State of Rajasthan - Section

Section 58 in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009

58. Demonstration of declared capability.

(1)The generating company may be required to demonstrate the declared capability of its generating station as and when asked by the State Load Despatch Centre. In the event of the generating company failing to demonstrate the declared capability, the capacity charges due to the generator shall be reduced as a measure of penalty.
(2)The quantum of penalty for the first mis-declaration for any duration/block in a day shall be the charges corresponding to two days fixed charges. For the second mis-declaration the penalty shall be equivalent to fixed charges for four days and for subsequent mis-declarations in the year, the penalty shall be multiplied in the geometrical progression.
(3)The operating logbooks of the generating station shall be available for review by the State Power Committee, as the case may be. These books shall keep record of machine operation and maintenance.