State of West Bengal - Section
Section 2012 in The West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2011
2012.
-13 UHV6 = L + 0.50 x BWUHV from year 7 onwards, i.e., from 2013-14 shall be equal to UHV6.Where,L = Declared minimum UHV of that notified grade of coal to which UHV from such indigenous source corresponds.BW = Difference between declared maximum UHV and declared minimum UHV of notified grade of coal from the same geographical area for CIL and its subsidiaries.Gcal = 109 x 1 Calorie(iv)Transportation of coal and other charges related to fuel procurement shall be as per the latest declared charges received from the tariff applicant or from the declared price list of the relevant sources providing such transportation and other auxiliary services.(v)During tariff determination, fuel mix of different type of fuel or among different quality of same type of fuel shall be considered as per mixing proportion of last one year, subject to specific deviation, if any, as proposed by the licensee or generating company with proper supporting document and also subject to prudence check.However, during FPPCA calculation, in case where applicant cannot provide actual data of different fuel, fuel mix of different type of fuel or among different quality of same type of fuel, it shall be considered as per mixing proportion of the fuel received in the year for which FPPCA is under calculation.(vi)Demurrage charge of railway rake, being commercial terms and conditions of freight, is also an indicator of efficiency of rake unloading capability of the generating stations. For existing power stations, allowance for the demurrage will gradually be reduced to a target in phased manner within a stipulated period as per regulation 2.8.6 as and when provided under. For new power stations or extension of existing power station commissioned after publication of these regulations it will be zero unless free time provided by railway is reduced by more than 20% from the existing value.(vii)At tariff determination stage, the incidental charges of fuel such as sizing charges, transportation charges to the loading point (not railway freight), underloading/overloading charges, crushing charges and other incidental charges, if any and related taxes and duties shall only be considered on the basis of actual annual average expenses against each unit of fuel for each item related to such supply from each source as will be provided in Form D (2) and Form D (3). However, for FPPCA, it shall be considered on actual basis on the quantum of fuel that has been allowed by the Commission.(viii)In case the price of coal from any indigenous captive coal mine of any licensee or generating company is determined by any statutory body or through any government order, such price will be applicable and in that case the methodology of price determination under clause (iii) will not be applicable.5.8.2- The sourcing of coal besides linkage based allocation policy of the Government of India, such as through e-auction or any other means of auction or any other mechanism from indigenous source shall be allowed by the Commission for consideration of that price for fuel cost determination purpose subject to satisfaction of any of the following conditions.(a)Coal price is less than the administered coal price of same grade available through linkage based allocated coal.(b)It can be established that procurement of such coal will be ultimately beneficial to the consumers of the State and for that purpose prior in principle clearance is obtained from the Commission.(c)In power shortage scenario procurement of coal through such mechanism does not increase the fuel cost, as approved in ARR, by more than 10% provided that allocation of coal through linkage from concerned Ministry of Government of India is not sufficient to harness the total potentiality of available generation capacity and there is sufficient evidence of power shortage which is required to be submitted while claiming such coal price.5.8.3- Any generating company or licensee can procure coal from any other source at a price within the price discovered through e-auction mechanism of Coal India Limited or its subsidiaries or any government company or government/ statutory authority on the date of procurement subject to satisfaction of any of the three conditions as specified in regulation 5.8.2 of these regulations.5.8.4- Any generating company or licensee can procure coal from any source through negotiation for firm supply from dedicated source at a price within the ceiling of the average price discovered through e-auction of Coal India Limited or any government company or government/ statutory authority in the last one year preceding to the year when agreement took place subject to satisfaction of any of the three conditions as specified in regulation 5.8.2 of these regulations.Provided that if such negotiated price exceeds the above specified ceiling then the generating company or licensee shall take prior approval of the Commission through submission of an application justifying its requirement.5.8.5- In case of sourcing coal from overseas through competitive bidding based procurement in a transparent manner, the Commission will adopt the price of such coal subject to prudence check by the Commission and subject to satisfaction of the Commission regarding ensuring of competitiveness in the bidding process and also subject to proof that there is either shortage in required quantity of coal of the desired quality in the country or such procurement will ensure ultimate lower tariff to the consumers of the State.5.8.6- In case of sourcing coal from own coal mines in overseas foreign country, the generating company or licensee shall submit all relevant information in support of the price of the coal inclusive of copies of different deals, agreement, freight, expenditure under different heads etc. On the basis of such documents and available international price on the basis of competitive bidding or available from international market mechanism, the Commission will decide the procurement price of the coal for the purpose of tariff determination under the Act.5.8.7- Notwithstanding anything to the contrary contained elsewhere in these regulations if the price of coal sourcing from foreign country is determined under any regulatory mechanism of that country, then the Commission will adopt such price as a basis for arriving at the landed cost of such coal for tariff determination.5.8.8- In case of any increase in price of fuel or railway freight or taxes/ duties / royalty/ cess on fuel at any time after issue of a tariff order for a year or due to sourcing of coal in terms of regulations 5.8.2 to 5,8.7 in larger quantity than that admitted in the tariff order or due to enhancement in power purchase cost for any justified reason whatsoever, the Commission may in order to reduce tariff rise in future due to accumulation of such entitled expenditure, allow provisionally on the basis of a Fuel Surcharge Formula termed as FPPCA in Schedule - 7A in pursuance to Section 62(4) of the Act an adhoc fuel cost or adhoc power purchase cost or adhoc variable cost as the case may be either suo-moto or on the basis of an application filed by a generating company or a licensee subject to reconciliation of such charges on receiving application for determination of FPPCA for that year. Adhoc variable cost will be applicable when there is increase in both fuel and power purchase cost for a licensee. While determining adhoc fuel cost or adhoc power purchase cost or adhoc variable cost, the fuel surcharge formula termed as FPPCA in Schedule-7A shall be used to determine the enhanced cost on account of fuel and power purchase cost. However while using such fuel surcharge formula termed as FPPCA in Schedule - 7A instead of actual expenses incurred on fuel and power purchase cost, the estimated fuel and power purchase cost for the year shall be computed on the basis of following :(a)The actual latest price of fuel or power purchase cost as far as available for the ensuing year when application for such adhoc fuel cost or adhoc power purchase cost or adhoc variable cost is being made.(b)The energy volume and mix as admitted in the ARR calculation for the concerned ensuing year in the tariff order of the first ensuing year of the concerned control period or the tariff order of that ensuing year, whichever is the latest order.(c)The normative parameters and principles and methodology of computation as considered during ARR determination of the ensuing year concerned along with consideration of Cd and A as nil value for applicability of the fuel surcharge formula termed as FPPCA in Schedule - 7A.(d)In case of non-availability of information for any ensuing year as per (b) and (c) above, for any reason whatsoever, the available information of such requirement as per any latest tariff order of the Commission on the licensees or generating company shall be used.5.8.9- From the 1st April 2011 and onwards Monthly Variable Cost Adjustment (MVCA) shall be recoverable on monthly sale by the licensee from its consumer and purchaser of electricity under the purview of the Commission through applying a Fuel Surcharge Formula for this purpose only as provided in paragraph A of Schedule - 7B in pursuance to Section 62(4) of the Act.Similarly from the 1st April 2011 and onwards Monthly Fuel Cost Adjustment (MFCA) shall be recoverable on the monthly energy sale by the generating company from the purchaser of electricity under the purview of the Commission through applying a Fuel Surcharge formula for this purpose only as provided in paragraph B of Schedule - 7B in pursuance to Section 62(4) of the Act.The licensee or generating company will apply the above Fuel Surcharge Formula of Schedule - 7B directly by them to determine the applicable MVCA or MFCA for recovery from the consumer or purchaser of electricity under the purview of the Commission through their electricity bill subject to annual reconciliation during determination of APR and/or FPPCA as per Schedule - 7A to be done by the Commission.The applicable MVCA or MFCA shall be displayed in the website of the licensee or generating company and such website shall maintain the applicable MVCA or MFCA for last 24 months at any instant of time. Whenever there will be change in MVCA or MFCA the licensee or generating company shall publish such information through two daily newspapers in the area of operation of the license or generating company. While calculating MVCA or MFCA for each month, the licensee or generating company shall prepare a complete work sheet showing the computation of applicable MVCA or MFCA along with the basis of data and supporting documents. Such work sheet shall be prepared by the licensee or generating company so that whenever called for it, it can be submitted to the Commission for verification by the Commission. However, for April '11, May '11 and June '11 such worksheets shall be submitted immediately after the MVCA and MFCA is implemented so that at the initial stage of operationalization of MVCA or MFCA proper regulatory oversight can be applied to streamline the preparation of the details of the worksheet according to which such worksheets are to be maintained in future. Moreover, the copy of monthly worksheet for MVCA and MFCA of each month shall be submitted with application of the FPPCA of that ensuing year for which FPPCA application is being submitted.5.8.10- The applicable MVCA or MFCA shall be computed on the basis of fuel and power purchase cost or fuel cost, as the case may be, of the preceding month of the month for which electricity bills are to be issued.Provided that if the tariff order of any ensuing year is issued after April of any ensuing year then till such tariff order is issued MVCA and MFCA will be computed on the basis of paragraph (d) of the note under paragraph (A) and (B) of Schedule-7B.5.8.11- In case any supplementary bill on power purchase cost or fuel cost of previous year is received such bill shall normally be considered for FPPCA of the concerned ensuing year. However if the order on FPPCA of that ensuing year is already issued by the Commission then such supplementary bill may be considered under the application of FPPCA for any future ensuing year but it shall not be provided in the MVCA or MFCA computation.5.8.12- On the basis of any application or suo-moto Commission may issue order from time to time on MVCA and MFCA for providing any clarification or removal of any difficulties or any other matter as deemed fit by the Commission and such order shall be displayed in the website of the Commission and the licensee and generating company.5.8.13- The recovery against MVCA or MFCA along with the tariff and any Adhoc Power Purchase Cost Adjustment, Adhoc Variable Cost Adjustment or Adhoc Fuel Cost Adjustment will be subject to reconciliation against Admitted Fixed Cost and Variable Cost in APR and FPPCA of the concerned year.5.8.14- Within 21 days from the date on which these regulations will come into force the generating company and distribution licensees under the purview of the Commission shall publish a notice as approved by the Commission regarding introduction of MVCA or MFCA as applicable, such notice shall be published in the website of the licensee and also in at least 4 (four) daily newspapers widely circulated in the area of operations of the applicant, at least 1 (one) each of such newspapers being in Bengali and English.| PAFM or PAFY = | 1000X āNDCi/{N x IC C (100x AUX)}% |
| i = 1 |
| PAFM or PAFY = | 1000X āNDCi/{N x IC C (100x AUX)}% |
| i = 1 |