Section 2(19)(ii) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009
(ii)for run-of-river hydro power generating stations with pondage and storage-type power stations, the ex-bus capacity in MW expected to be available from the generating station over the peaking hours of the next day, as declared by the generating station, taking into account the availability of water, optimum use of water and availability of machines and for this purpose, the peaking hours shall not be less than three (3) hours within a twenty-four (24) hour period;