State of Uttar Pradesh - Act
The U.P. (Regulation Of Building Operations) Rules, 1985
UTTAR PRADESH
India
India
The U.P. (Regulation Of Building Operations) Rules, 1985
Rule THE-U-P-REGULATION-OF-BUILDING-OPERATIONS-RULES-1985 of 1985
- Published on 28 January 1985
- Commenced on 28 January 1985
- [This is the version of this document from 28 January 1985.]
- [Note: The original publication document is not available and this content could not be verified.]
Chapter I
1. Short Title and Commencement. -
(i)These rules may be called the Uttar Pradesh (Regulation of Building Operations) Rules, 1985.(ii)They shall come into force with effect from the date of their publication in the Gazette.2. Definitions. -
In these rules, unless the context otherwise requires:Chapter II
3. Development Permit. -
4. Information accompanying application for Development Permit. -
| Sl. No. | Designation | Trimed size (mm) |
| 1. | A1 | 841 X 1,189 |
| 2. | A2 | 594 X 841 |
| 3. | A3 | 420 X 594 |
| 4. | A4 | 297 X 420 |
| 5. | A5 | 210 X 297 |
| Sl. No. | Items | Site Plan | Building Plan | ||||
| White Plan | Blue Print | Ammonia Print | White Plan | Blue Print | Ammonia Print | ||
| 1. | Plot lines | Thick Black | Thick Black | Thick Black | Thick Black | Thick Black | Thick Black |
| 2. | Existing Street | Green | Green | Green | — | — | — |
| 3. | Future Street if any | Green Dotted | Green Dotted | Green Dotted | — | — | — |
| 4. | Permissible Building line | Thick Dotted Black | Thick Dotted Black | Thick Dotted Black | — | — | — |
| 5. | Open Spaces | No colour | No colour | No colour | No colour | No colour | No colour |
| 6. | Existing work | (Black Outline) | White | Blue | Black | White | Blue |
| 7. | Work proposed to be demolished | Yellow Hatched | Yellow Hatched | Yellow Hatched | Yellow Hatched | Yellow Hatched | Yellow Hatched |
| 8. [] [In the case of proposed for entirely new erection work on a plot, the proposed work on building plan need not be coloured.] | Proposed Work | Red filled in | Red | Red | Red | Red | Red |
| 9. | Drainage and Sewerage Work | Red Dotted | Red Dotted | Red Dotted | Red Dotted | Red Dotted | Red Dotted |
| 10. | Water Supply Work | Black Dotted Thin | Black Dotted Thin | Black Dotted Thin | Black Dotted Thin | Black Dotted Thin | Black Dotted Thin |
5. Fees for Development Permit. -
| (i) | For developmenl of area up to 1 hectare. | Rs. 500 |
| (ii) | For development of area above 1 hectare and upto 2.5 hectares. | Rs. 1000 |
| (iii) | For development of area above 2.5 hectare and upto 5 hectares. | Rs. 1500 |
| (iv) | For every additional 5 hectares or part thereof. | Rs. 500 |
6. Principles for Grant or Refusal of Development Permit. -
7. Duration of Sanction of Development Permit. -
8. Notice for Commencement of Development Work. -
The applicant, upon commencement of the work for development of land shall give notice in Form-E to the Prescribed Authority, and the Prescribed Authority shall cause inspection of the work to be made within fourteen days following the receipt of notice to verify the development work is being carried out in accordance with the sanctioned plans. If, however, the Prescribed Authority fails to make the inspection within the specified period, it shall be presumed that the Prescribed Authority has no objection to the starting of the development work according to the notice.9. Deviation during development. -
During the course of development work if any deviation from the sanctioned plan is intended to be made, permission of the Prescribed Authority shall be obtained before the proposed deviation is executed. It shall be incumbent upon every person, whose plans have been approved to submit amended plans for any deviation, he proposes to make.10. Fees and procedure. -
The fee and procedure laid down for original application for development permit heretofore shall mutatis mutandis apply to all amended plans.Chapter III
11. Building permit. -
12. Information accompanying application for building permit. -
13. Fees for building permit. -
| Fee in Rs. | |
| Upto 50 square meters | 10 |
| 51 to 100 square meters | 25 |
| 101 to 150 square meters | 50 |
| 151 to 300 square meters | 100 |
| for above 300 square meters | 10 |
| For every additional 50 square meters or partthereof plus Rs. 100 |
| Covered Area on all floors | Fee in Rs. |
| Upto 20 square meters | 100 |
| 21 to 50 square meters | 200 |
| for above 50 square meters | 200 |
| (for every additional 50 square meters or part thereof plusRs. 200) |
| Covered Area on all floors | Fee in Rs. |
| 150 square meters | 25 |
| more than 150 square meters | 50 |
| Covered Area on all floors | Fee in Rs. |
| 150 square meters | 200 |
| for above 150 square meters 100/-for every additional 150square meters or part thereof plus, Rs. 200. |