Section 2(19) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009

(19)"Declared Capacity" means -
(i)for a thermal generating station, the capability of the generating station to deliver ex-bus electricity in MW declared by such generating station in relation to any period of the day or whole of the day, duly taking into account the availability of fuel:
Provided that in case of a gas turbine generating station or a combined cycle generating station, the generating station shall declare the capacity for Units and Modules on gas fuel and liquid fuel separately, and these shall be scheduled separately. Total declared capacity and total scheduled generation for the generating station shall be the sum of the declared capacity and scheduled generation for gas fuel and liquid fuel for the purpose of computation of Availability and Plant Load Factor, respectively;
(ii)for run-of-river hydro power generating stations with pondage and storage-type power stations, the ex-bus capacity in MW expected to be available from the generating station over the peaking hours of the next day, as declared by the generating station, taking into account the availability of water, optimum use of water and availability of machines and for this purpose, the peaking hours shall not be less than three (3) hours within a twenty-four (24) hour period;
(iii)for run-of-river hydro power generating stations without pondage, the ex-bus capacity in MW expected to be available from the generating station during the next day, as declared by the generating station, taking into account the availability of water, optimum use of water and availability of machines;