Inserted by Act No. 44 of 2016.] (n) hypothecation means a charge in or upon any movable property, existing or future, created by a borrower ... security for financial assistance and includes floating charge and crystallisation of such charge into fixed charge on movable property; (na) [ "negotiable document" means a document
fixed from time to time and conditions of his licence. (2) The charges for electricity supplied by a distribution licensee shall be– (a) fixed ... electricity supplied by a distribution licensee may include– (a) a fixed charge in addition to the charge for the actual electricity supplied; (b) a rent
clause (c) of section 36, the Tribunal may— (i) fix such rate or charge as it considers reasonable from any date as it may deem ... amount, if any, as being the excess of the rate or charge fixed by the Tribunal under clause
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed charge)
Unit ... Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed charge)
Unit
Section 1 in Fixing Rates To Be Charged By Ships Engaged in Coasting Trade of India For Carriage of Passengers Under Section ... previous notifications on the subject, the Central Government hereby fixes with effect from the 1st May, 1975, the rates mentioned in columns
cent of the trunk charge for unit of ordinary category, subject to a minimum charge of 50 P.
(ii) Fixed Time call.
(a) on trunk ... Important etc.) of the trunk call. Note 2. - The particular person charge, Fixed Time Charge and subscription Fixed Time charge will be levied only
fund manager, by the fund, which is in the nature of fixed charge and not dependent on the income or profits derived by the fund ... section (3) of section 9A are satisfied and such fixed charge has been agreed by the fund manager in writing at the beginning
specified in the procurement plan (over and above total energy required). (h) Fixed cost pertaining to such alternate firm source of power, if any, shall ... incremental cost on own generation and power purchase shall be computed and charged on the basis of actual variation in fuel cost and power purchase
Power Purchase Sources
% age allocation MW
Previous Year
Energy MU
Fixed Charge rate (Rs/MW)
Fixed charge Rs. Cr.
Energy Rate Rs./kWh
Energy charge ... Fixed charge Rs. Cr.
Energy Rate Rs./kWh
Energy charge Rs. Cr.
Total Charges Rs. Cr.
Avg. Tariff Rate Rs./kWh
Energy MU
Fixed Charge
Plant Load Factor.
(1) Threshold Plant Load Factor for determining fixed charge component of tariff for the power projects which use Municipal Solid Waste ... Plant Load Factor.
(1) Threshold Plant Load Factor for determining fixed charge component of Tariff shall be: (a) During Stabilisation: 60% (b) During the remaining