Section 39(1) in Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2017

(1)Normative annual O&M expenses for the control period shall be as follows:-
Sr. No. Category of Project Annual O&M expenses Rupees in Lac per MW
(i) Above 100 kW to 2 MW capacity 33
(ii) Above 2 MW to 5 MW capacity 29
(iii) Above 5 MW to 25 MW capacity 24