Demand For Mobile Soil Testing Vans In The Country For The Welfare Of The Farmers. on 31 March, 2017
Sixteenth Loksabha
an>
Title: Demand ... mobile soil testing vans in the country for the welfare of the farmers.
श्रीमती हेमामालिनी ( मथुरा ) : महोदय, धन्यवाद। मेरा सब्जेक्ट देश के किसानों के बारे
Need To Review Decision To Close The Regional Soil Testing Laboratories Under ... on 29 March, 2017
Sixteenth Loksabha
an>
Title: Need to review decision ... close the Regional Soil Testing Laboratories under Rubber Board.
SHRI JOSE K. MANI ( KOTTAYAM ): The Regional Soil Testing Laboratories were established by the Rubber Board
Need To Set Up Soil Testing Laboratories At Block Level In Jalaun Parliamentary ... on 9 March, 2017
Sixteenth Loksabha
an>
Title: Need ... soil testing laboratories at block level in Jalaun Parliamentary Constituency, Uttar Pradesh.
श्री भानु प्रताप सिंह वर्मा (जालौन) ः मेरे लोक सभा क्षेत्र जालौन, गरौठा
known At present posted as Assistant Sub
Divisional Officer, Soil Testing Lab, Samastipur
55. Sri Prabhat Son of not known At present posted as Assistant ... Divisional
Officer, Soil Testing Lab, Samastipur
56. Vijay Kumar Son of not known At present posted as Block Agriculture Officer,
Shivhar
57. Ashok Kumar Panjiar
2017 2
'column foundation'. But later, on conducting soil test it has
found that column foundation was not enough and that 'pile ... putting foundation
and the change brought out now based on the soil
testing necessitated piling foundation as designed
by the Architect appointed by the Master
plaintiff would be required to do Geotech Investigation which
involves soil testing. The plaintiff, however, was prevented from doing so
by the defendant ... ground that the soil testing had already been
carried out for the said bridge before awarding the contract and the
plaintiff was requested to proceed
main cause for the same
was the soil testing. Without obtaining the test report of soil,
designs could not have been finalized. Later the defendant ... belatedly entrusted the soil testing to a private lab and report
was received from it on 11.11.1986 and by that time the
stipulated period mentioned
assessing that the Appellant
has undertaken site survey, geological survey, soil testing,
inland transportation of BTG equipments in India which in fact
has not been ... respective project owner. For this intensive site survey,
geological survey and soil testing etc., is needed to be done
and these operations required presence
made technology. In other words, it requires detailed
examination right from soil testing, examining the
appropriateness of wind direction etc. which requires
cumbersome technology failure
expenditure like acquisition of land, conversion of land, appointment of architect, soil testing etc. is done and in a period of more than five years