I
FORM 'A'Form of application under sub-section (1) of Section 7 of the U.P.(Regulation of Building Operations) Act, 1958[See Chapter II, Regulation 4(1)]To,The Prescribed Authority,Regulated area.......Dated........20.....Sir,I/We beg to apply for permission (a) to undertake or carry out the development of the site described below, (b) to erect building/buildings on the site described below, (c) to make or extend any excavation on the site described below, (d) to layout any means of access to the road described below.I/We attach a site-plan in triplicate (blue prints or regular plans on oil cloth) showing the position of the site proposed to be developed or excavated or the plot proposed to be built upon in relation to its surroundings and the sanctioned layout, if any.I/We submit a site-plan in triplicate or regular plans (on oil cloth), showing elevations and specifications of the proposed building as required by the Municipal bye-laws applicable to my/our area.I am/We are the owner/owners, lessees, of the land, for which 1 am/We are applying.1. Description of the land:
(1)Area of the plot in square yards.(2)Its Municipal number or details and description. If rural area, the Khasra number, etc.(3)Purpose for which the building would be used, e.g., the uses of the land.(4)If plans sanctioned by the local body (Give true copy of sanction order with a copy of the sanctioned plan).2. Description of road.
Yours faithfully.Signature.FORM 'B'Show Cause NoticePrescribed Authority,Regulated Area.........No...........the...........20...........To,.........................................................Notice under proviso to Section 10 of the Uttar Pradesh (Regulation of Building Operations) Act, 1958Whereas you have commenced/are carrying on/have completed the erection of a building consisting of............and situate at without permission of the Controlling Authority/ Prescribed Authority as required under Section 6 of the U.P. (Regulation of Building Operations) Act, 1958.You are hereby required to show cause on........at........in the office of the Prescribed Authority as to why an order for demolition of the aforesaid construction be not made. You may appear personally or through your duly authorised agent.Notes. - Your attention is also drawn to Section 9(1) of the said Act under which you are liable to punishment (for construction without permission of the Authority as required under Section 6 of the said Act) with fine which may extend to Rs. 10,000 (ten thousand rupees) and in the case of a continuing offence, with a further fine which may extend to Rs. 500 (Five hundred rupees) for every day during which such offence continues after conviction for the first commission of the offence.Prescribed AuthorityRegulated Area.............FORM 'C'Demolition NoticePrescribed Authority,Regulated Area........No.........the..........20..........To,.........................................................Order of demolition of building under Section 10 of the U.P.(Regulation of Building Operations) Act, 1958Whereas you have commenced/are carrying on/have completed the erection of building consisting of...............and situate at.........;And whereas you were given an opportunity to be heard and show cause on........as to why an order for demolition of the aforesaid erection be not made;And whereas you failed to show cause/or have shown no sufficient cause against the issue of such order;You are hereby required to demolish the aforesaid erection within a period of seven days from the date of receipt of this order, failing which this Authority may itself cause the erection to be demolished and the expenses of such demolition shall be recoverable from you as arrears of land revenue.Prescribed AuthorityRegulated Area............FORM 'D'Prescribed Authority,Regulated Area.............Report regarding unauthorised construction1. Probable date of commencement of work.
4. Description of construction taken in hand.
5. Name and address of the lessee or builder.
7. Recommendation with designation of the reporting agency.
When notice under Section 10 of the U.P. (Regulation of Building Operation) Act, 1958, is to issue the notice should be attached for signature and orders solicited for pasting the notice at site if notice is evaded.Signature of the Reporting AgencyPrescribed AuthorityOrders of Prescribed Authority.
II
Proforma Of Plans Register
| Serial No |
File No. |
Name of the applicant |
Site particulars |
Date of receipt of building application |
Gist of final order |
Date of return of plan with order to applicant |
Fees, if any paid with number and date of deposit |
Remarks |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
| |
|
|
|
|
|
|
|
|
Proforma Of Notice Register
| Serial No. |
File No. |
Name of unauthorised Builder |
Site particulars |
Description of unauthorised construction |
Date of issue of show cause |
Date of service of notice |
Date fixed for hearing |
Date of issue of demolition notice |
Date of service of demolition notice |
Date of demolition departmentally |
Labour charges realized with number and date ofreceipt
|
Reference to item and page of D/C register ifdemolition charges not realized
|
Reference to item and page of prosecutionregister if prosecution made
|
Remarks |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
III
(See Chapter V)Fees of plans :-(i)For ordinary copy of a plan for which a tracing has to be prepared -On Ferro paper - At a rate of Rs. 5 per square foot of ferro paper or part thereof for the first copy of Re. 0.75 per square foot or part thereof for every subsequent copy.On Ozalid paper - At a rate of Rs. 5 per square foot of ozalid paper or part thereof for the first copy and Re. 1 per square foot or part thereof for every subsequent copy.(ii)for a copy of a plan for which a tracing exists in the Authorities office -On Ferro paper - Re. 0.70 per square foot of ferro paper or part thereof.On Ozalid paper - Re. 1 per square foot of ozalid paper or part thereof.(iii)Where a person presents an exact copy of a plan on the record of the Authority and desires it to be attested as a true copy of the plan - Rs. 5 per plan.In case an applicant wants the copies of the plans urgently in addition to the copying and other charge listed above, an additional fee of Rs. 5 per plan in case of (i) above and Re. 1 per plan in case of (ii) and (iii) above would be leviable.Fees for copying of English, Hindi or Urdu records-(i)For every 200 words or under - Re. 0.75.(ii)For every additional 100 words or fraction thereof - Re. 0.37.In case an applicant desires a copy of the above documents urgently, he shall be charged twice the normal rates :-(a)Preparation of copies of documents shall not be undertaken unless the prescribed fee has been deposited by the applicant in the office of the Prescribed Authority.(b)Copying fee once paid shall not be refunded unless an application for refund is made before arrangements to make the copy of the document have been made.(c)An urgent copy should ordinarily be made available within two days of the receipt of the application and deposit of prescribed fees.