other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2006
175. Catch platform.
- The employer shall ensure at a construction site
Rules, 1966
11. Rules for trout fishing.
(a) Trout fishing shall be allowed in all the waters specified in Schedule II to these rules ... Schedule 111 to these rules, subject to the rules regulating fishing in these waters, but without alterations of the maximum catch of trout allowed
Section 12 in Nilgiris Fishing Rules, 1966
12. Licence fee for trout fishing.
(1) Subject to rule 20, the fee for a licence for fishing ... waters to which rule 11 applies and the number of trout which a licensee is entitled to catch shall be as specified in the table
members primarily for agricultural production, animal husbandry, pisciculture including fish catching, apiculture and sericulture and all activities incidental or ancillary thereto or for such other ... liabilities of a member as may be Specified in this Act, the rules and the bye-laws; (7) "board" means the board of directors
dynamite or other explosive substance, poison or noxious materials to catch or destroy the fish; (p) manner of sea ranching of any fish ... other matter which is to be, or may be, provided for by rules under this Act;] (3) [Every rule made or every notification issued under
Date:
Signature of Tanadar
Camp date
Appendix I Rules Relating to Elephant Catching Operations (G. O. No. 793, Revenue, dated the 10th November ... Revenue, dated the 25th July 1895.) Rules for Capturing Elephants by Pitfall System
prevent rainwater stagnation around me building. For other places catch water pit structures of size 30 centimetres diametre and 30 centimetres depth or higher depth ... necessary shall be provided wherever necessary. For existing paved storm water drains, catch water pits of 30 centimetres diametre and, 30 centimetres depth or higher
Building and other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2006
183. Erection or dismantling of steel and pre-fabricated structure ... other appropriate means suspended from lifting appliances; (iii) safety harness, life lines, catch net or catch platform; and (iv) power-operated mobile working platform
prevent rainwater stagnation around the building. For other places catch water pit structures of size 30 centimetres diameter and 30 centimetres depth or higher depth ... bottom of these drains at 10 to 15 metre intervals. These catch water pits shall be filled with appropriate filter materials as described in item
prevent rain water stagnation around the building. For other places, catch-water pit structures of size 30 centimetres diameter and 30 centimetres depth or higher ... necessary shall be provided wherever necessary. For existing paved storm water drains, catch-water pits of 30 centimetres diameter and 30 centimetres depth or higher