Legal Document View

Unlock Advanced Research with PRISMAI

- Know your Kanoon - Doc Gen Hub - Counter Argument - Case Predict AI - Talk with IK Doc - ...
Upgrade to Premium
[Cites 0, Cited by 0] [Entire Act]

State of Jammu-Kashmir - Section

Section 3 in State Water Resources Regulatory Authority (Manner and Guidelines to Ensure Smooth, Uninterrupted and Leakage free Supply of Water to Farmers) Regulations, 2018

3.

The following guidelines need to be essentially followed by irrigation engineers to ensure smooth, uninterrupted, leakage free supply to farmers so that optimum yield results are achieved :-
(i)The Assistant Executive Engineer concerned should devise, for each canal, a System Operation Plan based on-
(a)The study of maps available as well as old record to devise cropping pattern to be adopted for individual canals in Kharif and Rabi seasons.
(b)Inputs from farmers.
(c)Water availability scenario based on meteorology reports.
(d)Fresh hydraulic survey and mapping.
(e)Consultation with sister departments like Agriculture, Revenue, Horticulture etc.
(ii)System Operation Plan for planning of operation methods and for running of canal system continuously for the prescribed base period shall be a pre-requisite before the start of each season.
(iii)Each System Operation Plan shall be approved by Superintending Engineer concerned.
(iv)A Water Committee for each major and medium canal should be formed/proposed by the Executive Engineer, to be approved by the Deputy Commissioner of the District concerned. In case of minor canals, Assistant Executive Engineer concerned will propose the composition of the Committee to be approved by the Additional Deputy Commissioner/Sub-Divisional Magistrate/Assistant Commissioner (Revenue) to be specifically authorized in this regard by the Deputy Commissioner concerned of the District. The Water Users Committee shall essentially have representative members from the beneficiaries and concerned Departments of the State Government. The life of such Committees will be two years. The exercise for constitution of these Committees will be conducted every two years. The concerned Superintending Engineer will kick-start the process of constitution of the Committees in consultation with the Deputy Commissioner concerned, at least three months before expiry of the term of such Committees.
(v)Water Users Committees should meet twice a year i. e. prior to Rabi and Kharif season, at least 30 days prior to the start of officially notified Rabi/Kharif season as per the Revenue Department"s relevant notification as applicable. Complete programme of running of main canals, distributaries and minors shall be settled in consultation with experts from the Agriculture Department and State Agriculture University. A representative of the Deputy Commissioner of the District concerned must be co-opted while finalizing cropping patterns and/or determining the number of waterings possible from the available water.
(vi)Till the new sarpanches are elected, Lamberdars of the villages concerned shall be ex-officio member of these Water Users Committees. Discussions with farmers shall be organized in groups or through Water Committees in presence of representatives of the concerned Agriculture, Revenue and Horticulture Departments and representatives of Rural Development Department and Command Area Development Department and State Agriculture University by the concerned Executive Engineer. The need for having contingent plans in case of shortage of water due to drought conditions is to be emphasized, wherever required. Depending upon the availability of water and local climatic conditions, well in advance of the start of each sowing season, farmers shall be apprised of maintenance of micro-network, preparing fields, adopting improved irrigation methods for water saving/ conservation.
(vii)Holding of meetings with farmers of the area and deciding the duration and quantum of water supply is one of the important steps for preparing a System Operation Plan. The beneficiaries should know the cropping practices comprehensively. Their active involvement in the preparation of the Plan is, therefore, essential.
(viii)30 days before the start of each season (Rabi/Kharif), the canal system should be inspected by the Assistant Executive Engineer by a Reconnaissance survey and maintenance needs for each structure (such as intakes, siphons, aqueducts, mogas and canal crossing etc.) should be listed, well documented and properly maintained in a register, which will be open to inspection by the concerned Chief Engineer, Superintending Engineer and Executive Engineer. This Reconnaissance survey requires walking by field functionaries such as Assistant Executive Engineer and below along each irrigation channel and taking note of each and every Operation and Maintenance need, as driving through may depict or capture only the major problems.
(ix)Reconnaissance on foot would render it possible to minutely observe all maintenance and operation problems which can be readily corrected at lower costs before they become expensive major problems and may also then take more time for rectification.
(x)In order to minimize the canal closure period, the tendering process for desilting/operation and maintenance may be considered to be done as per the previous year"s experience. This exercise should be done in consultation with the Deputy Commissioner concerned.
(xi)Running the main canal and the system continuously for the prescribed base period of the crop is preferred. Closing the entire system for 7 to 14 days and again running it till the supply in the canal lasts or crop matures ; whichever is earlier, may be necessary for yearly maintenance.
(xii)Commencement and closing dates of Rotational Program of canal system for different crops shall be in accordance with the crop calendars based on climatic conditions of individual Irrigation System and decided in consultation with Water Users Committees as well as concerned Departments with the knowledge of the territorial Tehsildar(s) concerned.
(xiii)Adequate and timely maintenance of an irrigation system is vital for proper irrigation water management. This management can be effectively possible only when the infrastructure for water conveyance exists in a fairly good condition. For increasing productivity, evaluation of maintenance deficiencies and their timely rectification coupled with improved operational practices providing more reliable and predictable water deliveries are most essential. There is a need to conduct engineering survey of the system for determining the maintenance needs conducive to implementation of the principal of "tail to head" irrigation.
(xiv)Each crop has its own sowing and harvesting calendar and it is important to have a knowledge of this which may help to decide the total water demand in a field having mixed crops. Generally, in Jammu and Kashmir State we have two main cropping seasons viz. Kharif and Rabi.
(xv)As there is limited time left for maintenance or desilting of the main canals network, the closing of canals which is generally between January and April, every year. It obviously affects the production during the Rabi season, and therefore should be restricted to a maximum of 3 (three) weeks.
(xvi)In case of major/medium canals, the closure of canals and reopening thereof after maintenance should be known to the beneficiaries sufficiently in advance through Water Users Committees, print, electronic and social media, as well as through traditional methods like beating of drums and pasting of informative handbills in local language at important locations such as Panchayat Ghars, State Government offices, etc.
Chapter-IV Offences and Penalties