State of Madhya Pradesh - Act
M.P. Farmers' Organisation Rules, 1999
MADHYA PRADESH
India
India
M.P. Farmers' Organisation Rules, 1999
Rule M-P-FARMERS-ORGANISATION-RULES-1999 of 1999
- Published on 18 October 1999
- Commenced on 18 October 1999
- [This is the version of this document from 18 October 1999.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short title and commencement.
2. Definitions.
- In these Rules, unless the context otherwise requires,-3. The General Body Meetings.
4. Notice of meeting.
5. Quorum for the General Body.
6. Minutes of the Meeting.
7. Procedure for taking up works.
- For the purposes of taking up works under clauses (b) and (n) of Section 17, clauses (b) and (j) of Section 18 and clauses (b) and (i) of Section 19 of the Act, the Farmers' Organisation shall adopt the following procedure :-| (i)Special Repairs: | ||
| (a) Executive Engineer | : | Upto Rs. 1,00,000/- |
| (b) Superintending Engineer | : | Upto Rs. 10,00,000/- |
| (c) Chief Engineer | : | Full Power |
| (ii)Ordinary repairs : | ||
| (a) Sub-Engineer | : | Upto Rs. 20,000/- |
| (CompetentAuthority) | : | |
| (b) Assistant Engineer | : | Upto Rs. 50,000/- |
| (c) Executive Engineer | : | Full powers within the funds provided to Farmers’Organisation.] |
8. Social Audit of Farmers' Organisation.
9. Operational Plan and Water Budgeting.
- Water Budget for Farmers' Organisation. - The Managing Committee of the respective Farmers' Organisation shall, along with the assistance of the Competent Authority, prepare a water budget for the area of operation under its control as detailed below ;-10. Water Regulation.
- After a water budget is prepared, the Farmers' Organisation shall draw up a plan of water regulation as follows ;-11. Accounts/Finance.
12. Records to be maintained.
- Each of the Farmers' Organisations shall maintain the following records, other than the records specifically mentioned in the Act in these rules. An up-to-date copy of the Act/Rules/ Directions and orders of Commissioner/Government:-(a)The following maps shall be maintained by each Water Users' Association; namely :-(i)Map showing the boundaries and jurisdiction of the association, water conveyance system, within the boundaries of the association;(ii)Map showing the notified command area with serial numbers as prescribed in sub-rule (6) of Rule 3 of the Farmers' Organisation Constitution Rules, 1999.(b)The following registers shall be maintained; namely :-13. Levy & Collection of Fees.
14. Financial Audit.
- At the end of each financial year, and not later than three months after the commencement of the new financial year, each of the Farmers' Organisation shall cause its accounts to be audited as follows :-15. Functions of Competent Authority.
- In the functioning of the Managing Committee of the Farmers' Organisation, the Competent Authority, appointed under sub-section (1) of Section 21 of the Act, shall-| WAS/DAS/PAS/WTS/DTS/PTS Sanction No. and year | Sanctioned by | Head of Account | Name of work | Amount of Estimate | Date of Sanction | Initial |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) |
| Sl. No. | Distance from head | Position Right (R), Left (L), Across (X) | Name and description of work | Reduced levels (m) or ft. | Dimensions (m) or ft. | Slopes of bank number of vents openings | Areas chargeable catchment or drainage (ha/km.2) | Discharge capacity [Million m or (Mcft)] | Remarks | ||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) | (13) | (14) |
| Canals Channels, aqueducts or super passages | Bed(a) canal(b) drain | (a) FSI of canal(b) MEL of drain | (a) Top of lining(b) Bank/ parapet(c) Flood bank | (a) Canal BW/Bed fall(b) Drain BW/bed fall | Depth or height(a) canal(b) side wall | Top width of bank R/I(a) canal(b) flood bank | Front Rear & slopes(a) canal(b) flood bank | (a) Ayacut below(b) drainage area | At(a) ESI of canal(b) MFL of drain | 1. In case of regulators & bridges the dimensions undercolumn(a) should be up to bottom of grider. |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) | (13) | (14) |
| Drops and canal falls | Sill | Front(a) Bed(b) FSI | Rear(a) Bed(b) FSI | Length(a) at sill(b) at top | Height of opening vent or notch | Overall length | Number of openings of vents | Ayacut below | At FSL of canal | ||||
| Sluices or syphones | Sill or floor | (a) canal bed Front/rear(b) Drain bed | (a) Canal FSI fron/rear(b) Drain MFL | width at still | Height of vent | Overall length of pipe or barrel | Number of vents | (a) Ayacut(i) percent canal(ii) off-take canal | (a) At FSL(i) parent canal(ii) off-take canal(b)At MFL of drain | The avv regulators stand for the toilering FSL Full supplylevel MFL | |||
| Inlets Outlets escape, Sluices | Crest or still | MFL(a) above(b) below | Top(a) Canal bank(b) Canal bank operating | Width of wall (top/bottom of vent) | Height of wall or vent | Overall length | Number of vents | Drainage area | (a) At MFL(b) At FSL | Maximum flood level B/W Bed width R/L | |||
| Regulators and bridges | Crest or still | FSL(a) above(b) below | (a) Platform(b) Road | Width of(a) vent(b) Road way | Height of(a) vent(b) parapet | Overall length | (a) No. of vents(b) type of gates | Villages connected | At FSL | Right/Left |
| SI. No. | Village & S.No. Location | Building Type | ||||||
| Name Description | Walls | Floor | Roof | Plinth in sft. | Land | Standard Rent | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) |
| Lands | Remarks | Rent/Auction Amounts Realised | ||||||
| Canal Drain | Reach | S.No. | Extent | Type Wet/Dry waste Barren | 1997 | 1998 | 1999 | |
| (10) | (11) | (12) | (13) | (14) | (15) | (16) | (17) | (18) |
| SI.No. | M.P. Item No. | Tank Bund Canal Bank RF-LF Reach From - To |
| (1) | (2) | (3) |
| Details of M.P. Items | ||||||||
| Location | No. of Tree | Name of Tree | Girth & Rft. of Trunk | Grass or lulieflora | Fish | Born | Others | Min. Rent/ Bid fixed |
| (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| Year-wise collection | ||
| 1997 | 1998 | 1999 |
| (13) | (14) | (15) |
| SI.No. | Name of Machine | Make & Model | H.P. of Machine | Year of Purchase |
| (1) | (2) | (3) | (4) | (5) |
| Original Book Value | Hire charges per km. Hour | Working Condition | Remarks |
| (6) | (7) | (8) | (9) |
| Date | Reservoir level to 8 A.M. | Capacity in Mcft. | Head Sluice (1),/Sluice (2) | |
| Front Gauge | Rear Gauge | |||
| (1) | (2) | (3) | (4) | (5) |
| Head Sluice (1)/Sluice (2) | ||||
| Vent way & opening | Head | Discharge | Head over crest | |
| Cusecs | Mcft | |||
| (6) | (7) | (8) | (9) | (10) |
| Spillway/surplus weir | Evaporation | ||||
| Vent way & opening | Discharge | In ft. | in Mcft. | Total out flow Mcft. | |
| Cusecs | Mcft. | ||||
| (11) | (12) | (13) | (14) | (15) | (16) |
| Rainfall | Rise/fall of Res. Level in ft. | Net impounding depletion Mcft. | Total inflow Mcft. | Net Utilisation Mcft. | Remarks |
| (17) | (18) | (19) | (20) | (21) | (22) |
| Name of parent canal/Distributory......... | Name of the WUA/FO........... |
| At Start | At End |
| Bed width................... | Bed width........................ |
| Fully Supply Depth.......... | Fully Supply Depth............... |
| Gauge....................... | Gauge............................ |
| Discharge................... | Discharge........................ |
| Date | Time | Gauge @ Start of F.O. | Discharge in Cusecs |
| (1) | (2) | (3) | (4) |
| Gauge @ end of F.O. | Discharge in cusecs | Discharge | |
| In cusecs | In Mcft. | ||
| (5) | (6) | (7) | (8) |
| S. No. | Name of the Land Holder/Father's Name | Name of Village |
| (1) | (2) | (3) |
| Survey No. | Extent of Command Area | Total | Remarks |
| (4) | (5) | (6) | (7) |
| Sl.No. | Name of the Land Holder/Father's Name | Survey No. | Extent of holding |
| (1) | (2) | (3) | (4) |
| Actual Area Irrigated | Type of Crop | Nos. of Waterings | Water Charge Assessment | |
| Rate | Amount | |||
| (5) | (6) | (7) | (8) | (9) |
| Date of Receipt | No. of Temporary Receipt if any with date | No. of Vouchers received | From whom received | Amount |
| (1) | (2) | (3) | (4) | (5) |
| Head of Account | Details of Receipt | Dated Initials |
| (6) | (7) | (8) |
| Date of Payment | Voucher No. | To whom paid | Cash |
| (9) | (10) | (11) | (12) |
| Cheque | Head of Account | Details of Payment | Dated Initials |
| (13) | (14) | (15) | (16) |
| SI. No. | Date of Submission and Despatch No. | Name of the Work | Amount of Estimate |
| (1) | (2) | (3) | (4) |
| Ref. to sanction | Amount of the Bill | M.B. No. and Page | Name of the Agency | Initial |
| (5) | (6) | (7) | (8) | (9) |
| SI.No. | To whom the Cheque issued | Name of the work | Cheque No. & Date |
| (1) | (2) | (3) | (4) |
| Amount of the Cheque | Cheque Book No. | Amount of Budget | Balance Amount | Signature |
| (5) | (6) | (7) | (8) | (9) |
| Sl.No. | Date | Description of Special Fee | Period |
| (1) | (2) | (3) | (4) |
| From whom collected | Amount | Temp. Receipt No. | Remarks |
| (5) | (6) | (7) | (8) |