[Cites 0, Cited by 0] [Section 5] [Entire Act]

State of Bihar - Subsection

Section 5(2) in Bihar Electricity Commission (Standards of Performance of Intra Transmission Licensees) Regulations, 2019

(2)Failure of Inter-Connecting Transformer (ICT) and Reactor shall not be counted for the purpose of calculation of availability of Inter-Connecting Transformer and Reactor.
(iv)The element-wise monthly availability shall be certified by the SLDC or Member Secretary of the State Power Committee.
(b)Restoration time. - Restoration time for different types of failures of transmission line and Inter-Connecting Transformer (ICT) and reactors shall not exceed the following time limit:
Sl. No. Types of failures Restoration Time (Days)
1. Insulator failure
Plain Terrain 1
Hilly Terrain 2
2. Tower after collapse by Emergency RestorationSystem (ERS) 12
3. Tower after collapse
Plain Terrain 30
River Bed 50
Hilly Terrain 50
4. Snapping of phase conductor
Plain Terrain 2
Hilly Terrain 3
5. Failure of earth wire
Plain Terrain 2
Hilly Terrain 3
6. Failure of Inter Connecting Transformers (ICTs)
Restoration of the failed ICT 120
7. Failure of Reactors
Restoration of the failed reactor 120