violation of any of the provisions of the IEGC and incidences of persistent non-compliance of the directions of the RLDCs issued in order ... achieving the maximum economy and efficiency in the operation of the power system in the region under its control. (ii) The Regional Power Committee
violation of any of the provisions of the IEGC and incidences of persistent non-compliance of the directions of the RLDCs issued in order ... achieving the maximum economy and efficiency in the operation of the power system in the region under its control. (ii) The Regional Power Committee
The Delhi Metro Airport Express Line, General Rules, 2010
DELHI
India
The Delhi Metro Airport
Bihar Electricity Grid Code, 2010
BIHAR
India
Bihar Electricity Grid Code, 2010
Rule BIHAR-ELECTRICITY
Under/Over Voltage - If there is a complaint from a consumer regarding persistent under or over voltage, each licensee shall take corrective measures within ... problem is local. If such correction requires augmentation of the distribution system and/or re-routing of the distribution line etc. such time period will
Billing and Payment of charges.
(1) Bills shall be raised for the system operation charge and market operation charge on monthly basis by the CSPSOC ... made by the respective intra-State entities directly to the CSPSOC. (2) Persistent default in payment of SLDC fee and charges would be brought
Under/Over Voltage - If there is a complaint from a consumer regarding persistent under or over voltage, each licensee shall take corrective measures within ... problem is local. If such correction requires augmentation of the distribution system and/or re-routing of the distribution line etc. such time period will
schools monitored. 4.3.3.2 There has been a general tendency in the system to load the syllabus of early classes with topics which were earlier introduced ... attempt to redress this problem to a certain extent, but the tendency persists and takes different forms. In j several states, syllabus revision
trapped - Red flashing, unless sensors detect all doors clear, Platform Screen door system will not give clearance for train departure; (b) in case of detection ... driver can open and close the doors again and if the problem persists, then, station staff shall attend the affected door
Billing and Payment of charges.
(1) Bills shall be raised for the system operation charge and market operation charge on monthly basis by the CSPSOC ... made by the respective intra-State entities directly to the CSPSOC. (2) Persistent default in payment of SLDC fee and charges would be brought