State of Uttar Pradesh - Act
Lucknow Industrial Development Areas (Composition of Offences) Regulation, 2017
UTTAR PRADESH
India
India
Lucknow Industrial Development Areas (Composition of Offences) Regulation, 2017
Rule LUCKNOW-INDUSTRIAL-DEVELOPMENT-AREAS-COMPOSITION-OF-OFFENCES-REGULATION-2017 of 2017
- Published on 4 January 2018
- Commenced on 4 January 2018
- [This is the version of this document from 4 January 2018.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short title and commencement.
2. Definition.
- In these regulations unless the context otherwise requires,-3. Composition of offences.
4. To give permission or reject to give permission.
5.
Valid provided that construction and invalid construction will be outlined separately in the map in accordance with the Lucknow Industrial Development Area Building Regulations, 2009 un-authorised construction on the front-side an in the set back of back side may be considered for composition only in the contiguity of the main building and additional construction to the land coverage area and basement area will be composable to the extent given as under-6. Schedule of Composition Fee.
- Composition fee for the different types of illegal construction and development works shall be decided in accordance with the rates given in the schedule.7. Computation of Composition Fee.
8.
Building or any part thereof, which comes under composition limit marked in the map submitted for the composition, will not be demolished but there will be no restriction on the demolition of the non composable part of the building according to the by laws of the development authority.9.
The proceedings will be concluded regarding the part of the building having composed after the sanction of map. If the order has been passed regarding the demolition of the composed part of the building then it will be deemed to be expired. The rest part will be removed by the constructor himself otherwise it shall be demolished by the Development Authority and the expenses incurred on such demolition will be recovered by constructor in accordance with the byelaws.10. Recovery of Composition Fee.
- The amount of composition fee charged under sub-regulation (2) of Regulation 6 will be deposited by the constructor in a lump sum or in instalments including interest thereon as may be determind by the Authority and proceeding of the composition will be completed only after payment of the entire amount of composition fee including interest. Separate rules may be framed by the authority for the purpose of fixation and payment of the instalments together with interest thereon.11. Composite details of the construction work composed for.
- The details of the illegal construction composed for will be enlisted in the form prescribed by the authorised officer for the purpose of composition and its composite details will be put up for information in the meeting of the Board.12.
Application under consideration for composition will be disposed of under the provisions of these regulations.13.
The composition fee charged under sub-regulation (2) of Regulation 6 and the expenses incurred on the action for demolition taken by the Authority under Regulation 9 will be recovered according to adopted Section 40 of the Uttar Pradesh Urban Planning and Development Act, 1973 in the Act.Note. - (1) If the applicant does not apply properly to get the facility of composition, the Authority will take proper action for the demolition of illegal construction.| Sl. No. | Nature of Construction | Schedule of composition fee (Rule V-4) | |||||
| Rate of Compounding fee for different landuses | |||||||
| Residential | Commercial | Offices | Industrial | Facilities/others | |||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| 1 | Construction without permission underpermissible Ground Coverage and Floor Area Ratio | 1.1 | Rs 18 for all type of construction up to plotarea 100 sqm | Two times of Residential | 1.5 times of Residential | 0.40 times of Residential | 0.50 times of Residential |
| 1.2 | Rs 28 per sq.mtr. for all type of constructionup to plot area 101-300 sq.mtr | As above | As above | As above | As above | ||
| 1.3 | Rs 37 per sq.mtr. for all type ot constructionup to plot area 301-500 sq.mtr | As above | As above | As above | As above | ||
| 1.4 | Rs 46 per sq.mtr. for all type °fconstruction up to plot area 500-2000 sq.mtr | As above | As above | As above | As above | ||
| 1.5 | Rs 46 per sq.mtr. Area more than 2000 sq./mtr/onthe plot of Group Housing for all type of construction | As above | As above | As above | As above | ||
| 1.6 | Rs 92000 per Unit for compoundable Units morethan permissible Units. | - | - | - | - | ||
| 2. | Additional Floor Area Ratio within permissibleGround Converges | Rs 368 per sq.mtr for both type ofconstructions, plotted development and Group housing and 50 percent of required land Value for additional Floor Area Ratio | Rs 368 per sq.mtr and 100 per cent of requiredland Value for additional Floor Area Ration. | Rs 552 per sq.mtr and 75 per cent of requiredland Value for additional Floor Area Ratio | Rs 276 per sq.mtr and 40 per cent of requiredland Value for additional Floor Area Ratio | Rs 276 per sq.mtr and 50 per cent of requiredland Value for additional Floor Area Ratio | |
| 3 | On the additional Ground Converges more thanpermissible Ground Converges | ||||||
| A-In the Group housing and Multistoried buildingin each direction | 100 per cent of land Value | 200 per cent of land Value | 150 per cent of land Value | 40 per cent of land Value | 50 per cent of land Value | ||
| B-plotted Development | |||||||
| 1-Front set back | 100 per cent of land Value | 200 per cent of land Value | 150 per cent of land Value | 40 per cent of land Value | 50 per cent of land Value | ||
| 2-Side set back | 75 per cent of land Value | 150 per cent of land Value | 100 per cent of land Value | 40 per cent of land Value | 50 per cent of land Value | ||
| 3-Rear set back | 50 per cent of land Value | 100 per cent of land Value | 75 per cent of land Value | 20 per cent of land Value | 25 per cent of land Value | ||
| 4 | Construction of basement more than permissiblelimit | 50 per cent of land Value | 100 per cent of land Value | 75 per cent of land Value | 20 per cent of land Value | 25 per cent of land Value | |
| 5 | The Height of Room is lower than permissibleheight | Rs 184 per sq.mtr on the area of room | Rs 368 per sq.mtr on the area of room | Rs 276 per sq.mtr on the area of room | Rs 92 per sq.mtr on the area of room | Rs 138 per sq.mtr on the area of room | |
| 6 | The width of room is lower than permissiblewidth | Rs 92 per sq.mtr on the area of room | Rs 184 per sq.mtr on the area of room | Rs 138 per sq.mtr on the area of room | Rs 37 per sq.mtr on the area of room | Rs 46 per sq.mtr on the area of room | |
| 7 | The area of room is less than approved area | Rs 92 per sq.mtr on the area of room | Rs 184 per sq.mtr on the area of room | Rs 138 per sq.mtr on the area of room | Rs 37 per sq.mtr on the area of room | Rs 46 per sq.mtr on the area of room | |
| 8 | The area of lighting and ventilation is less than approvedarea for room | Rs 92 per sq.mtr on the area of room | Rs 184 per sq.mtr on the area of room | Rs 138 per sq.mtr on the area of room | Rs 37 per sq.mtr on the area of room | Rs 46 per sq.mtr on the area of room | |
| 9 | More Height of compound wall instead of approvedheight | Rs 92 per running meter, minimum Rs 92000 | Rs 184 per running meter, minimum Rs 18400 | Rs 276 per running meter, minimum Rs 13800 | Rs 37 per running meter, minimum Rs 1840 | Rs 46 per running meter, minimum Rs 4600 | |
| 10 | Without permission Layout/ Development workwhich is according to bylaws | 1 per cent of land value on saleable area | 2 per cent of land value on saleable area | 1.5 per cent of land value on saleable area | 0.40 per cent of land value on saleable area | 0.50 per cent of land value on saleable area | |
| 11. | Layout up to one acre which cannot be approvedas per rule | Two time of land value on the area which is lessthan as per norm, area of road, park, open land and communityfacility. | |||||
| 12. | Area of Layout more than one acre which cannotbe approved as per rule | In such matters action will be taken accordingto the guidelines issued by the Government regarding theregularisation of the unauthorised colonies. |