system was implemented in
Chidambaram town during the year 1969. Due to aging of pipes in
collection system and pumping main the old UGS system ... House service Connections could be
given. Presently 6312 HSC are shifted to new system and the remaining
HSC will be shifted on or before
coal
gradation has been shifted from UHV ('A' to 'G' grades) to GCV system
(G1 grade to G17 grade
reactor
adjacent to the
MEE, the
same need to
be removed
and shifted to
other place.
Elevat ... having closed solvent tank having scrubber. They are proposing to shift all
loop system solvent tanks at one place.
for solvent
handling to
minimize
other industries where the
Online Continuous Emission Monitoring System (OCEMS)
for providing interlocking system as directed by them in
3
this case and submit ... issue of interlocking system where
OCEMS are installed and compliance of directions of the Tribunal on the
issue of shifting of polluting industries. After consideration
immediately where there is no MDSS
system. |
-COMPLIED- |
(Copy of the action taken by VPT on |
shifting of dusty cargo is enclosed for
reference please
only treated water will be let out into the river.
Hence the shifting of the Head works to Vilamarathur was not followed
upon. Bhavani River ... water is not collected and treated as there was no underground
sewage system and sewage treatment plant was not established in
Sirumugai. In order
part of rejuvenation project of Villivakkam Lake and other
eco-restoration systems which incorporate biological park and eco-park as
part of restoration of water ... They are also directed to ascertain as to whether this can be shifted
to any other place or other than water spread area or tank
respiratory
system of humans. Despite, the request to the 3rd respondent to either
mitigate the same or to shift his industry to an industrial zone
bere is ne MOSS System.
Nat Foals, AS per Be akon Plan
sub he
cont § cacking yards proposed te be shifted
we the sreae created
capping of waste and contaminated soil along with storm water
drainage system with a cost of about Rs. 12 crores. Afterwards, groundwater remediation
by applying ... TNPCB letter dated 10.04.2021
is enclosed as Annexure-II.
The option of shifting accumulated waste at M/s TCCL site, Ranipet to TSDF secure
landfill