State of Rajasthan - Act
Fee Rules Notification, 2009
RAJASTHAN
India
India
Fee Rules Notification, 2009
Rule FEE-RULES-NOTIFICATION-2009 of 2009
- Published on 22 September 2009
- Commenced on 22 September 2009
- [This is the version of this document from 22 September 2009.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short title and commencement.
2. Definitions.
- (i) In these rules, unless the context otherwise requires. -(a)"Act" means the Rajasthan Road Development Act 2002 (Act No.5 of 2002)(b)"base year" means the period from 1st April 2010 to 31st March 2011;(c)"bypass" means a section of the state highway bypassing a town or city;(d)"concessionaire" means a person with whom an agreement has been entered into under section 5 of the Act;(e)"elevated highway" means any section of state highway raised above ground level through support of peirs or columns;(f)"executing authority" means an. officer or authority notified by the State Government under section 5 of the Act;(g)"financial year" means the year commencing on the 1st day of April of a year and ending on 31st day of March of the succeeding year;(h)"gross vehicle weight" in respect of any vehicle means the total weight of the vehicle and load certified and registered by the registering authority as permissible for that vehicle under the Motor Vehicles Act, 1988 (59 of 1988);(i)"lane" means a lane forming part of the main carriage way and having a minimum width of three meters and fifty cent meters;(j)"mechanical vehicle" means any vehicle driven under its own power including a motor vehicle as defined under the Motor Vehicles Act, 1988;(k)"notification" means a notification published in the Official Gazette;(l)"private investment project" means a project relating to section of state highway, permanent bridge, bypass or tunnel, as the case may be, for which an agreement is entered into with a concessionaire;(m)"public funded project" means a project which is not a private investment project, as defined in clause (1) above and includes a private investment project in respect of which the agreement has expired;(n)"State" means the State of Rajasthan.(o)state highway means any state highway, district road or other district road or village road within the territory of the State;(p)toll plaza" means any building, structure or booth made for collection of fee.3. Levy of Fee.
4. Base rate of fee.
| Type of Vehicles | Base rate of fee per km (in rupees) |
| Car, Jeep, Van, Light Motor Vehicle or Tractorwith trolley carrying non agricultural produce. | 0.80 |
| Light Commercial Vehicle, Light Goods Vehicle orMini Bus | 1.20 |
| Bus or truck | 2.40 |
| Heavy Construction Machinery (HCM) or EarthMoving equipment (EML) or Multi Axle Vehicle (MAV ) Three to sixaxles | 4.00 |
| Oversized Vehicles (seven or more axles) | 4.80 |
| Base rate of fee (Rupees per vehicle per trip) | |||||
| Cost of permanent bridge, bypass or tunnel(rupees in Crore) | Car, Jeep, Van or Light Motor Vehicle | Light Commercial Vehicle Light Goods Vehicleor Mini Bus | Truck or Bus | HCM, EME, or MAV | Oversized Vehicle |
| 5.0 to 7.50 | 5.0 | 7.5 | 15.0 | 22.0 | 30.0 |
| For every additional rupees five crore or partthereof, exceeding rupees seven point five crore and up to rupeesone hundred crore. | 1.0 | 1.50 | 3.0 | 4.50 | 6.0 |
| For every additional rupees five crore or partthereof, exceeding rupees one hundred crore. | 0.75 | 1.15 | 2.25 1 | 3.40 | 4.50 |
5. Annual revision of rate of fee.
| [| WPI A-WPI BWPI B| ]| x 0.40 |
| Applicable rate of fee : 0.824 +0.824 x| [| 105-100100| ]| x 0.4 = 0.84 |
6. Collection of fee.
7. Remittance and appropriation of fee.
8. Location of toll plaza.
9. Discounts.
| Amount payable | Maximum number of one way journeys allowed | Period of validity |
| One and half times of the fee for one wayjourney. | Two | twenty four hour, from the time of payment. |
| Two-thirds of the amount of fee payable forfifty single Journeys. | Fifty | One month from the date of payment. |