Section 5(13)(e) in Madhya Pradesh Electricity Balancing and Settlement Code, 2015
(e)Events in the Grid of an exceptional nature could result in abnormally high or low losses in any Week. This could be either a Load crash in the State due to a Weather disturbance or closure of any Major Hydro Power Station during the monsoon for flushing of silt/debris froM the Reservoir or Outage of any major Transmission Lines etc. The losses for these abnormal weeks shall generally be ignored as far as the Scheduling process is concerned. State Load Despatch Centre decision in this regard will be final.