Section 20(1)(h) in Rajasthan Electricity Regulatory Commission (Metering) Regulations 2007
(h)One Engineer, connected with metering, from CPPs (installed capacity exceeding 50 MW& connected to the RVPN's transmission system), to be nominated by the Chairman of the Panel.