Section 7(1)(ii) in Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006
(ii)In the event the Appropriate Commission allows supply of electricity directly from a generating company to consumer on a dedicated transmission system, the location of the meter will be as per their mutual agreement.