[Cites 0, Cited by 0] [Section 6] [Entire Act]

Union of India - Subsection

Section 6(2) in Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019

(2)In case of mismatch of the date of commercial operation of the transmission system and the transmission system of other transmission licensee, the liability for the transmission charges shall be determined as under:
(a)Where an interconnected transmission system of other transmission licensee has not achieved the commercial operation as on the date of commercial operation of the transmission system (which is not before the SCOD of the interconnected transmission system) and the Commission has approved the date of commercial operation of such transmission system in terms of clause (2) of Regulation 5 of these regulations, the other transmission licensee shall be liable to pay the transmission charges of the transmission system in accordance with clause (5) of Regulation 14 of these regulations to the transmission licensee till the interconnected transmission system achieves commercial operation:
(b)Where the transmission system has not achieved the commercial operation as on the date of commercial operation of the interconnected transmission system of other transmission licensee (which is not before the SCOD of the transmission system), the transmission licensee shall be liable to pay the transmission charges of such interconnected transmission system to the other transmission licensee or as may be determined by the Commission, in accordance with clause (5) of Regulation 14 of these regulations, till the transmission system achieves the commercial operation.