State of Jharkhand - Act
Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015
JHARKHAND
India
India
Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015
Rule JHARKHAND-STATE-ELECTRICITY-REGULATORY-COMMISSION-ELECTRICITY-SUPPLY-CODE-REGULATIONS-2015 of 2015
- Published on 9 September 2015
- Commenced on 9 September 2015
- [This is the version of this document from 9 September 2015.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short Title, Extent and Commencement.
- 1.1 These Regulations may be called the Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015.2. Definitions and Interpretations.
- 2.1 Words, terms and expressions defined in the Electricity Act, 2003 as amended from time to time and used in these Regulations shall have and carry the same meaning as defined and assigned in the said Act. Expressions used herein but not specifically defined in the Act but defined under any law passed by a competent legislature and applicable to the electricity industry in the state shall have the meaning assigned to them in such law. Subject to the above, expressions used herein but not specifically defined in these Act or any law passed by a competent legislature shall have the meaning as is generally assigned in the electricity industry.3. Recovery of Charges.
- 3.1 The Distribution Licensee shall be authorized to recover charges for the supply of electricity from any person requiring such supply in accordance with the provisions of the Act and these Regulations and such charges shall include:(a)Recovery of such expenses as may be reasonably incurred by the Distribution Licensee in providing electric line or electrical plant used for giving such supply in accordance with these Regulations;(b)Charges for electricity supplied by licensee in accordance with the tariff order issued by the Commission;(c)Any other charges as may be approved by the Commission from time to time.4. System of Supply.
- 4.1 The Distribution Licensee shall supply power within the frequency band specified in the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 as amended from time to time. At the point of commencement of supply, except with the written consent of the consumer or with the previous sanction of the Commission, a supplier shall not permit the voltage to vary from the declared voltage more than the limit specified in the Central Electricity Authority (Grid Standards) Regulations, 2010.| Category | System of Supply |
| Low Tension | |
| All installations (other than irrigation pumpingand agricultural services) with a contracted load upto 5 kW | Single phase at 230 V |
| Irrigation pumping and agricultural services andall installations with a contracted load of more than 5 kW and upto 85 kW/100 kVA | 3 Phase, 4 wire at 400 V |
| High Tension | |
| Contracted load exceeding 100 kVA* and up to1500 kVA | 3 Phase at 6.6 kV / 11 kV / 22 kV |
| Contracted load exceeding 1500 kVA** and up to10000 kVA | 3 Phase at 22 kV/ 33 kV |
| Contracted load exceeding 10000 kVA and up to20000 kVA | 3 Phase at 33 kV |
| Extra High Tension | |
| Contracted load exceeding 20000 kVA | 3 Phase at 66 kV/ 110 kV/ 132 kV/ 220 kV |
5. Requisition for Supply.
- 5.1 Licensee's obligation to supply5.1.1The Distribution Licensee shall, on an application by the owner or occupier of any premises located in his area of supply, give supply of electricity to such premises within the time specified in these Regulations, provided:(a)the supply of power is technically feasible;(b)the applicant has observed the procedure specified in these Regulations; and(c)the applicant agrees to bear the cost of supply and services as specified in the Code.(d)[ Application form for release of new provisional electricity connection (for load up to 2kW) - Annexure 20.] [Inserted by Jharkhand Notification No. 62, dated 8.11.2018 (w.e.f. 7.9.2015).]5.1.2The system of supply and voltage shall depend on the category of the consumer and the load as per details given in section A4 of these Regulations, subject to clause 4.7 of these Regulations.6. Procedure for providing fresh electricity connection.
- 6.1 It shall be duty of the Distribution Licensee to:(a)Issue a duly authorized acknowledgement of each application form accepted, or(b)Inform an applicant upon request of the status of his application and the reasons if any, for non-disposal of the application.7. Procedure for Modification in Existing Connections.
- 7.1 The applicant shall apply for change in existing connection in the following format as given in the Annexure to these Regulations:(a)application format for change in name of registered consumer due to change in ownership/occupancy - Annexure 4;(b)application format for transfer of ownership to legal heir - Annexure 5;(c)application format for Conversion of Services / Change of Consumer Category / Shifting of Premises - Annexure 6;(d)application format for load enhancement/reduction - Annexure 7.8. Execution of Agreement and General Conditions of Supply.
- 8.1 Execution of Agreement8.1.1The Distribution Licensee may require the applicant to execute an agreement for obtaining new connection, for change of name, and for enhancement or reduction of sanctioned load before commencement of supply:Provided that for sanctioned load of less than 50 kW (67 HP / 63 kVA), the agreement provided for in this clause 8.1.1 shall not be required and the application form submitted and accepted shall constitute the agreement.8.1.2A copy of the agreement shall be given to the consumer upon execution of the same. An electronic media version of the form of agreement shall be made available on the internet website of the Distribution Licensee in downloadable format.8.1.3If there is no separate written agreement between the Distribution Licensee and the consumer, the latter, after supply of electricity has commenced, shall be deemed to be bound by terms and conditions of these Regulations.8.1.4An agreement shall include the following:(a)name and address of the consumer/applicant;(b)address of the premises for which electricity supply has been requisitioned and for which the agreement is being executed;(c)sanctioned load/ contract demand;(d)purpose of usage of electricity;(e)declaration by the applicant/consumer:(i)to abide by provisions of Act and these Regulations;(ii)to pay for the supply of electricity based on prevailing tariff rates;(iii)to pay for all other charges as become due in accordance with these Regulations and the approved schedule of charges of the Distribution Licensee;(iv)to deposit such security as the Distribution Licensee may be entitled to require from him under the Act and these Regulations.8.1.5The agreement shall be deemed to be terminated upon permanent disconnection of the consumer or where the consumer remains disconnected for a period of more than 6 months: Provided that the termination of agreement is without prejudice to the rights of the Distribution Licensee or the consumer under the Act for recovery of any amounts due under the agreement.8.1.6A consumer may terminate the agreement after giving a notice of thirty (30) days to the Distribution Licensee.8.1.7Whenever an agreement is terminated by notice given by the consumer, the Distribution Licensee shall give a written intimation to the consumer within five (5) days after termination failing which it shall be construed that such intimation has been given to the consumer.| Nature of Supply | Size of Installation | Max. Current Demand |
| Single phase/ three phase | (a) Up to and including 1 BHP. | Six times full load current |
| (b) Above 1 BHP and up to and including 10 BHP | Three times full load current | |
| (c) Above 10 BHP and up to and including 15 BHP | Two times the full load current | |
| (d) Above 15 BHP | One and a half times the full load current |