Search Results Page

Search Results

1 - 8 of 8 (0.40 seconds)

Section 2 in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009 [Entire Act]

generation (44) "Primary Energy" means the quantum of energy generated annually from hydel station up to the design energy ; (45) "Rated Voltage" means the design ... Sources" means and includes non-conventional renewable generating sources such as mini hydel, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration
State of Rajasthan - Section Cites 0 - Cited by 0

Section 13 in Rajasthan Land Revenue (Allotment of Land for Setting up of Power Plant based on Renewable Energy Sources) Rules, 2007 [Entire Act]

Biomass :   b) SPV SPY - Wind Hybrid :   c) Wind :   d) Mini-Small Hydel :   e) Biogas : III Details of Proposed Power Projects   a) For Biomass based Power ... manufacturing of WEGs, or experience in generation of grid quality power. : e) Hydel Power Plant:   i) Capacity of proposed Mini/Micro Estimated annual generation
State of Rajasthan - Section Cites 0 - Cited by 0
1