State of Rajasthan - Section

Section 102 in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009

102. Pooling of Annual Revenue Requirement by STU.

(1)Total Transmission system Cost (TTSC) for the intra-State transmission system within Rajasthan shall comprise sum of annual revenue requirement of all transmission licensees, as determined based on the principles outlined under these MYT Regulations.nTTSC = ∑ [ARR - NTi - Oi]i=1Where
TTSC = Total Transmission System Cost for intra-State Transmissionsystem within Rajasthan to be pooled by STU
ARR = Aggregate Revenue Requirement of the Transmission Licensee,including all allowable expenses and return on equity capital, asapproved by the Commission but shall exclude the transmissionsystem exclusively embedded for generating projects
NTi = Approved level of non-tariff income for each Transmissionlicensee
Oi = Approved level of income from Other Business for eachtransmission licensee