Search Results Page

Search Results

1 - 10 of 237 (0.58 seconds)

Bypl vs . Md.Danish & Ors. on 29 August, 2014

wire. The total connected load was found as 18.389 KW/ DX/DT. Videography showing the irregularities was conducted by one photographer Parvesh ... Arora Photo Studio. Videography could not be conducted due to parda system and hindrance by user for proper assessment of connected load at site. During
Delhi District Court Cites 15 - Cited by 0 - Full Document

Bypl vs . Fakeer Chand on 1 May, 2014

first floor and used the load of 4.413 KW. That the necessary videography was conducted by Sh. Sunil (From M/s Arora Photo Studio ... memo (Ex. CW 2/C) bore his signatures at point X. Necessary videography (Ex. CW 2/D) was taken by videographer Sunil at site. Accused
Delhi District Court Cites 10 - Cited by 0 - Full Document

Bypl vs . Shammi on 5 March, 2014

line of the company which was being used for domestic purpose. The videography of the direct theft was taken by the M/s. Arora Photo ... electricity qua the connected load and mode of theft was covered by videography by the Videographer who was present alongwith team at the site
Delhi District Court Cites 11 - Cited by 0 - Full Document
1   2 3 4 5 6 7 8 9 10 Next