Section 2 in The U.P. Sheera Niyantran Niyamavali, 1974 [Entire Act]

purpose of purchase of molasses or to whom molasses for captive consumption has been transferred or supplied, from the occupier of a sugar factory ... Captive Consumption" means the molasses transferred from a sugar mill to a distillery or industrial unit having the same ownership as that of the sugar
State of Uttar Pradesh - Section Cites 0 - Cited by 0

Section 10 in The U.P. Electricity Regulatory Commission (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 [Entire Act]

Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 10. Generation from Captive Power Plants. (1) A power plant shall qualify as a 'Captive Generating ... shall be the obligation of the Captive Users to ensure the captive consumption at the percentages mentioned in The Electricity Rules, 2005. In case
State of Uttar Pradesh - Section Cites 0 - Cited by 0

Section 6 in The U.P. Electricity Regulatory Commission (Promotion of Green Energy Through Renewable Purchase Obligation) Regulations, 2010 [Entire Act]

separate fund as per clause 7. (6.2) Captive User and Open Access Consumer : (6.2.1) Every captive user and open access consumer shall have to submit ... advance necessary details regarding total estimated consumption of electricity and the quantum of power proposed to be purchased from renewable energy sources for fulfilling
State of Uttar Pradesh - Section Cites 0 - Cited by 0

Section 39 in The U.P. Electricity Regulatory Commission (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 [Entire Act]

retail Tariff corresponding to the declared load by the generator. No minimum consumption guarantee or other charges shall be levied on such generators. Excess load ... energy. (i) Banking charges shall be 12.5% of the energy banked. (B) Captive Generating Plants: Captive Generating Plants shall be allowed banking subject to following
State of Uttar Pradesh - Section Cites 0 - Cited by 0

Section 28 in The U.P. Electricity Regulatory Commission (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 [Entire Act]

Section 28 in The U.P. Electricity Regulatory Commission (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 28. Duties of NCE source based Generating ... respect to generation, demand met, capacity availability, plant load factor, auxiliary consumption, specific heat rate and specific oil consumption and other information as specified under
State of Uttar Pradesh - Section Cites 0 - Cited by 0

Section 34 in The U.P. Electricity Regulatory Commission (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 [Entire Act]

Section 34 in The U.P. Electricity Regulatory Commission (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009 34. Purchase of Electricity by the Plant ... charged under appropriate category of the rate schedule of tariff. No minimum consumption guarantee or other charges shall be levied on such declared load. Excess
State of Uttar Pradesh - Section Cites 0 - Cited by 0