machinery to the optimum which resulted in slow progress of work which caused huge loss. The defendants being
responsible for lower productivity and consequential loss ... site and commence the work. Commencing of work by the plaintiff that too with inadequate
equipment rendered slow progress of the work right from
work. He holds that the letters issued by the respondent, and
relied upon by them, to claim that the progress of the work was slow ... Agreement (C-46) thereby
complaining that there was slow progress of the work without any
reason. On 7.12.1984 (C-47), the petitioner sent its reply
work despite issuance of many notices including
notice issued for slow progress of work and intimation for damages under Clause 10.3.2 of the
Contract Agreement ... dated
11.01.2018 (Extremely Slow Progress).
9. Authority Engineer Letter No. STUP/NH37/NR/TK/2017/242 dated
01.02.2018 (Slow Progress and intimation of damages
agreed, in the reply to the termination letter, that the slow progress of the
work was for reasons "beyond our control". Thus ... effect, the Petitioner
admitted in its letter that there was slow progress of work. In the said reply
to the termination letter dated 12th July
obtained on minute's call. As stated earlier,
the slow progress of the work has happened only due to the
compelling circumstances ... defendant No.1 has written to the plaintiff
about the slow progress of work. On 6th of November, 2011 plaintiff has
again written a communication
stood thus, the 1st Defendant issued 7 days notice
for slow progress of work vide letter dated 23.01.2009. The
Plaintiff in its letter dated ... Defendant sent 7 days' notice to the Plaintiff for
slow progress of work vide letter dated 23.01.2009. The
Plaintiff replied on 27.01.2009 stating that
work of construction of pile with mutual consent. However,
as the progress of work of piling being executed by other Agency was very
slow, there ... 2009
agency doing foundation work. Considering slow progress of work of
other agency, part of that agency's work, pile caps were entrusted
tune of Rs. 60,00,000/ and that slow
progress of the work was completely due to nonavailability of
stipulated materials, drawings/details ... only two tons of steel was
made available resulting in slow progress of work.
VIII) Vide letter dt. 20.07.1998 plaintiff informed the defendants that
months. It could not be finished due to slow progress of building work. Petitioner made 2 claims that due to rise in prices, his rates ... should be enhanced by 22% and that due to slow progress of building work, his labour remained idle and he should be allowed
several occasions to the NCIPL
regarding the slow progress and gave notices to get the work completed
at the risk and costs of NCIPL ... progress
could be made. The Clients terminated the contract with NBCC on 5th
October 1989 for three reasons. The first being slow progress of work