catch-pit, gully pit, chamber, gutter and the like. (d) Cantilevered roof projection upto 3'-0" projected from the finished level of the wall ... load to the ground. (xxxii) Gallery: means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor
catch-pit, gully pit, chamber, gutter and the like. (d) Cantilevered roof projection upto 3'-0" projected from the finished level of the wall ... load to the ground. (xxxii) Gallery: means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor
catch-pit, gully pit, chamber, gutter and the like. (d) Cantilevered roof projection upto 3'-0" projected from the finished level of the wall ... load to the ground. (xxxii) Gallery: means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor
catch-pit, gully pit, chamber, gutter and the like. (d) Cantilevered roof projection upto 3'-0" projected from the finished level of the wall ... load to the ground. (xxxii) Gallery: means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor
Fire Department is required for this relaxation]; (2) Setback of projected portion of roof level. - The projected portion of parapet, flues, ducts, water storage tanks ... from the facade by a minimum distance equal to their height above roof level, failing which these shall be counted in calculating the height
xiii) 'Canopy' shall mean a projection from the top of the parapet wall or a continuation of a flat roof beyond the face ... sloping roofs and to the highest level of the building in the case of buildings with flat roofs excluding the projected portions of mamties, flues
Development Authority Building Rules, 2013
26. Set back of projected portion of roof level.
- The projected portion of parapet, flues, ducts, water storage tanks, mumties ... from the facade by a minimum distance equal to their height above roof level, failing which these shall be counted in calculating the height
Development Authority (Building) Rules, 1996
26. Set back of projected portion of roof level.
[Section 180(2)(i)]. - The projected portion of parapet, flues, ducts ... from the facade by a minimum distance equal to their height above roof level, failing which these shall be counted in calculating the height
includes foundation, plinth, walls, floors, roofs, chimneys, plumbing and building services, fixed platforms, veranda, balcony, cornice or projection, part of a building or anything affixed ... standalone project" means any project which is independent with regard to its location, approach and is not a part of any other project; (193) "stilt
indoor games or entertainment. It shall be permissible in shopping arcades or projects in Municipal areas; (zs) "Site coverage" means ground area covered ... gutter; and (v) electric meter, generator room with temporary roof, guard room. (zt) "stand alone project" means any project which is independent with regard