Legal Document View

Unlock Advanced Research with PRISMAI

- Know your Kanoon - Doc Gen Hub - Counter Argument - Case Predict AI - Talk with IK Doc - ...
Upgrade to Premium
[Cites 0, Cited by 0] [Entire Act]

State of Odisha - Section

Section 8 in Orissa Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulation, 2005

8. Criteria for allowing open access to intra-state transmission and/or distribution systems.

(1)Long-term access shall be allowed in accordance with the transmission and distribution planning capacity criteria stipulated in the Orissa Grid Code and/or the Orissa Distribution (Planning and Operation) Code, as the case may be.
(2)Short-term access shall be allowed if the request can be accommodated by utilising;
(a)Inherent design margins;
(b)Margins available due to variation in power flows and unutilised capacity, if any;
(c)Margins available due to in-built spare capacity in transmission and/or distribution systems created to cater to future load growth.