any circumstances.
10. Only application fee need to be remitted at the time of submission of application for regularisation. The regularisation fee is to be remitted only after intimation for remitting of regularisation fees is received from the Secretary.
11. Furnish all the details of the unauthorised construction in Form I-A, along with the Statement of the Owner.
12. Affix passport size photograph of the owner in the space provided in Form I-A
13. Affix a minimum of 4 nos. of time stamped photographs of all four sides of the of size 15 cms x 10cms of the four sides of the building showing all external details of development. The photographs should be attested by the owner/ owners and the Licensee.
14. The plans submitted along with the application should be certified by the owner(s), Licensee and Structural Engineer (as required)
15. All required documents detailed in rule 3(2) of these rules, should be enclosed with Form I-A. The list of documents required are detailed below. If the application is not in order or incomplete or required documents are not attached, the application shall be rejected.
16. Additional sheets may be used wherever necessary as part of Form I-A, these additional sheets should be signed by the owner.
17. The plans of high rise building and telecommunication towers should be certified by a Structural Engineer having the qualification stipulated in these rules.
18. The checklist appended along with Form I-A in triplicate has to be duly filled and submitted along with the application. On receipt of the application by the Grama Panchayat, the checklist shall be verified and one copy shall be returned to the applicant as acknowledgment.
19. The applicant shall be the owner or authorized representative of the owners. Any application made by any person for regularisation who does not have any right over the land or building shall be summarily rejected. If the plot is owned by more than one person, the application shall be submitted jointly and signed by all the persons.
20. If the unauthorised constructions does not conform to the provisions detailed in rule 6(4) of these rules, the application shall be rejected.
21. If the unauthorised construction is carried out in a land acquired for road widening or public land the application shall be rejected.
22. During verification if it is found that the applicant has undertaken further additions, reconstruction or extensions to the existing building after submission of application for regularization, then such application shall be summarily rejected.
23. Once sanction is accorded by the Committee constituted by Government for regularisation, an intimation will be issued by the Secretary informing the owner about the sanction and the conditions to be complied with. After complying with the conditions (if any in order), the owner should submit a letter to Secretary informing that the conditions are complied, along with copies of all NOC's required by the Secretary.
24. An Indemnity Bond as per the format attached along with the rule in Stamp paper worth Rs.100/- may also be submitted along with the letter to Secretary.
25. Regularisation fees may only be remitted after receiving intimation of the same from the Secretary.
26. The compounding fee may be calculated invariably using the compounding fee calculator. A signed copy of this statement should be furnished along with the application.
27. The following documents have to be submitted along with the application, namely:-
Table| Sl.No. | Documents Required | Applicability |
| 1 | 2 | 3 |
| (a) | Receipt for payment of application fee, if anypaid to the Grama Panchayat as per Rule 4 of regularisation rules | Compulsory |
| (b) | Three copies of thedrawings-(i) Three copies eachof the floor plans, elevations and sections of the building(s)constructed, the site plan and wherever applicable the serviceplans, parking plans and specifications drawn as provided insub-rule (11) of rule 7 of the Building Rules, duly signed andcertified in the format given under rule3 (2), (b) by the owner/by the licensee and if applicable by the Structural Engineer whohas issued the structural stability certificate as per the KeralaPanchayat Building (Regularisation of Unauthorised Construction)Rules, 2018.(ii) In the case ofhuts, four copies each of a site plan showing the outline of thebuilt-up area, the boundaries of the plot and nearby streets dulysigned by the owner,(iii) In the case ofconstructions under approved Schemes as mentioned in rule 72 ofthe Building Compulsory Rules with total floor area of buildingupto 60sq.metres and number of floors limited to two and a stairroom, where the construction has to be done by individualsseparately, four copies each of a site plan showing the outlineof the built-up area, the boundaries of the plot and nearbystreets, duly signed by the owner.Note.- (1)the unauthorised construction applied for regularization shall beindicated in red colour outline in the drawings.(2) The following shall be the format forCertificate on the drawings by:- | Compulsory |
| (i) the owner:"Certified that thisis the drawing(s) having reference to the details furnished inForm I-A and documents enclosed along with." | Compulsory | |
| (ii) the Licensee:"Certified that this is the drawing(s) having reference tothe details furnished in Form I-A and documents enclosed alongwith and that the details and measurements there /in conform toactual constructions made in the siteI further certify that, the unauthorisedbuilding(s) under reference is/are structurally stable (notrequired if the unauthorised building(s) is high rise buildingand/or telecommunication tower)"........... | Compulsory | |
| (iii) the Structural Engineer:"Certifiedthat the unauthorised high rise building(s)/ unauthorisedtelecommunication tower(s)/ the building above which suchunauthorized telecommunication tower is erected (strike out whichis/are not applicable) as per the drawings and Form I-A enclosedherewith is/ are structurally stable. (this certification isrequired only if the unauthorised construction is a high risebuilding and/or telecommunication tower) | Compulsory as per applicability | |
| (c) | Documents to proveownership of land such as:(i) Copy of land deed(ii) Copy of TaxReceipt(iii) Copy ofPossession Certificate(iv) Copy of BTRCertificate(v) Attested copy of the survey sketch fromRevenue Department | Compulsory |
| (d) | 4 Nos. of time stamped photographs from all foursides of the unauthorised construction showing all externaldetails of development, which is attested by the applicant andthe licensee | Compulsory |
| (e) | Proof of having carried out the construction ofunauthorised building(s) on or before the 31st day of July, 2017Not | Compulsory |
| (f) | Proof of valid Registration of the licensee | Compulsory except in cases (ii) and (iii) ofitem (b) above |
| (g) | Proof of qualification of Structural Engineerwho has | Compulsory in the case issued the structuralstability certificate of high rise buildings, telecommunicationtowers and building if any above which such telecommunicationtower is erected. |
| (h) | Copies of the cases pending before or direction,judgment etc., by Courts, Tribunal, Ombudsman etc. there ofpertaining to or with reference to the plot or constructionstherin as mentioned in item 9 of the statement in Form I-A | To be compulsorily disclosed by the owner |
| (i) | Copies of any Government orders, circulars, anyform of communication against the plot/land or any constructionworks there in as mentioned in item 10 of Form I-A | To be compulsorily disclosed by theowner/applicant |
| (j) | Proof of having stopped the unauthorisedconstruction works before 31st day of July, 2017, on account ofany communication from the Grama Panchayat or Governmentdirecting to stop the unauthorised construction. | Not Compulsorily |
| (k) | Copies of plans approved and/ or permit(s)issued, if any, by the Secretary | Compulsorily |
| (l) | Orders granting exemption from the provisions ofthe Kerala Building Rules, 1984, obtained earlier | If Applicable |
| (m) | Copy of orders granting exemption from theprovisions of the Town Planning Schemes, obtained earlier | If Applicable |
| (n) | Copy of documentary evidences if any of thedetails of action, taken by the Grama Panchayat concerned againstthe unauthorised construction(s). | If Applicable |
| (o) | Copy of documentary evidence, if any, enclosedwith reference to item 12 of the Statement in this form | |
| (p) | Copy of the resolution made by all owners ortheir association | Applicable and Compulsory in the case ofresidential flat/apartment buildings |
| (q) | Checklist and acknowledgment in triplicate(Appendix IX) | Compulsory |
| (r) | Statement of compounding fee using the feecalculator provided | Compulsory |
| (s) | Copy of Aadhar card of the applicant | Compulsory |
| Applications Reference Number | ................................................................................................... |
| 1 | Name of Applicant(s) | |
| 2 | Building Location | |
| i | Ward No. | |
| ii | Road/Street | |
| iii | Survey No./Sub. Dn. No. | |
| iv | Name of Village | |
| v | Name of Block | |
| vi | Existing Building No. if any | |
| vii | Permit No. if any | |
| viii |
| List of documents enclosed along with theapplication: | Submitted | |||
| 1 | Receipt for payment of application fee | Yes | No. | Na |
| 2 | Three Copies of the drawings | Yes | No. | Na |
| i | Each of the floor Plans | Yes | No. | Na |
| ii | Elevation | Yes | No. | Na |
| iii | Section | Yes | No. | Na |
| iv | Site Plan | Yes | No. | Na |
| v | Location Plan | Yes | No. | Na |
| vi | Service Plan | Yes | No. | Na |
| vii | Parking Plan | Yes | No. | Na |
| 3 | Documents to prove ownership of land | Yes | No. | Na |
| i | Copy of land deed | Yes | No. | Na |
| ii | Copy of Tax receipt | Yes | No. | Na |
| iii | Copy of latest Possession Certificate | Yes | No. | Na |
| iv | Copy of BTR certificate | Yes | No. | Na |
| v | Attested Copy of the survey sketch from revenuedepartment | Yes | No. | Na |
| 4 | Photo of Applicant (s) - affixed | Yes | No. | Na |
| 5 | 4 Photographs of Unauthorised Construction fromall four sides of the building showing all external details ofdevelopment - affixed and attested by owner(s) and Licensee | Yes | No. | Na |
| 6 | Proof of having carried out the construction ofunauthorised building(s) on or before 31st day of July 2017 | Yes | No. | Na |
| 7 | Proof of valid registration of the licensee | Yes | No. | Na |
| 8 | Proof of qualification of the StructuralEngineer who has issued the structural stability certificate | Yes | No. | Na |
| 9 | Copies of the cases pending before or direction,judgment etc., by Courts, Tribunal, Ombudsman etc. pertaining toor with reference to the plot or construction(s). | Yes | No. | Na |
| 10 | Copies of any Government orders, Circulars anyform of communication against the plot/land or construction(s). | Yes | No. | Na |
| 11 | Proof of having stopped the unauthorisedconstruction works before 31st day of July 2017 on account of anycommunication from the Grama Panchayat or Government directing tostop the unauthorised construction. | Yes | No. | Na |
| 12 | Copy of approved plans issued by the Secretaryas per the provisions contained in the Building rules | Yes | No. | Na |
| 13 | Copy of building permit issued by the Secretaryas per the provisions contained in the Act or Building rules. | Yes | No. | Na |
| 14 | Copy of orders granting exemption from theprovisions of the Kerala Building Rules, 1984 if obtained | Yes | No. | Na |
| 15 | Copy of orders granting exemption from theprovision of the Town Planning Schemes if obtained | Yes | No. | Na |
| 16 | Copy of documentary evidence of the details ofaction taken by the Grama Panchayat against the unauthorisedconstruction. | Yes | No. | Na |
| 17 | Copy of the resolution made by all owners ortheir association (For residential apartments) | Yes | No. | Na |
| 18 | Copy of previous orders if any, regularisingconstruction(s) within the plot. | Yes | No. | Na |
| 19 | Copy of documentary evidence or any otherdetails pertaining to or relevant to the unauthorisedconstruction(s) and plot | Yes | No. | Na |
| 20 | Statement of Compounding fee calculated usingthe compounding fee calculator provided | Yes | No. | Na |
| 21 | Copy of Aadhar card of the owner | Yes | No. | Na |
| 22 | Any other documents submitted: | |||
| i | ||||
| ii | ||||
| Total No. of documents | ||||
| Signature of the Applicant: |
| 23. AcknowledgementReceived the application and documents as stated above. |
| Date of receipt : | ||
| Office Seal | Application Reference Number | .................................................................................................... |
| Signature of the Receiver | Designation |
| TheThe Secretary,.............................. Gram Panchayat | affix passportSize Photographof theApplicant(s) |
| 1 | Name and address of the applicant (owner) | :............................................................... | |
| 2 | The number allottedby the Grama Panchayat to the building/nearest building(strike out whichever is not applicable) | :.................................................................................................................................................................................................. | |
| 3 | Details of land | ||
| (i) | Survey Number(s) (with sub- divisions) | :.................................................................................................................................................................................................................................................................. | |
| (ii) | Resurvey Number(s)(with subdivisions if applicable) | :.............................................................................................................................................................................................. | |
| (iii) | Village | :............................................................... | |
| (iv) | Taluk | :............................................................... | |
| (v) | District | :................................................................. | |
| (vi) | Area of the plot in sq.metres | :...............................................sq.metres | |
| 4 | Nature of ownership of land: SaleDeed/Gift/Partition Deed/Puramboke/Others (specify) | ................................................................ | |
| 5 | Date and Number of the documents in proof ofownership of land | :................................................................................................................................................................................................ | |
| 6 | Nature of construction(s): | ||
| (a) | New building/Reconstruction/ Change inoccupancy/Alteration/Addition or Extensions To existingbuilding(s)/Others(specify) | :........................................................ | |
| (b) | Type of roof: Concrete/Tiled/any other(specify):................................................................. | ||
| (c) | Total number of floors | :................................................................ | |
| (d) | Total floor area (sq.metres) of the Authorizedbuilding(s) within the plot | :.................................................sq.metres | |
| (e) | Occupancy/Use of the unauthorized building(s) : |
| Floor (Basement,Ground ,First etc) | Floor area in sq.metres of the respective floor | Occupancy of the respective floor (If more thanoccupancy in the floor, furnish the area of each Occupancy. |
| 1 | 2 | 3 |
| 7 | Date of commencement of the construction | :................................................... | |
| 8 | Date of completion of construction .. | :.................................................. | |
| 9 | Is there any cases pending before or disposedoff by Courts, Tribunal, Ombudsman etc. pertaining to or withreference to the land/plot or building(s) therein. (SpecifyYes/No) | ....................................................... | |
| If Yes, furnish the details | :................................................ | ||
| 10 | Any Government orders, circulars, any form.................................................... ofcommunication againt the plot/land or any Construction workstherein. (Specify Yes/No) | :....................................................... | |
| If Yes, furnish the details | :..................................................... | ||
| 11 | Whether copy of the resolution made by allowners or their association has been furnished (Applicable forresidential apartments) (Specify Yes/No/NA) | :...................................................... | |
| 12 | Any other detailspertaining to or of relevance to the plot and buildings therein(Specify Yes/No)If Yes, furnish the details | :....................................................:................................................................................................................................................................... | |
| 13 | Photographs of the building | (Affix time stamped photographs-minimum fourbuilding numbers showing the four sides of the building showingall external details of development) (Photographs to be attestedby both owner and Licensee) | |
| (Affix time stampedphotograph-minimum four numbers showing the four sides of thebuilding showing all external details of development)(Photographs to be attested by both owner andLicensee) | |||
| 14 | Any remarks on the unauthorized construction tobe submitted by the Applicant: | (use additional sheets if necessary) | |
| 15 | Amount of compounding fee calculated as per theStatement: | ||
| (Use compounding fee calculator. Attach a signedcopy of the Statement of compounding fee) |
2. I............................................... (name of owner) do hereby declare that the unauthorised construction as per the drawings and details enclosed was/were carried out on or before the 31st day of July, 2017, beyond which date, no construction works were carried out unauthorizedly and that the drawings and measurements therein conform to actual constructions made in the site and the unauthorized construction(s) is/are structurally stable.
I also declare that the details furnished in Form I-A, the drawings and other documents/enclosures submitted are correet to the best of my knowledge and belief.I further declare that to the best of my kowledge and belief, there is no court case or direction or communication from any authority including Government specific to the plot or constructions therin, which prevents the regularization of the unduthorised construction.I further declare that I am fully aware of the fact that the Government may at any time cancel the order(s) issued under these rules and take appropriate legal action if the information furnished by me is found false or facts suppressed or misrepresented.................................................................... (Signature of the owner)Name:...................................................Address:..............................................................................................................................................................................................Place: ....................................Date: .......................................14. Certificate And Declaration Of The Licensee Registered Under Chapter XXIII Of The Building Rules
[See proviso to rule 141(5)]I ............................................................................................................................................ ..............................................................................(Name and Reg. No. of licensee) do hereby declare that the unauthorised construction as per the drawings and details enclosed was/were carried out on/before the 31st day of July, 2017, beyond which date no construction works were carried out unauthorisedly.I certify that all the drawings and measurements therein conform to actual constructions made in the site.I further certify that, the unauthorised construction under reference is/are structurally stable. (strikeout this certification if the unauthorised construction is a high-rise building and/or telecommunication tower).I hereby declare that the information furnished in Form I-A, the drawings and the other documents/enclosures submitted are correct to the best of my knowledge and belief. I also declare that to the best of my knowledge, there is no court case and Government communication specific to the plot or constructions therein, which prevent regularisation of the unauthorised construction.I also declare that I have the qualification for the licensee prescribed under these rules, I further declare that I am fully aware of the fact that the Government may, at any time cancel the order(s) issued under these rules and take appropriate legal action, if the information furnished by me are false or the facts are suppressed or misrepresented.......................................................(Signature of the Licensee)Name:...................................................Reg. No. .............................................Address:...................................................................................................................................................................................Place: ....................................Date: .......................................15. Certificate Of The Structural Engineer
(Applicable in the case of high-rise buildings, telecommunication towers and building if any above which such telecommunication tower is erected.)I ............................................................................................................................................ ..............................................................................(Name and address of the Structural Engineer) hereby certify that the unauthorised building(s)/Telecommunication Tower(s) (strikeout which is/are not applicable) as per the drawings and Form I-A enclosed herewith is/are structurally stable.I also hereby certify that the building(s) above which the telecommunication Tower(s) applied for regularisation is/are erected as per the drawings and Form I-A enclosed herewith is/are structurally stable. (strike out his certification if the unauthorised building is not a telecommunication tower erected above a building.)I declare that I have the qualification prescribed as per rule 2(1)(g) of these rules. I further declare that I am fully aware of the fact that the Government may, at any time cancel the order(s) issued under these rules and take appropriate legal action, if the information furnished by me are false or facts were suppressed or misrepresented.........................................................(Signature of the Structural Engineer)Name:...................................................Address:.............................................................................................................................................................................Place: ....................................Date: .......................................Form-I B(see rule 6 (1))[The Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018]Detailed Report of the Secretary(To be prepared in duplicate)To be furnished by the Secretary of the Grama Panchayat concerned as prescribed under rule 6 of the Kerala Panchayat Building (Regularisation of Unauthorised Construction) Rules, 2018................................................................................ Grama PanchayatInspection and Verification Report| 1 | Application Received on | :.......................................................................... | |
| 2 | Verified on | :.......................................................................... | |
| 3 | Inspected on | :.......................................................................... | |
| 4 | Particulars of Land | ||
| (a) | Area of Land/ Plot | :...........................................................sq.metres | |
| (b) | Survey No. and Name of Village | : | |
| (c) | Re-survey No. and Name of Village | : | |
| (d) | Nature of ownership of land (strike out the notapplicable) | : SaleDeed/Gift/Partition Deed/Puramboke/Others (specify) ................................................... | |
| 5 | Particulars of the construction/building(s) | :........................................................................ | |
| (a) | Occupancy of the construction/buildings | :...................................................................... | |
| (b) | Built-up/Floor Area | :.............................................................................. |
| Sl. No. | Area Description | Authorised Buildings | Unauthorised Buildings | Total Area (sq. metres) |
| 1 | 2 | 3 | 4 | 5 |
| (8) | Total Built-up area(sq.metres) |
| 2 | Total Floor area(sq. metres) |
| 8 | Remarks on the authorized andunauthorised construction/building in the site, includingbuilding rule violations:....................................................................................................................................................................................................................................................................................................................................(use additional sheets if required. Additional sheets must becertified) |
| 9 | Whether any additions, reconstructions or extensions have beenfound to be carried out in the building after submission of application forregularization on site verification (Specify Yes/ No.)If Yes, details of constructions carried out..................................................................... |
8. Details of the Violation of provisions relating to safety and security in the Building Rules: (See Appendix II)
| Sl.No. | Provision | Violations Specify Yes/No | If Yes, specify the extent of violation |
| 1 | 2 | 3 | 4 |
10. Violation of the provisions of Town Planning Schemes, if any:
| Sl.No. | Name of Scheme | Status of the Scheme (Sanctioned/Published) | Violation |
| 1 | 2 | 3 | 4 |
11. Violations with regard to other applicable Central and State Statutes, if any:
| Sl.No. | Provision | Violations |
| 1 | 2 | 3 |
11. Recommendations Of The Secretary:
| (a) | Whether the unauthorised construction, as perdrawings and details enclosed with Form IA,- | ||
| (i) | was carried out on or before 31st day of July,2017 | : ......................................... | |
| (ii) | violates the safetyand security provisions in the Building Rules as per Appendix II(Please specify:Yes/No)1. violates any provision of the Town PlanningSchemes, sanctioned by Government (Please specify: Yes/No) | :....................................................:.................................................... | |
| (b) | Whether there is anycourt case specific to the plot or constructions therein, whichprevents regularisation of the unauthorised construction(s)(Please specify: Yes/No)If Yes, please furnish the details: | :.................................................... | |
| 14 | Whether there is anyGovernment Orders/ Circulars/any form of communication againstthe plot/land or any construction works therein which preventsregularisation of the unauthorised building(s) (Please specify:Yes/No)If yes, please furnish the details | ...................................................................: ..................................... | |
| (d) | Whether anyconcurrence/approval/NOC etc. is required as per the BuildingRules from Various Central or State Government Departments andagencies such as Fire and Rescue Department, State levelEnvironment Impact Assessment Authority/Ministry of Environmentand Forests of Government of Coastal Zone Management Authority,Airports Authority, Railway Authorities, Defense Authorities, TheKerala State Pollution Control Board, District Collector, ChiefElectrical Inspector etc. (other than those required from theDepartment of Town and Country Planning)(Please specify:Yes/No.)If Yes, please furnish the details of therequired concurrence/approval/NOC etc. is required details below: | :..................................................................India, |
| Rule | Agency from which concurrence/approval/NOC |
| ................... | ....................................................................... |
| ................... | ....................................................................... |
| ................... | ....................................................................... |
| ................... | ....................................................................... |
| ................... | ....................................................................... |
| ................... | ....................................................................... |
| (e) | Whether theconstruction violate any law, such as Acts, rules, byelaws etc.(other than the Kerala Panchayat Raj Act, 1994 and the KeralaPanchayat Building Rules, 2011)(Please specify:Yes/No.)If yes, please furnish the details | :...........................................................................:......................................................... | |
| (f) | Whether copy of the resolution made by allowners or their association has been furnished (Applicable forresidential apartments) (Specify Yes/No/NA) | :....................................................... | |
| (g) | Whether there is anyother important matter which has bearing on the regularisation ofthe unauthorized construction(Please specify:Yes/No)If Yes, please furnish the details : | :........................................................................................................ | |
| (h) | Recommendations ofthe Secretary Whether the unauthorised construction isrecommended for regularisation(Please specify:Yes/No)If Yes, please specify the conditions forregularization, if any; | :................................................... | |
| If No, the grounds for not recommendingregularisation | :........................................... | ||
| 12 | Amount of compounding fee to be remitted, ifrecommended for regularisation under the Kerala PanchayatBuilding (Regularisation of unauthorised Construction) Rules,2018 | ..................................................... | |
| (The compounding fee must be calculated usingthe compounding fee calculator provided. Attach a signed copy ofthe Statement of compounding fee) | |||
| 13 | Whether details ofthe unauthorized construction having been published in thewebsite and notice board(Please specify: Yes/No) | ................................................. |