change including an addition to the area or change in height or the removal of part of building, or any change to the structure, such ... Conversion of Building Occupied" means the change from one occupancy to other occupancy or any change in building structure or part thereof resulting
which is used as a School Bus, these structural changes should be carried out before the 1st November 2012. (6) Driver's Cabin. - In every ... which is used as a School Bus, this structural change shall be carried out before the 1st November 2012. (7) Seats. - In every School
cadre controlling Authority. (h) There will not be any change in the pay structure due to the above classification or re-organisation or re-designation
development or construction of building or structure, subdivision, layout, reconstitution or amalgamation of land or change of use of land or building without the written
Section 25 in Tamil Nadu Combined Development and Building Rules, 2019
25. Change of Owner or Developer or Professionals.
(1) If during the construction ... Registered Architect on Record (AR) or Registered Engineer on record (ER)/Registered Structural Engineer on Record (SER) or Registered Geo Technical Engineer on record
stability; (d) the addition of any building, room, out house or other structure; (e) the removal of any work or portion thereof, the removal ... support, or removal or change of any required means of eggress or rearrangement of part of the structure affecting the exit arrangements; and (f) addition
consumers. The licensee shall, besides meter rent where payable, collect charges towards changing of meters and boards, testing of meters, testing of installations, inspection charges ... Application for shifting of lines/structures/equipments under Deposit Contribution Works for LT/HT. (g) Application for change of tariff. (h) Application for replacement
Section 10 in Multi-Storeyed and Public Buildings Rules, 1973
10. Structural sufficiency. - (1) Foundations.
- (a) Every wall, column post and beam of building shall ... damage by frost or seasonal changes on soils possessing shrinking and swelling, characteristics, such as clayey soils. (c) The structural design of the foundations shall
registered developer shall appoint Registered Architect (AR), Registered Engineer (ER), Registered Structural Engineer (SER), Registered Geo Technical Engineer on record (GER), Registered Construction Engineer ... Permit or change in professionals. (3) The owner or registered developer shall not appoint the same professional as Registered Engineer or Registered Structural Engineer
processing of any goods or for extracting or for bringing about any change in any substance for the manufacture of final products; (b) pollution control ... packing or storing of goods in the course of business excluding civil structures and such goods as may be notified by the Government; (12) "casual