Search Results Page

Search Results

1 - 10 of 707 (0.54 seconds)

Section 5 in The Energy Conservation Building Code Rules, 2018 [Entire Act]

building accompanied by - (a) the duly completed compliance forms together with check list of various components covered under rule (3) at the completion stage which ... power factor and power distribution losses; (vii) review the required check metering and monitoring system. (b) a list of the energy related building features
Union of India - Section Cites 0 - Cited by 0

Section 2 in Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019" (hereinafter referred to as "Net Metering Regulations, 2019") [Entire Act]

Grid Interactive System based on Net Metering) Regulations, 2019" (hereinafter referred to as "Net Metering Regulations, 2019") 2. Definitions, Abbreviations and Interpretations ... which generating plant is synchronised with the grid system; (6) "Check Meter" means a meter, which shall be connected to the same core
Union of India - Section Cites 0 - Cited by 0

Section 8 in Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019" (hereinafter referred to as "Net Metering Regulations, 2019") [Entire Act]

Metering) Regulations, 2019" (hereinafter referred to as "Net Metering Regulations, 2019") 8. Metering Arrangement. - 8.1. The metering system shall ... Solar Energy Meter shall have facility for recording meter readings using Meter Reading Instrument (MRI) or wireless equipment. 8.4 Check Meters shall be mandatory
Union of India - Section Cites 0 - Cited by 0

Section 17 in Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019 [Entire Act]

Cross Border Trade of Electricity) Regulations, 2019 17. Metering Arrangements. (1) Interface Meters (Main Meter, Check Meter and Standby Meter) shall be installed at both ... Agencies of both the countries shall confirm the availability of Main Meter, Check Meter and Standby Meter to System Operator of respective country. (3) Interface
Union of India - Section Cites 0 - Cited by 0
1   2 3 4 5 6 7 8 9 10 Next