Section 30(7)(i) in The Bangalore Metro Railway (General) Rules, 2011
(i)Failure of main car lighting on one or two cars shall be reported by the Train Operator to the Operations Control Centre and the train may continue in passenger service to the end of its trip provided the emergency lighting is working satisfactorily and at the terminal it shall be withdrawn from service or replaced by a good train;