1.
A. General Conditions :1. Revised Schedules and General Conditions of tariff have been enforced as amended upto-date.
2. The tariffs are subject to revision and/or levy of fuel surcharge as may be decided by the Board from time to time.
3. The tarrifs are exclusive of electricity duty, taxes and other charges levied by the Government or other competent authorities from time to time which are payable by the consumers in addition to the charges levied as per the tarrif.
4. Single Point Delivery :-
Unless otherwise agreed to or specified, the tariffs are applicable to only one point of supply and at a single voltage. Supply at other points or at other voltages shall be separately billed.5. The tarrifs are subject to the provisions of the General conditions of Supply and Schedule of General and Service charges relating to the supply of Electricity or any amendment/modifications thereof as are enforced from time to time.
6. The monthly minimum charges specified in various schedules exclude meter rent, electricity duty, taxes and other charges/rebates and surcharges which shall be charged separately depending upon the character of service, tariff and other clauses of the various Schedules as applicable.
7. (a) Contract demand shall mean the maximum demand in KVA sanctioned to the consumer and the same shall be between 40% (minimum) and 100% (maximum) of sanctioned load. The KVA demand shall be worked out from sanctioned load in KWs by using power factor 0.88. The consumer demanding contract demand higher than 60% of the connected load, shall be charged 'one time contract demand charges' as under :-
| (i) | For Contract Demands above 60% & upto 80% of connectedload. | = Rs. 200/KVA |
| (ii) | For Contract Demands above 80% & upto 100% of connectedload. | = Rs. 300/KVA |
8. Deleted.
9. The applicability of category of tariff under Schedule L.S. or M.S. or S.P. will be based on the total industrial and general load (i.e. bona fide factory lighting & Colony lighting). However, in case of Large Supply connections where separate 11 KV connection has been released for Colony load the total load shall be sum of Industrial load & bona fide factory lighting load only. Also for determining total load, fraction of half and above of a KW should be taken as 1 KW and fraction below half should not be accounted for.
10. Factory Lighting & Colony Supply :
Industrial Power Supply (L.S., M.S. & S.P.)11. L.T. Surcharge/H.T./EHT rebate on L.S. & M.S. Consumers vis-a-vis General consumption :
12. Monthly Minimum Charges vis-a-vis General Consumption :-
Energy charges for bona fide factory lighting and residential quarters/Colony lighting etc. as billed under Clause-6 of Schedule L.S., under Clause-6 of Schedule M.S. & under Clause-4 of Schedule S.P. are adjustable against the monthly minimum charges payment as the monthly minimum charges are based on sum total of industrial and general load.13. Seasonal Industries :-
14. Connected load :-
The connected load means the sum of the rated capacities of all the energy consuming apparatus in the consumer's installation. This shall not include the stand by or spare energy consuming apparatus installed through the change-over switch provided the stipulations made in note (iii) below are fulfilled :-Note. - (i) The connected load of Arc furnace/Induction furnace shall be the KVA/KW rating of the furnace transformers feeding the furnace exclusively.However :-| (a) | Domestic Supply: | |
| Power Socket Load 1 KW | 1/3rd of the number of sockets be taken into account for thepurpose of determining the connected load. | |
| (b) | Non-residential/Industrial Supply, | |
| Power Socket load 2 KW | 50% of the Power Sockets shall be reckoned for computing theconnected load. | |
| (c) | Bulk supply | |
| (x) For Domestic Purposes | ||
| Power Socket Load 1KW | 1/3rd of the number of power sockets be taken into account. | |
| (y) For Non-residential Purposes. | ||
| Power socket load 2 KW | 50% of the number of power sockets be taken into account. |
| (i) | upto 1000 KW | Concerned Xen/Op. & Xen/Enforcement. |
| (ii) | above 1000 KW | Concerned SE/Op. & Director Enforcement. |
15. Steel Rolling Mill Surcharge :
In case supply to steel Rolling Mills is given at 4000 Volts instead of 11000 Volts under Schedule L.S., then additional surcharge of 15% is leviable on the charge worked out as per tariff after levying surcharge of 20%.[Agricultural Pumping Supply :Chaff Cutters, Threshers and Cane Crushers for self use are allowed to be operated on tubewell pumping set connections.No electricity duty shall be charged from A.P. consumers who use chaff cutter, thresher, cane crusher subject to the following :-18. Bi-monthly Billing :
Billing of Domestic Supply and Non-residential Supply Consumers shall be done on bi-monthly basis. Consumption blocks/slabs are, therefore, required to be doubled while applying relevant tariff. All other consumers are to be billed on monthly basis in which case no compounding of slabs is required.19. In case any question arises as to the applicability of any tariff to any particular class of service or as to the interpretation of various clauses of the tariff or to the method of billing, decision of Chief Engineer Incharge Commercial Directorate or Director/Tariff shall be final and binding.
20. Defective KVAH meters :
In case KVAH meter is defective/removed for repairs, the average of monthly average power factor of the consumer's installation recorded during the last three correct working months preceding the period of overhauling before KVAH meter is found defective or as removed, shall be taken as the monthly average power factor for levy of power factor surcharge till such time KVAH meter is repaired and installed.21. Tariff for poultry Farms/News Papers printing presses.
The poultry farms and Accredited Newspapers shall be termed as industrial premises and therefore, the entire supply to poultry farms including lighting in the run and accredited Newspaper printing press shall be classified as industrial supply and shall be charged under relevant industrial tariff. However, the lighting load in the premises of accredited Newspapers shall be metered separately and charged as per rates under Schedule Non-residential supply.22. Rounding of Energy Bill (Net/gross) :
Energy charges (S.O.P.) Octroi (if applicable), meter rentals, Service Charges, Electricity Duty as well as total energy bill (Net as well as gross) shall be rounded off individually to the nearest rupee by ignoring 1 to 49 paise and taking 50 to 99 paise as one rupee. Thus the amount mentioned in the bill shall be in whole rupee and not in rupees and paise.23. Fuel Cost Adjustment Clause :
In order to neutralise the additional expenditure incurred on cost of Fuel required for generation of Elecy., energy bills of the various categories of consumers, prepared on the basis of the relevant schedule of tariff shall be increased at the rates notified by the Punjab State Elecy. Board from time to time.Electricity bills relating to energy charges in case of Schedule D.S. - Domestic Supply, N.R.S.- Non-residential Supply, B.S. - Bulk Supply, S.L. - Street Lighting Supply, S.P. - Small Industrial Power Supply, M.S. - Medium Industrial Power Supply, L.S. - Large Industrial Power Supply, R.T. - Rly. Traction Power Supply, A.P. - Agricultural Pumping supply shall be increased by the Fuel Surcharge. Fuel Surcharge shall also be leviable to Govt. tubewells covered under T.C.A. (Technical Co-operative Assistance) Scheme, P.S.T.C. and I.B. tubewells and Schedule T.M. - Temporary Metered supply.Where ever bill is prepared on Monthly Minimum Charges, Fuel Surcharge shall be leviable over & above the monthly minimum charges.24. Payment :
The rates given in various Schedules are net. In the event of the monthly bill or other charges relating to electricity not being paid in full within the time specified in the bill, the surcharge shall be leviable as under :-I. For all categories of consumers having load 100 KW and above, surcharge on late payment of electricity bills will be 5% upto 7 days after the due date and after 7 days, it will be 10% P.A. or part thereof (period to be reckoned from the due date) on total amount of the bill. For consumers having connected load less than 100 KW, Surcharge shall be leviable @ 10% on total amount of the bill on the 1st instance upto one year, in case electricity bills are not paid within the due date.II. Interest @ 18% per Annum shall be charged after expiry of one year from the due date of the bill, on gross unpaid amount including surcharge. Part of the month shall be treated as full month for this purpose and interest will be payable on monthly basis for the period of continued default i.e. at 1½% per month.1. Availability
2. Character of Service :
A.C. 50 Cycles, 3 Phase 11 KV Supply for loads above 100KW, supply can be given at 33/66/132/220 KV depending on quantum/type of load and contract demand and availability of bus voltage and transformer winding capacity at the feeding Sub-Station wherever possible at the discretion of the supplier. For Arc. Furnace loads and other loads of equally violent fluctuating nature, the voltage of supply will be 33 KV and above depending upon availability of bus voltage and transformer winding capacity at the feeding Sub-Station wherever possible, at the discretion of the supplier.3. Tariff :
| (a) | General Category | = 214 paise/unit. |
| (b) | Power Intensive Units, Arc Furnace, Induction Furnace &Choloro- Alkaline units. | = 229 paise/unit. |
| (c) | Off Seasonal consumption rate for Cotton Ginning, Pressing,Bailing Plants, Rice Shellers, Huller Mills, Rice BranStablisation Units (Without T.G. Sets). | = 264 Paise/Unit. |
4. Demand Assessment and Power Factor :-
The maximum demand for any month shall be defined as the highest average load measured in kilovolt Amperes during 30 or 15 consecutive minutes period of the month.Power Factor :-The monthly average power factor of the plant and apparatus owned by the consumer shall not be less than 0.88. The monthly average power factor shall means the ratio expressed as percentage of total Kwh to total KVAH supplied during the month. The ratio shall be rounded upto two figures.If the monthly power factor falls below 88%, the consumer shall pay on the bill amount a surcharge of 1% for each 1% by which the monthly average power factor falls below 88% to 80%, the surcharge shall be 2% for each 1% by which monthly average power factor falls bllow 80%. For the purpose of power factor surcharge the bill amount will mean the energy charges on the consumption in a month, but not for low power factor surcharge shall also include the surcharge or rebate as applicable under item-3 Note (i) & (ii) of Schedule L.S. Large Industrial Power Supply as the case may be.Should the monthly average power factor fall below 80%, it must be brought upto minimum of 88% by the consumer by methods approved by the Board within a period of 6 months, failing which without prejudice to right to collect surcharge, the connection shall be disconnected and will not be reconnected unless monthly average power factor is improved to 88% by the consumer to the satisfaction of the Board.5. Seasonal Industries :-
6. Factory Lighting & colony supply :-
All consumption for bona fide factory lighting shall be included for charges under the above tariff. The consumption for residential and resale purposes for the factory's staff quarters, Street Lighting etc. shall also be charged under this tariff. However, consumer can opt for separate single point connection for Colony loads (above 100 KW) which shall be charged as per Indl. category. The Elecy. duty shall be charged as applicable to Domestic Supply category being residential load.7. Monthly Minimum Charges :-
The monthly Minimum Charges shall be leviable as under :-| (i) | Arc Furnaces | Rs. 250/KW or part thereof of sanctioned load. | |
| (ii) | Induction Furnaces | Rs. 300/KW or part thereof of sanctioned load. | |
| (iii) | Cotton Ginning | Pressing &Bailing Plants | Rice Shellers |
| (iv) | Ice Factories & Cold Storages. | (i) | Rs. 200/KW or part thereof for the months from April to July. |
| (ii) | As per rate applicable to general industry for remaining 8months of the year. | ||
| (v) | Others (General category) | Rs. 100/KW of sanctioned load. |
1. For Arc/Induction furnace, where the load is of mixed nature i.e. in addition to Arc/Induction furnace loads, general industrial loads are also running, monthly minimum charges on pro-rata basis in proportion to such loads shall be levied. The Power Intensive loads shall comprise load of Arc/Induction furnace, Auxiliary loads, loads of Pollution Control machinery, Gas Plants and corresponding lighting loads and general industrial loads shall comprise loads of rolling mill and its allied loads, related workshop, General Engineering Industry & corresponding lighting load for the purpose of levy of monthly minimum charges (all above mentioned loads fed from the same connection).
2. For industrial units having co-generation facility, MMC shall be levied on the total connected load minus TG set capacity in KW or MMC on sanctioned load to be exclusively fed from the PSEB system or the actual demand in KW (KVA x p.f.) recorded during the month, whichever is highest. For wlring out the capacity of T.G. set, the KVA rating shall be multiplied by Power Factor of the T.G. set. In case power factor is not mentioned in the T.G. set, the same shall be taken as 0.88.
8. (a) Demand Surcharge for exceeding the contract demand :-
If the consumer in a month exceeds the contract demand, such excess shall be charged at an additional rate of Rs. 250/- per KVA irrespective of number of defaults. This additional demand surcharged shall be without prejudice to the Board's right to take such other appropriate action as may be deemed necessary, to restrain the consumer from exceeding his contract demand.In the event of MDI being defective and computed maximum demand more than the contracted demand, no surcharge for increased demand so computed, for the previous period shall be levied provided the consumer's connected load would be verified immediately and found within sanctioned load.9. Force Majeure Clause Applicable for Arc/Induction Furnaces :-
In the vent of lockouts due to labour problems, failure/damage of EHV power transport (33 KV and above), failure on the part of PSEB to supply power, fires, earth-quakes, floods, tempests & lightening directly resulting into closure of industry or normal supply hours reduced through specific orders of the Board for power regulation purposes thereby effecting the normal working of the industry, the consumers shall be entitled to proportionate reduction in monthly minimum charges provided that such closure or reduced working hours continue for at least seven days consecutively in a billing cycle month directly as a consequence of any of the above conditions. In the event of relief being allowed in monthly minimum charges under above conditions, the consumer shall, however, be required to pay monthly, minimum charges as applicable to general industrial Large Supply consumers.II. Schedule M.S. - Medium Industrial Power Supply :-1. Availability :-
This tariff shall apply to all industrial power supply consumers having a connected load ranging from 21 KW to 100 KW.2. Character of Service :-
A.C. 50 Cycles, 3 phase, 400 Volts or at 11 KV at supplier's option.3. Tariff :-
| (A) | Energy charges for industrial and factory lighting use,without prejudice to Monthly Minimum Charges | under Clause 7 below |
| (B) | Off Seasonal consumption rate for Cotton Gunning, Pressing,Bailing Plants, Rice Shellers, Huller Mills, Rice BranStablisation Units (without T.G. Sets) | = 241 paise/unit |
4. Capacitor Surcharge :-
All consumers are required to instal Shunt Capacitors having suitable KVAR capacity prescribed in Clause-9 of Conditions of Supply. No connection shall be released without installation of Shunt Capacitors.In case Shunt capacitor(s) is/are found to be missing or inoperative or damaged, 15 days notice shall be issued to the consumer for rectification of the defect and setting right the same. In case the defective capacitor(s) is/are not replaced/rectified within 15 days of the issue of notice, a surcharge @ 20% on bill amount shall be levied for the preceding two months and it will continue to be levied till the defective capacitor(s) is/are replaced/rectified to the satisfaction of the Board. In case the capacitor(s) is/are found to be of inadequate rating, then the capacitor surcharge shall be levied on pro-rata basis.5. Seasonal Industries :-
6. Factory Lighting :-
7. Monthly Minimum Charges :- The monthly minimum charges shall be leviable as under :-
| (i) | For Cotton Ginning, Pressing & Bailing plants, RiceShellers, Huller Mills and Rice Bran Stablisation Units (withoutT.G. Sets). | Rs. 240/KW or part thereof. | |
| (ii) | For Ice Factories & Cold Storages. | (i) | Rs. 200/KW or part thereof for the months of April to July. |
| (ii) | As per rates applicable to general industry for remaining 8months of the year. | ||
| (ii) | For other Industries | ||
| (a) For loads upto 60 KW. | Rs. 80/- per KW or part thereof., | ||
| (b) For loads above 60 KW. | Rs. 100/- per KW or part thereof., |
8. Load surcharge for exceeding the connected load :
If the connected load of a consumer exceeds the sanctioned load, the excess load shall be unauthorised load. Such excess of the connected load shall be charged load surcharge at an additional rate of Rs. 750/- per KW for each default. This load surcharge shall be without prejudice to Board's right to take such other appropriate action as may be deemed necessary to restrain the consumer from exceeding his connected load.1. Availability : Available to small power industries including pumps and Tokas with connected load not exceeding 20 KW (26 BHP) in Urban and Rural Areas.
2. Character of Service :
A.C. 50 Cycles 3 phase, 400 Volts or Single Phase 230 Volts as per option of the supplier.3. Tariff :
| (a) | Energy charges for Industrial & Factory lighting loadwithout prejudice to Monthly Minimum Charges under Clause-6 below | = 176 Paise/Unit |
| (b) | Off seasonal consumption rate for Cotton Gunning, Pressing,Bailing Plants, Rice Shellers, Huller Mills, Rice BranStablisation Units (without T.G. Sets) | = 226 Paise/Unit |
4. Factory Lighting :
The consumption for bona fide factory lighting shall be separately metered and charged at the rate for industrial consumption.5. Seasonal Industry :
6. Monthly Minimum Charges :
The monthly minimum charges shall be leviable as under :-| (i) | For cotton Ginning, pressing, and bailing plants, RiceShellers/Huller Mills and Rice Bran Stablisation Units (withoutT.G. Sets). | = | (i) | Rs. 200/KW or part thereof for the months of April to July. |
| (ii) | As per rate applicable to general indy. for remaining 8 monthsof the year. | |||
| (iii) | For other Industries :, | Rs. 55/- per KW or part thereof, | ||
| (a) Rural Areas | = | |||
| (b) Urban Areas | = | Rs. 60/- per KW or part thereof, | ||
| (iv) | For Agricultural Tubewells released under industrial category. | = | Rs. 100/KW or part thereof. |
7. Load surcharge for exceedies the connection load :
If the connected load of a consumer exceeds the sanctioned load, the excess in connected load shall be unauthorised load. Such excess of the connected load shall be charged load surcharge at an additional rate of Rs. 750/- per KW for each default. This load surcharge shall be without prejudice to Board's right to take such other appropriate action as may be deemed necessary to restrain the consumer from exceeding his connected load.Any consumer who exceeds his connected load will be liable to compensate the Board for all damages occasioned to its equipment or machinery by reasons of this default. Without prejudice to this right, the Board may also cause the service of the consumer to be disconnected without any notice. However, if the unauthorised extension is upto 10% of the sanctioned load (for connections with sanctioned load upto 18 KW), the consumer shall not required to pay load surcharge and his connection shall not be disconnected. Again the unauthorised load so detected (i.e. within the said limit) is also not required to be removed/got regularised by the consumer. For consumers having sanctioned load above 18 KW, the extra load permissible shall be to the extent that total load does not exceed 20 KW.8. Capacitor Surcharge :
All consumers are required to instal Shunt capacitors having suitable KVAR capacity prescribed in Clause 9 of conditions of supply. No connection shall be released without installation of shunt capacitors.In case Shunt capacitor(s) is/are found to be missing or inoperative or damaged, a 15 days notice shall be issued to the consumer for rectification of the defect and setting right the same. In case the defective capacitor(s) is/are not replaced/rectified within 15 days of the issue of notice, a surcharge @ 20% on bill amount shall be levied for the preceding two months and it will continue to be levied till the defective capacitor(s) is/are replaced/rectified to the satisfaction of the Board. In case the capacitor(s) is/are found to be of inadequate rating, then the capacitor surcharge shall be levied on prorata basis.IV. Schedule A.P. - Agricultural Pumping Supply1. Availability :
Available for irrigation pumping loads upto 20 KW (26 BHP). For loads above 20 BHP, only metered supply shall be given. Consumers getting supply from Urban/City Feeders shall get metered supply. Supply for loads above 26 BHP/20 KW shall be covered under relevant industrial category. PSTC and I.B. Tubewells and Tubewells under T.C.A. (Technical Co-operative Assistance) Scheme are covered under relevant industrial category. Tubewell connections released to Co-operative Societies formed by marginal farmers for installing deep bore tubewells under Central Assistance Scheme shall be covered under metered supply A.P. Tariff for rural feeders.2. Character of Service
A.C. 50 Cycles, 3 phase 400 Volts, Single Phase 230 Vols.3. Tariff
Free Supply. However, for accounting purpose the tariff rates applicable to various categories are as under :-| (i) | From Rural Feeders | ||
| (a) Metered Supply | : | 56.5 paise/unit Plus | |
| Rs. 3/BHP/Month as demand charges in lieu of service rentals.(Rebate 6.5 paise/unit). | |||
| Net Rate Payable | : | 50 paise/unit Plus | |
| Rs. 3/BHP/Month as demand charges in lieu of service rentals. | |||
| Monthly Minimum Charges | : | Rs. 45/BHP/Month Plus | |
| Rs. 3/BHP/Month as demand charges in lieu of service rentals.(Rebate Rs. 3/BHP/month). | |||
| (b) Flat Rate Supply | : | Rs. 54/BHP/Month Plus | |
| Rs. 3/BHP/Month as demand charges in lieu of service rentals.(Rebate Rs. 7/BHP/Month). | |||
| Net Rate Payable | : | Rs. 50/BHP/Month. | |
| Monthly Minimum Charges | : | Same as Flat Rate. | |
| (ii) From City Feeders | |||
| Metered Supply | : | 56.5 paise/unit Plus | |
| Rs. 3/BHP/Month as demand charges in lieu of service rentals.(Rebate 6.5 paise/unit). | |||
| Net Rate Payable | : | 50 paise/unit Plus | |
| Rs. 3/BHP/Month as demand charges in lieu of service rentals. | |||
| Monthly Minimum Charges | : | Rs. 50/BHP/Month Plus | |
| Rs. 3/BHP/Month as demand charges in lieu of service rentals.(Rebate Rs. 3/BHP/month). |
4. Pumping House Lighting :
The consumption for bona fide lighting of the pump or machine house of 2 bulbs with total candle power agreegating 80 watts shall be allowed per tubewell connection.5. Load Surcharge for Exceeding connected Load :
If the connected load of a consumer exceeds the sanctioned load, the excess load shall be unauthorised load. Such excess of the connected load shall be charged load surcharge at an additional rate of Rs. 750/- per KW for each default. This load surcharge shall be without prejudice to Board's right to take such other appropriate action as may be deemed necessary to restrain the consumer from exceeding his connected load.Any consumer who exceeds his connected load will be liable to compensate the Board for all damages occasioned to its equipment or machinery by reason of this default. Without prejudice to this right, the Board may also cause the service of the consumer to be disconnected without any notice and shall be reconnected only after removal of unauthorised load and payment of load surcharge as given above.6. [ Capacitor Surcharge :
1. Availability :
Availability for lights, fans, appliances like pumping set/Central air conditioning plant/lift/welding set/Small lathe/electric drill/heater/battery charger/embroidery machine/printing press/Ice Candy/Dry cleaning machines/Power Press/Small motors in non-residential premises such as business houses, Cinemas, Clubs, Public Offices, Hospitals, Hotels/motels, departmental stores, shops, Guest houses, restaurants, offices, etc.Resale and sub-metering to tenants, adjoining houses and other parties is strictly prohibited except with the permission of the supplier. No separate circuit/connection for power load including pumping set/Central air- conditioning plant, lifts etc. is permitted.2. Character of service :
A.C. 50 Cycles, Single Phase 230 Volts or three phase 400 volts. For loads beyond 100 KW, supply shall be given on 11 KV. It can however, be released on LT at the discretion of supplier as per request of the consumer, if he agrees to pay transformation charges as applicable from time to time.3. Tariff :
| Energy Charges | = | 250 paise/Unit without prejudice to Monthly Minimum Chargesunder Clause-4 below. |
4. Monthly Minimum Charges :
The Monthly Minimum Charges (Excluding rentals etc.) shall be as under :-| (i) Loads upto 5 KW. | = | Rs. 60 per KW or part thereof. |
| (ii) Loads above 5 KW & upto 25 KW. | = | Rs. 75/- per KW or part thereof. |
| (iii) Loads above 25 KW. | = | Rs. 100/- per KW or part thereof. |
5. Load Surcharge :
If the connected load of a three phase consumer exceeds the sanctioned load, the excess in connected load shall be unauthorised load, such excess of the connected load shall be charged load surcharge at a rate of Rs. 750/- per KW for each default. This load surcharge shall be without prejudice to the Board's right to take such other appropriate action as may be deemed necessary to restrain the consumer from exceeding his connected load.Any consumer who exceeds his connected load will be liable to compensate the Board for all damages occasioned to its equipment or machinery by reasons of this default. Without prejudice to this right the Board may also cause the service of the consumer, to be disconnected without any notice. However, if unauthorised extension is upto 10% of sanctioned load or 50 KW which ever is less the consumer shall pay load surcharge and the connection may not be disconnected. The unauthorised load so detected shall however be got removed.6. Single-point Supply in a private Building complex :-
Mixed or pre-dominantly commercial loads of private connections housed in a building complex shall be catered as a single-point supply under Schedule NRS supply tariff with 5% rebate. Single point supply will be provided only if the connected load is 50 KW or above. If the connected load is in excess of 100 KW, supply voltage would be 11 KV. If load exceeds 5 MW, supply voltage would be 33/66 KV or 132 KV.VI. Schedule D.S. - Domestic Supply :1. Availability :
Available to single private house or flat for lights, fans, domestic pumping sets and house-hold appliances. Private dwellings, in which space is occasionally used for the conduct of business by a person residing therein shall also be served under this tariff. Where a portion of the dwelling is used regularly for the conduct of business, the consumption in that portion will be separately metered under separate connection and billed under the appropriate Non-residential Supply. If separate connection is not provided, the entire supply will be classified under Non-residential supply. Resale and sub-metering of supply to tenants or members of the same family residing in one premises shall be permitted. However, Resale and sub-metering to other flats or house-holds and other parties is strictly prohibited except with the permission of supplier.Note :2. Character of Service :
A.C. 50 Cycles, Single Phase 230 Volts or 3 Phase 400 Volts. For loads above 100 KW, supply shall be given on 11 KV. It can, however, be released on L.T. at the discretion of the supplier as per request of the consumer, if he agree to pay transformation charges applicable from time to time. However, for Govt. Polytechnics, a surcharge of 20% on the tariff shall be leviable for loads above 100 KW and released on 400 Volts. (L.T.).3. Tariff :
| First 25 Units | = | 92 Paise/unit. |
| Next 75 Units | = | 127 Paise/unit. |
| Next 400 Units | = | 162 Paise/unit. |
| Above 500 Units | = | 202 Paise/unit. |
4. Monthly Minimum Charges :
| (i) For loads upto 300 Watts. | = | Rs. 12/- per Connection. |
| (ii) Above 300 Watts and upto 10 KW | = | Rs. 24/- for the first KW or part thereof. |
| (iii) Loads above 10 KW. | = | Rs. 24/- per KW or part thereof. |
5. Load Surcharge :
If the connected load of three phase consumer exceeds the sanctioned load, the excess connected load shall be unauthorised load. Such excess of the connected load shall be charged load surcharge at a rate of Rs. 750/- per KW for each default. This load surcharge shall be without prejudice to the Board's right to take such other appropriate action as may be deemed necessary to restrain the consumer from exceeding his connected load.Any consumer who exceeds his connected load will be liable to compensate the Board for all damages occasioned to its equipment or machinery by reasons of this default. Without prejudice to this right, the Board may also cause the service of the consumer to be disconnected without any notice. However, if unauthorised extension is upto 10% of sanctioned or 50 KW which ever is less, the consumer shall pay load surcharge and the connection may not be disconnected. The unauthorised load so detected shall, however, be got removed.6. Single Point Supply in a private building complex :
Pre-dominantly domestic loads of private connections housed in a building complex may be catered as a single-point supply under Schedule 'Domestic Supply' tariff with 5% rebate. Single point supply will be provided only if the connected load is 50 KW or above. If the connected load is in excess of 100 KW, supply voltage would be 11 KV. If load exceeds 5KW, supply voltage would be 33/66 KV or 132 KV.VII. Schedule B.S. - Bulk Supply.1. Availability :
Available for general or mixed loads exceeding 10 KW to MES, Defence Establishments, Railways, Central P.W.D. Institutions, Hospitals, Departmental Colonies and other similar establishments where further distribution is to be done by the consumer.Note. :- The above Schedule shall not be applicable where 50% or more the total sanctioned load is motive/manufacturing load.2. Character of Service :
A.C. 50 cycles, 3 phase 400 Volts or 11 KV or higher Voltage at the option of the Supplier.Note. - all loads exceeding 100 KW load/100 KVA contract demand to be released on HT only.3. Tariff :
| A. H.T. (11 KV or above) | ||
| Energy Charges | = | 220 Paise/Unit without prejudice to MMC under Clause-4 below. |
| B. L.T. (400 Volts) | ||
| Energy Charges. | = | 240 Paise/Unit without prejudice to MMC under Clause 4 below. |
4. Monthly Minimum Charges :
| (a) H.T. Bulk Supply : | ||
| (i) Educational Institutions and Hospitals | = | Rs. 90/KVA of contract demand. |
| (ii) For others. | = | 120 KVA of contract demand. |
| (b) L.T. Bulk Supply : | ||
| (i) for Educational Institutions and Hospitals. | = | Rs. 100/KW or part thereof of sanctioned load. |
| (ii) For others. | = | Rs. 140/KW or part thereof of sanctioned load. |
5. Load Surcharge :
For LT Bulk Supply consumers, if the connected load exceeds the sanctioned load, the excess load shall be unauthorised load. Such excess of the connected load shall be charged load surcharge at an additional rate of Rs. 750/KW for each default. This load surcharge shall be without prejudice to the Board's right to take such other appropriate action as may be deemed necessary to restrain the consumer from exceeding his connected load.Any LT Bulk Supply consumer who exceeds his connected load will be liable to compensate the Board for all damages occasioned to its equipment or machinery, by reasons of this default. Without prejudice to this right, the Board may cause the service of the consumer to be disconnected without any notice. However, if unauthorised extension is upto 10% of the sanctioned load or 50 KW which ever is less, the consumer shall pay load surcharge and the connection may not be disconnected. The unauthorised load is detected shall however, be got removed.Note :-2. Character of Service :
A.C. 50 cycles, Single Phase 230 Volts or 3 Phase 400 volts.3. Tariff :
| Energy Charges | = | 250 paise/Unit |
| Plus | ||
| Line Mtc. and Lamp renewal Charges. |
4. Rates of Line Maintenance and Lamp renewal Charges :
Category-A.Where the initial installation of complete Street light fitting and lamps and their subsequent replacement is being carried out at the Board's cost, the line maintenance and lamp renewal charges are as under :-| (a) | Ordinary Lamps : | |
| (i) | Lamps upto 150 Watts. | Rs. 16/- per lamp per month. |
| (ii) | Lamps above 150 Watts and special lamps. | Special Quotations |
| (b) | Mercury Vapour Lamps : | |
| (i) | Lamps of 80 Watts. | Rs. 49/- per Lamp per month. |
| (ii) | Lamps of 125 Watts. | Rs. 53/- per Lamp per month. |
| (iii) | Lamps of 250 Watts. | Rs. 90/- per Lamp per month. |
| (iv) | Lamps of 400 Watts. | Rs. 101/- per Lamp per month. |
| (c) | Fluorescent Tubes : | |
| (i) | Single 2 ft. 20 Watts. | Rs. 26/- per point/month. |
| (ii) | Single 4 ft. 40 Watts. | Rs. 43/- per point/month. |
| (iii) | Double 2 ft. 20 Watts. | Rs. 43/- per point/month. |
| (iv) | Single 4 ft. 40 Watts. | Rs. 68/- per point/month. |
| (a) | Ordinary Lamps :- | |
| (i) | Lamps upto 150 Watts (including lamps of 40 | 60 |
| (ii) | Lamps above 150 Watts and special Lamps. | Special Quotations. |
| (b) | Mercury Vapour Lamps : | |
| (i) | Lamps of 80 Watts. | Rs. 29/- per Lamp/Month. |
| (ii) | Lamps of 125 Watts. | Rs. 36/- per Lamp/Month. |
| (iii) | Lamps of 250 Watts. | Rs. 63/- per Lamp/Month. |
| (iv) | Lamps of 400 Watts. | Rs. 68/- per Lamp/Month. |
| (c) | Flourescent Tubes :- | |
| (i) | Single 2 ft. 20 Watts. | Rs. 23/- per point/month. |
| (ii) | Single 4 ft. 40 Watts. | Rs. 40/- per point/month. |
| (iii) | Double 2 ft. 20 Watts. | Rs. 39/- per point/month. |
| (iv) | Single 4 ft. 40 Watts. | Rs. 61/- per point/month. |
| (a) | Ordinary Lamps | |
| (i) | Lamps upto 150 Watts (including lamps of 40 | 60 |
| (ii) | Lamps above 150 Watts and special Lamps. | Special Quotations. |
| (b) | Mercury Vapour Lamps : | |
| Lamps of 80 | 125 | |
| (c) | Flourescent Tubes :- | |
| (i) | Single 2 ft. 20 Watts. | Rs. 13/- per point/month. |
| (ii) | Single 4 ft. 40 Watts. | |
| (iii) | Double 2 ft. 20 Watts. | |
| (iv) | Single 4 ft. 40 Watts. |
| (i) | Flourescent tubes Single 2 ft. 20 Watts. | Rs. 16/- per point/month. |
| (ii) | Flourescent tubes single 4 ft. 40 Watts. | Rs. 16/- per point/month. |
| (iii) | Flourescent tubes double 2 ft. 40 Watts. | Rs. 18/- per point/month. |
| (iv) | Flourescent tubes single 4 ft. 40 Watts. | Rs. 21/- per point/month. |
5. Annual Minimum Charges :
If the total number of units consumed in the whole year (Calendar year) is less than it would have been if the lamps had been lit on an average of 8 hours per night over the whole year, the Board shall charge for the difference between the stipulated units and units actually consumed at tariff rates. The units consumed in a calender year will be calculated on the basis of sanctioned load or connected load detected which ever is higher. The annual minimum charges are exclusive of line maintenance and lamp renewal charges.IX. Schedule R.T. - Railway Traction :1. Availability :
Available to the Railway for traction loads.2. Character of Service :
A.C. 50 Cycles, Single/Two phase 132/220 KV depending upon the availability of bus voltage and transformer winding capacity at the feeding sub-station wherever possible at the discretion of the supplier.3. Tariff :
| Energy charges | 267 paise/Unit |
4. Monthly Minimum Charges :
The monthly minimum charges shall be leviable as under :-| MMC | Rs. 100/KVA/Month of the sanctioned contract demand. |
5. Contract demand and Demand Surcharge :
The contract demand means the maximum demand in KVA for the supply of which Board undertakes to provide facilities from time to time. The railways shall intimate the contract demand for sanction and the same shall be taken as connected load.The maximum demand for any month shall be defined as the highest average load measured in Kilovolt-Amperes during 30 or 15 consecutive minutes period of the month. If the actual demand recorded exceeds the sanctioned contract demand, such excess delivered shall be charged extra @ Rs. 250 KVA irrespective of number of defaults.6. Power Factor :
The monthly average power factor of the load shall not be less than 0.88 lagging. The monthly average power factor shall mean the ratio of total Kwh to total KVAh supplied during the month. The ratio shall be rounded upto two figures.If the monthly power factor falls below 88%, the Railway shall pay on the bill amount a surcharge of 1% for each 1% by which the monthly average power factor falls below 88%. The surcharge shall be 2% for each 1% by which monthly average p.f. falls below 80%. for the purpose of power factor surcharge the bill amount means the energy charges based on the consumption in a month, but not the bill amount payable on monthly minimum charges.7. Single Point Delivery :
The above tariff is based on the supply being given through a single delivery and metering point and at single voltage. Supply at other point or at other voltage shall be separately metered & billed.X. Schedule T.M. - Temporary Metered Supply :A. Tariff for Domestic and Non-Residential Supply :1. Availability :
Available to all domestic and non-residential supply consumers excluding touring Cinemas for maximum period of three months which may be extended at the discretion of the supplier upto a maximum period of one year.2. Character of Service :
A.C. 50 Cycle Single Phase 230 Volts or three phase 400 volts.3. Tariff :
Flat rate of Rs. 3.50 per Unit for all domestic and non-residential consumers.4. Monthly Minimum Charges :
Monthly Minimum Charges of Rs. 300/- or Rs. 40/KW of load which ever is higher for domestic and Rs. 600/- or Rs. 150/KW of load which ever is higher for non-residential consumers per connection (excluding rentals etc.) will be applicable for each period of 30 days or less.B. Tariff for Industrial Supply viz. Small Industrial Power, Medium Industrial Power and Large Industrial Power :1. Availability :
Available to all industrial consumers including pumps for dewatering in case of floods for maximum period of six months which may be extended at the discretion of the supplier upto one year.Note. :- Where factories with long gestation period have been sanctioned permanent loads, the temporary connection period may be extended beyond one year max. upto 2 years by the Chief Engineer/Op. concerned.2. Character of Service :-
A.C. 50 Cycle, Single Phase 230 Volts or three phase 400 Volts or 11 KV at supplier's option.3. Tariff :
As per rates of corresponding permanent supply Plus 100%.4. Factory (sic)
5. Monthly Minimum Payment :
Monthly Minimum Payment charges shall be monthly minimum charges payment of corresponding schedule for permanent supply plus 100%.6. Demand Surcharge and load Surcharge :
The demand charges where applicable shall be calculated on the basis of connected load detected or sanctioned connected load whichever is higher for the entire period of temporary connection.In case temporary supply consumer covered under this schedule exceeds contracted demand or unauthorised load is detected at his premises, the consumer shall be levied demand surcharge or load surcharge as applicable under relevant Schedule for permanent supply plus 100%.1. Availability :
Available to all industrial and agricultural consumers for the threshing of wheat for the period between 1st April to 30th June.This Schedule shall, however, not be applicable to A.P. tubewell consumers who are allowed to operate wheat threshers for self use on their existing motors without any additional charges.2. Character of Service :
A.C. 50 Cycle, three plase 400 Volts or Single phase 230 Volts at supplier's option.3. Tariff :
As per relevant industrial tariff plus 100%.| 4. Monthly Minimum Charges | same as per Clauses 5 & 6 respectively under Schedule-Xabove. |
| 5. Demand surcharge and load surcharge |
1. Availability :
Available to all Large fairs, like Jor Mela Fatehgarh Sahib, Hola Mela Anandpur Sahib, Baisakhi Mela Talwandi Sabo (Dam Dama Sahib) where a bulk Supply connection is applied by Management/Institutions/Govt. etc.2. Character of Service :
A.C. 50 Cycle, 3 phase 400 volts or 11 KV at Supplier's option3. Tariff :
Bulk Supply Tariff Plus 50%.4. Monthly Minimum Payment :
Monthly Minimum Charges @ Rs. 2500/- per service shall be applicable.2. Character of Service :
A.C. 50 Cycles, Single Phase 230 Volts or three phase 400 Volts at supplier's option.3. Tariff :
4. Monthly Minimum Payment :
Monthly Minimum Charges shall be Rs. 900/- per service for each period of 30 days or less for lights and fans and will be as per relevant industrial tariff plus 100% for the motive load.Special Conditions for Tariff A, B, D, & E above1. (p) If the Board provides and instals the service and meter, but augmentation of lines, erection of new H.T. lines & pole mounting sub-stations is not required then the consumer shall be charged four times the relevant charges prescribed in the standard Schedule of General and Service Charges respectively for each period of 30 days or less during which the temporary supply has been given, (service charges mean service/line rentals and not service connection charges/special charges).
2. If a consumer provides the material for service including service equipment and meter box (the Board installing the same) the consumer shall be responsible to pay the Board all erection and dismentlement charges incurred by the Board on the above service, departmental charges @ 50% on the cost of labour for erection and dismentlement. In such a case a consumer shall be charged no service charges, but only four times the relevant General charges (e.g. meter hire as referred to in special condition No. 1).
3. Before any expenditure is incurred in giving temporary supply a cash deposit should be taken in advance from the applicant to cover the following :-
| (i) Service Charges (e.g. line rentals) | Calculated according to special condition No. 1(p). |
| (ii) General charges (e.g. meter hire) | |
| (iii) Energy charges as per corresponding Schedule of Tariff for permanent supply Plus 100%. |
| (i) Erection & dismentlement charges includingdepartmental charges. | Calculated according to special condition No. 1(q). |
| (ii) General charges (e.g. meter hire)., | |
| (iii) Energy charges as per corresponding Schedule of tariff for permanent supply plus 100%. |
1. The prospective consumer who requires temporary connection for operating wheat threshers shall be charged service connection charges as under :-
2. Extension :-
In the case of existing tubewell consumers governed under the flat rate or metered supply rate require extension in load for operating wheat threshers service connection charges as mentioned under 1(a) to (c) above shall be recovered for total load. Such connection shall be governed under the relevant industrial Schedule for Temporary supply namely S.P., M.S., L.S. as the case may be subject to the minimum charges as per relevant industrial tariff for temporary supply for the total load.Notes :-1. The above tariff rates are exclusive of fuel surcharge which is leviable @ 8 Paise per unit w.e.f. 22.10.1996 (excluding agricultural consumers). Electricity duty and Octroi Charges which shall be leviable as per prevailing rates.
2. All other terms and conditions and other provisions relating to tariff shall remain unchanged.
3. The Electricity duty rates prevalent as on date are as under :-
| (a) | Domestic Supply | = 9 Paise/Unit |
| (b) | Non-Residential Supply | = 11 Paise/Unit |
| (c) | Industrial | Bulk Supply and Public Lighting |
| (d) | Agricultural Supply. | = Nil |
| (e) | Temporary Supply: | |
| (i) | For illumination on occasion of marriage or Social functionsconnected with marriage. | = 100 Paise/Unit |
| (ii) | Other than illumination. | = Normal duty rate as per relevant category of supply. |
| (f) | Electricity Duty to Govt. of India Offices/Works. | = As per Section 3(3)(a) and (b) of Punjab Elecy. Duty Act,1958, the offices and Works of Central Govt. are exempted fromthe levy of Elecy. Duty. |