Section 5(13)(d) in Madhya Pradesh Electricity Balancing and Settlement Code, 2015
(d)State Load Despatch Centre shall round-off actual loss of nth Week to nearest 0.01% for the purpose of Scheduling for the (n+2)th Week (e.g. 4.705% is rounded-off to 4.71%, 3.442% is rounded off to 3.44% and so on);