Provisional Certificate For Registration Of Clinical Establishment Provisional registration No: (Computer Generated) Date of issue: (Computer Generated) Valid up to: (Computer Generated) 1. Name ... Rules made thereunder. Designation & Signatureof the Issuing Authority (Computer Generated) Place & Date:.(Computer Generated) From-3 [See Rule 6] Application from for Permanent
received or sent in an electronic form or micro film or computer generated micro fiche; (e) "Form" means a Form appended to these rules ... Where, such notice is issued electronically, bearing a serial number generated by the computer, the signature of issuing authority shall not be required; (h) "Receipt
gross energy generated at the generator terminals of all the units of the generating station; (7) "Availability" in relation to a generating station ... that in case of a gas turbine generating station or a combined cycle generating station, the generating station shall declare the capacity for Units
dealer shall submit the duly signed and verified From A generated through the computer network from the website to the notified authority after payment ... such declaration/certificate in the system, through the computer network. (15) No registered dealer who has generated the declaration Form(s) or Certificate (s) through
maintained (in case books of accounts maintained in computer system, mention the books of accounts generated by such system)
1.8
Particulars of (operating) Bank Accounts
than a supplier generating energy for his own use or consumption, a duty (hereinafter referred to as the 'electricity duty') computed at such rate ... exemption, interest, computation and recovery of the cess payable under sub-section (1) as they apply to levy, payment, exemption, interest, computation and recovery
materials etc. and works in progress. GAS GENERATION: Ramgarh Gas : Generating Station having one unit of generating capacity 3 MW and another ... with all associated equipment namely gas turbine, steam turbine, generator transformers, heat recovery steam generators, control and instrumentation, HSD storage facilities along with
maintained (in case books of accounts maintained in computer system, mention the books of accounts generated by such system)
8.
Particulars of (operating) Bank Accounts
line load flows and other systems studies using auxiliary computer, extracting data from main computer and to have line load flow data from nearby remote ... have real time computations of third party sales/open access consumers/traders on auxiliary computes by extracting relevant data from main computer. 7. Institutional Strengthening
worked out on the basis of ex-bus energy delivered from the generating station as per following formula: (a) Variable Charge ... primary fuel required for generation of one kWh of electricity at generator terminals in kg and shall be computed on the basis of normative gross