actual generation being less than the scheduled generation, the deviation charges for shortfall in generation shall be payable by such wind or solar generator ... actual generation being more than the scheduled generation, the Deviation Charges for excess generation shall be payable to the wind or solar generators which
shall mean the absolute value of the error in the actual generation of wind or solar generators which are regional entities with reference ... 2013-CERC, dated 28.5.2019.] . (r) ['Available Capacity (AvC)' for wind or solar generators which are regional entities is the cumulative capacity rating of the wind
generator or solar generator is done for interfacing with the next higher voltage: Provided that where there is no separate pooling station for a wind ... more than 50 MW (xiv) One member on rotation from Wind generator having pooling station capacity within state of MP more than
behalf of wind and solar generators or generators themselves, shall also provide the real time data related to power generation parameters as applicable ... commercial settlement on behalf of the generators pertaining to generation of power injected into the grid, deviations in generation or drawl by either
actual generation being lesser than the scheduled generation, the deviation charges for shortfall in generation shall be payable by such wind or solar generator which ... actual generation being more than the scheduled generation, the Deviation Charges for excess generation shall be payable to the wind or solar generators which
generating power in a given time-block; (f) 'Beneficiary' means a person procuring electricity generated from a generating station including solar/wind captive generating station ... conventional generators/renewable generators in proportion to their respective deviation. (b) SLDC shall collect deviation charge from the RE generators (Pooling station/individual generator connected
actual generation being lesser than the scheduled generation, the deviation charges for shortfall in generation shall be payable by such wind or solar generator which ... actual generation being more than the scheduled generation, the Deviation Charges for excess generation shall be payable to the wind or solar generators which
actual injection of wind or solar generators with reference to the 'Scheduled Generation' and the 'Actual Generation' as calculated using the following formula for each ... generating power in a given time-block; (f) 'Beneficiary' means a person procuring electricity generated from a generating station including solar/wind captive generating station
more than the scheduled generation, the deviation charges for shortfall or excess generation shall be payable by the wind generator or the QCA appointed ... generator shall maintain separate records and account of time-block wise schedules, actual generation and deviations for all Pooling Sub-Stations, generators, including wind
generator or QCA appointed by it. Generator(s)/QCA shall install the meter/communication/data acquisition system etc. 5.3 Wind and Solar generators and those ... case of the generators who are directly connected to the Sub-station, such generators or the QCA appointed/nominated by such generators shall communicate their