Section 22 in The Central Electricity Regulatory Commission (Open Access in Inter-State Transmission) Regulations, 2004

22. [ Time-schedule for processing Application. [Inserted by Notification No. L-7/25(5)/2003-CERC dated 21.02.2005, w.e.f. 1.4.2005.]

- (i) In addition to the time schedule prescribed under regulation 6 for processing of applications for advance reservation, as far as practicable, the following time schedule shall be adhered to by the respective nodal agency for processing of the application for grant of access, namely:-
S.No. Type of service /activity Maximum Processing time
1. Short-term Service (for the period to betreated on first-come-first-served basis)  
  Up to one week 2 days
  More than a week 3 days
2. Long-term Service  
  Intimation regarding feasibility of accesswithout system strengthening 30 days
  Intimation of results of studies for systemstrengthening with cost estimates and completion schedule 90 days
(ii)Day ahead transaction
(a)The advance payment of transmission charges, operating charge and application fee shall not be insisted upon. These payments can be made within 3 working days of making of application.
(b)A composite request for open access and scheduling shall be sent to the nodal Regional Load Despatch Centre through the State Load Despatch Centre concerned latest by 3.00 PM. The nodal Regional Load Despatch Centre shall take steps to incorporate the request for open access in the schedules to be issued by the Regional Load Despatch Centres concerned, if the request can be accommodated without causing congestion.
(c)A composite request for open access and scheduling to utilise surpluses known after issuance of the first despatch schedule by Regional Load Despatch Centres at 5.00 PM, must be submitted to the nodal Regional Load Despatch Centre latest by 10.00 PM or preferably earlier. The nodal Regional Load Despatch Centre shall endeavour to incorporate the same in the revised despatch schedule to be issued by the Regional Load Despatch Centres concerned, if the request can be accommodated without causing congestion.
(iii)Same Day transactions
(a)The advance payment of transmission charges, operating charge and application fee shall not be insisted upon. These payments can be made within 3 working days of making of application.
(b)In the event of emergency, the beneficiaries/buying utility may locate a source of power to meet short-term emergency requirement on the same day and forward request for open access to the nodal Regional Load Despatch Centre through the concerned State Load Despatch Centre. The Regional Load Despatch Centres shall endeavour to accommodate such emergency requests as soon as and to the extent practically feasible.]