plants through closed pipelines to a
confined area known as "Tailing Dam" which is located near to the ore
beneficiation plant. The tailing ... dam is constructed with the mine over-
burden and soil. The tailings in the slurry form are discharged to the
tailing dam wherein the solids
Management Of Main Dam Division, ... vs Seshadev Kumbhar on 29 February, 2016
Bench: Anil R. Dave , Adarsh Kumar Goel
ITEM NO.12 COURT ... High Court Of Orissa At Cuttack)
THE MANAGEMENT OF MAIN DAM DIVISION, SAMBALPUR Petitioner(s)
VERSUS
SESHADEV KUMBHAR Respondent(s)
I.A.No.1/2016
Workmen Thr. Thein Dam Worker'S Union vs The Chief Eng.Ranjit Sagar Dam Project on 3 November, 2014
Bench: Madan B. Lokur , Adarsh ... High Court Of Punjab & Haryana At Chandigarh)
WORKMEN THR. THEIN DAM WORKER'S UNION Petitioner(s)
VERSUS
THE CHIEF ENG.RANJIT SAGAR DAM
Management Of Main Dam Division, ... vs Seshadev Kumbhar on 15 February, 2016
Bench: Anil R. Dave , Adarsh Kumar Goel
ITEM NO.23 COURT ... High Court Of Orissa At
Cuttack)
THE MANAGEMENT OF MAIN DAM DIVISION, SAMBALPUR Petitioner(s)
VERSUS
SESHADEV KUMBHAR Respondent(s)
(With appln
area served by an irrigation project such as
18
a canal, dam or a tank) and will also help in early sowing and harvesting ... Consulting Board was
constituted for advising on construction of dam, particularly, the design
and construction of Coffer dam and dewatering of foundation. Project
was found
Jaipur Gate, Shikarpura
Road, Diggi-Malpura Road, Muhana Road, Namdev Colony, Nevta Dam
and Brahmano Ki Gwar clusters and almost all were non-compliant.
CETP ... Jaipur Gate, Shikarpura
Road, Diggi-Malpura Road, Muhana Road, Namdev
Colony, Nevta dam and Brahmano Ki Gwar.
Major portion of industrial waste water from
till 1992. Later, the project was bifurcated into two components
Lakhwar Multipurpose Dam (300 MW) and Vyasi HEP (120 MW). A
1
separate Environmental Clearance ... Ullarakhand
State and being developed by UJVN Lid. The
construction of dam and underground power house for
Lakhwar Multipurpose Project (300 MW) is proposed
near
challenged the construction of the Hydro Electric Project or the dam or the EC granted by
the MOEF per se but has expressed his anxiety ... with regard to the safety and design of the dam,
its downstream effects on the ecology, the lives of the riparian tribal people residing
question involved was whether manufacturing was
involved in construction of a dam so as to avail of benefit under
section 80HH ... thing' mentioned in section 80HH could not cover dam, bridge,
building, road, canal and so on. Construction of dam was, thus,
held
question involved was whether manufacturing was
involved in construction of a dam so as to avail of benefit
under section 80HH ... thing' mentioned in section 80HH could
not cover dam, bridge, building, road, canal and so on.
Construction of dam was, thus, held