State of Jharkhand - Act

Jharkhand Building Byelaws 2016

JHARKHAND
India

Jharkhand Building Byelaws 2016

Rule JHARKHAND-BUILDING-BYELAWS-2016 of 2016

  • Published on 14 September 2006
  • Commenced on 14 September 2006
  • [This is the version of this document from 14 September 2006.]
  • [Note: The original publication document is not available and this content could not be verified.]
Jharkhand Building Byelaws 2016Chapter - I Definitions

1. Short title, Extent and commencement.

- 1.1 These byelaws shall be called the Jharkhand Building Byelaws 2016.
1.2These byelaws shall apply to all building activities in the area falling in;i. All Regional Development Authorities.ii. All Urban Local Bodies.iii. Mineral Area Development Authority.iv. All Industrial Area Development Authorities.
1.3The State Government may notify certain areas on its own or on the recommendation of Development Authorities/Municipalities/ULBs where these byelaws shall not apply.
1.4The State Government may notify any area on its own or on the recommendation of Development Authorities/Municipalities/ULBs where these byelaws shall apply.
1.5All existing rules, regulations, byelaws, orders that are in conflict or inconsistent with these bye laws shall stand modified to the extent of the provision of these bye laws.
1.6In case Master Plan/Development Plans/Zonal Plans are notified by the authority subsequent to the publication of these bye laws, the corresponding provisions made in the master plan/development plans/zonal plans shall override the provisions made in these bye laws.
1.7These bye laws shall come into force on the date of its Notification.

2. Definitions.

- 2.1 In these bye laws, unless the context otherwise requires:
2.2"Act" means the JRDA Act 2002 (Adopted), Jharkhand Municipal Act, 2011 & Mineral Area Development Authority Act 2001, Ranchi Regional Development Authority Act 2001 & Jharkhand Industrial Area Development Authority Act 2001.
2.3"Advertising Sign" means any surface or structure with characters, letters or illustrations applied there to and displayed in any manner whatsoever outdoors for the purpose of advertising or giving information or to attract the public to any place, person, public performance, article, or merchandise, and which surface or structure is attached to, forms part of; or is connected with any building, or is fixed to the ground or to any pole, screen, fence or hoarding or displayed in space, or in or over any water body included in the jurisdiction of the Authority;
2.4"Affordable Housing"
(a)"Affordable Housing Project" shall mean housing projects where 35% of the houses are constructed for EWS/LIG category.
(b)"Affordable Housing Units" shall mean dwelling units for EWS and LIG households only.
(c)Economically Weaker Section (EWS): EWS households are defined as households having an annual income up to Rs.3,00,000 (Rupees Three Lakhs) or State shall have the flexibility to re-define the annual income criteria as per local conditions in consultation with the Centre.
(d)EWS House: An all weather single unit or a unit in a multi-storied super structure having carpet area of up to 30sqm. with adequate basic civic services and infrastructure services like toilet, water, electricity etc.
2.5"Agricultural use" means use of land for the purpose of agriculture, horticulture, sericulture, animal husbandry, poultry farming, plant nursery, piggery, dairy farming, vegetable farming and any activity related to agriculture or milk chilling plant;
2.6"Air-Conditioning" means the process of treating air so as to control simultaneously its temperature, humidity, cleanliness and distribution to meet the requirement of conditioned space;
2.7"Air Port Reference Point" means a designated point, which is established in the horizontal plain at or near the geometric center of the landing area as defined by the concerned airport authority;
2.8"Amenity" means roads, street, open spaces, parks, recreational grounds, play grounds, gardens, water supply, electric supply, street lighting, sewerage, drainage, public works and other utilities, services and conveniences;
2.9"Annexure" means an Annexure appended to these bye laws;
2.10"Apartment (Flat)" means a part of the property, provided by the promoter/developer in a multi-storied building including one or more rooms or enclosed spaces located on one or more floors or any part for residential or for the practice of any profession or for the carrying on of any occupation, trade or for business or such other type of independent uses as may be prescribed, and with a direct exit to a public street, road or highway or to a Common area or room (whether or not adjacent to the multi-storied building in which such Apartment is located) provided by the promoter for use by the owner of such Apartment for parking any vehicle or as the case may be for the residence of any domestic aide employed in such an Apartment.
2.11"Addition/Alteration" means structural change, such as addition to the covered area or height or the removal of part of a building or construction or cutting into or removal of any load bearing/wall/partition/column, beam, joist, floor or other support etc. excluding opening and closing of a window or door or ventilator providing intercommunicating doors or providing partitions.
2.12"Applicant" means the person who is the owner of the land or building or has title to a land lease or building and includes:A. A trustee who is entrusted with or is concerned with any building. Approved by the Authority having jurisdiction.B. A receiver, executor or administrator or a manager appointed by any Court of competent jurisdiction to have the charge of or to exercise the rights of the owner.C. A mortgagee in possession;D. A builder or developer engaged by the owner.
2.13"Authority" means Ranchi Regional Development Authority/Urban Local Bodies (ULB)/Mineral Area Development Authority, Industrial Area Development Authority.
2.14"Balcony" means a Horizontal projection to serve as passage or sit out place including parapet;
2.15"Barsati" means a covered space of the roof used as a shelter during rain. It will have at least one side open and will not cover more than 20% of the area of the roof and in no case such covered area will not exceed more than 20sqm. Barsati shall be a common area of the building and shall not be sold out as a separate unit. In case construction is made in violation of the norms mentioned the barsati shall be treated and accounted for as a separate floor under these bye laws.
2.16"Basement or cellar" means part of building below or partly below the ground level.
2.17"Builder" means an applicant, land owner, contractor, holder of power of attorney of the land owner, partnership, trust or company which has responsibility for construction, leasing, selling or disposing otherwise of a building for residential and other purposes and duly registered by the Authority.
2.18"Board" means a Board constituted by the State Government/Authority/U LBs.
2.19"Building" means any structure or erection or part of a structure or erection which is intended to be used for residential, commercial. industrial or any other purpose including boundary wall whether in actual use or not, and in particular. The building shall be classified as below:
2.19.1. "Assembly Building" refers to a building or part of a building where group of people congregate or gather for amusement, recreation, social, religious, patriotic and similar purposes and includes theaters, assembly halls, auditoria, exhibition halls, museum, skating rink. gymnasium, dance hall, club rooms recreation places and stadia;
2.19.2"Commercial Building" refers to a building or part of a building, which is used for transaction of business, keeping of accounts and records or for similar purposes and includes Banks and Commercial Offices and Corporate offices. It shall include mercantile buildings like shops, stores, market display and sale of merchandise either in wholesale or retail, or offices, storage or services facilities incidental to the sale of merchandise and includes Cinema Halls, Petrol Pumps. Hotels, Restaurants, Clinics, Pathology Labs, Nursing Homes, Lodge-cum-guesthouses & Dharm Kantas, Hospitals, Dispensaries etc.;
2.19.3"Educational Building" refers to a building used for school, college, or daycare purpose for more than 8 hours per week involving assembly, instructions, education or recreation;
2.19.4"Hazardous Building" refers to a building or part of a building which is used for the storage, handling, manufacture or processing of highly combustible or explosive materials or products which are liable to burn with extreme rapidity and/or producing poisonous fumes, or the storage, handling, manufacturing or processing of which involves highly corrosive, toxic, obnoxious alkalis, acids or other liquids, gases or chemicals, producing flame, fumes and explosion, poisonous irritant or corrosive gasses and for the storage, handling or processing of any material producing explosive mixture of dust or which result in the division of matter into line particles subject to spontaneous ignition. This shall include petrol filling stations;
2.19.5"Industrial Building" refers to a building or part of a building in which products or materials of all kind and properties are fabricated, assembled or processed such as assembly plants, laboratories, power plants, smoke houses, refineries, gas plants, mills, dairies or factories;
2.19.6"Institutional Building" refers to a building or part of a building which is used for purposes such as Research and Training Centre, Public/Semi Public offices, Mental Health Care Center and Hospitals with teaching facilities;
2.19.7"Mercantile Buildings" refers to arty building or part of a building which is used as shops, stores, market, for display and sale of merchandise, either wholesale or retail, office, stores, and service facilities incidental to the sale of merchandise and located in the same building shall be included under this group;
2.19.8"Residential Building" refers to a building in which sleeping accommodation is provided for normal residential purpose with or without cooking or dining or both facilities and includes one or two or multi-family dwelling dormitories, apartment houses, flats and hostels;
2.19.9"Public Utility Building" means and includes Post Office, Police Station, Fire Station, Hospital, Dispensary, Health Centre, and Telephone Exchange, sub-station, water works, Taxi Stands, Bus Terminals, etc.;
2.19.10"Storage Building" refers to a building or part of building used primarily for the storage or sheltering of goods, storehouses. hangers. terminal depot. grain elevators, barn or stables;
2.19.11. "Multi-Level Car Parking Building" means a building partly below ground level having two or more basements or above ground level, primarily to be used for parking of cars. scooters or any other type of light motorized vehicles;
2.20"Accessory Building" means a subordinate building, use of which is incidental to that of a principal building, on the same plot such as garage, coal or fuel shed, peons, chowkidars, or domestic help quarters, etc;
2.21"Building Height" means the vertical distance measured. in the case of flat roofs, from the average level of the centre line of the adjoining street or plinth subject to limit of 0.90m. from the existing average level of the Centre line of the adjoining street to the highest point of the building wall adjacent to the street and in case of pitched roofs, up to the point where the external surface of the outer wall intersects the finished surface of the sloping roofs, and in the case of gables facing the road the mid point between the eaves level and ridge. Architectural features serving no other function except that of decoration shall be excluded for the purpose of measuring heights of the building.In case the contiguous ground level of the building is above the average level of the centre line of the adjoining street, the height of the building shall be measured from such contiguous ground level or plinth level, subject to limit of 0.90 m, from the existing average level of the centre line of the adjoining street.In case of basement, the height of the building shall be measured from the top level of the basement slab not exceeding 1.20m. from the existing average level of the centre line of the adjoining street.
2.22"Building line" means the line up to which the plinth of a building adjoining a street or an extension of a street or on a future street may lawfully extend and includes the lines prescribed in any development plan in operation for any area under the jurisdiction of the Authority or specification indicated in any Planning or Development Scheme, or in these Bye Laws;
2.23"Built up Area" means the total covered areas on all floors of an immovable property;
2.24"Canopy" means cantilevered projection over any entrance;
2.25"Carpet area" means the covered area of the usable rooms of an apartment unit at any floor (excluding the area covered by walls, columns and partitions;
2.26"Cornice" means a sloping or horizontal structural overhang usually provided over openings or external walls to provide protection from sun and rain; or for architectural consideration;
2.27"Chajja/Sun-Shade" means a sloping or horizontal structural overhang, usually provided at lintel level for protection from sun and rain or for architectural considerations;
2.28"Chimney" means an upright shaft containing and encasing one or more flues provided for the conveyance to the outer air of any product of combustion; resulting from the operation of any heat producing appliance or equipment employing solid, liquid or gaseous fuel;
2.29"Combustible materials" means a material, which bums or adds to a fire when used for combustibility in accordance with good practice;
2.30"Competent Authority" shall mean the Authority Notified by the Government of Jharkhand Urban Development & Housing Department. It shall be the VC of RRDA/MD of MADA/MD of AIDA & MC/EO of the respective municipalities/ULBs;
2.31"Conversion" means the change of occupancy to another occupancy or change in building structure or part thereof resulting in change of space or use requiring additional occupancy certificate;
2.32"Corner plot" means a plot at the junctions of and fronting on two or more intersecting streets the frontage could be on the street having larger width. In cases, where the two streets are of same width, then the larger side of the plot will decide the frontage. In such case, the location of a garage (on a corner plot) if provided, within the open space shall be located diagonally opposite the point intersection;
2.33"Courtyard" means a space permanently open to sky, with or without pergola, enclosed fully or partially by buildings and may be at ground level or any other level within a building;
2.34"Coverage" means percentage of covered area on the ground floor which is not open to sky excluding the chajja/roof/balcony projections up to 0.75 meter width overhanging the open space to the total plot area;
2.35"Covered Area" means in respect of ground floor, area covered immediately above the plinth level by the building but does not include the open space covered by:
2.35.1Gardens, rockery, well and well-structures, rainwater harvesting structures, plant nursery, water-pool (if uncovered), platform round a tree, tank, fountain, bench, chabutara with open top unenclosed on sides by walls. boundary wall. swing, and area covered by chhajja without any pillars etc, touching the ground;
2.35.2Drainage culvert conduit. catch-pit, gully pit, inspection chamber, gutter and the like;
2.35.3Compound wall, Porch and Portico without any construction over it, gate, slide/swing door, canopy, and areas covered by chajjas or similar projections steps leading to the plinth not higher than 0.9m;
2.35.4Watchmen booths, pump houses, garbage shafts, electric cabins or substations, and such other utility structure meant for the services of the building under construction;
2.36"Development" means such dead end means of access with an additional turning space not less than 81 square meters in area having no dimension less than 9 m.;
2.37"Damp-Proof Course" means course consisting of some appropriate water proofing material provided to prevent penetration of dampness;
2.38"Detached building" means a building whose walls and roof are independent of any other building with open spaces on all sides;
2.39"Development" means carrying out of building, engineering, mining or other operations in, or over, or under land or water, or in the use of any building or land, and includes redevelopment and layout an subdivision of any land; and to develop shall be construed accordingly;
2.40"Department" means an Urban Development and Housing Department, Government of Jharkhand;
2.40.1"Development Authority" means an authority as defined by the Jharkhand Regional Development Authority Act-2001, Jharkhand Industrial Area Development Authority Act-2001 and MADA;
2.41"Development Plan/Comprehensive Development Plan" includes any development plan either interim or comprehensive or zonal plan in operation for the area under the jurisdiction of the Authority;
2.42"Deviation" means any construction made in departure from the approved plan by way of alterations or additions, modifications in the total floor area, coverage, floor area ratio (FAR), setbacks, height, parking space, provision of public utilities etc.
2.43"Drain" means a line of pipes including all fittings and equipment such as manholes, inspection chamber, traps, gullies and floor traps, used for the drainage of a building or a number of buildings, or yards appurtenant to the buildings within the same cartilage and includes open channels used for conveying surface water;
2.44"Drainage" means the removal of any liquid by a system constructed for this purpose;
2.45"Dwelling Unit" means an independent housing unit with facilities for living, cooking and sanitary requirements;
2.46"EWS House" means a house/flat or dwelling unit intended for Economically Weaker Sections with maximum carpet area of 30sqm. or as decided by the State Government;
2.47"EWS Plot" means a residential plot intended for Economically Weaker Sections having maximum plot area of 48sqm. or as decided by the State Government;
2.48"Encroachment" means an act to enter into the possession or rights either of permanent or temporary nature on a land or buildup property of local body or state/central Government;
2.49"Existing Use" means use of a building or structure existing authorized with the approval of the Authority before the commencement of these Bye laws;
2.50"Enclosed stair-case" means a stair-case, separated by fire resistant walls from the rest of the building;
2.51"Existing Building or Use" means a building, structure or its use as sanctioned/approved/regularized by the Competent Authority, existing before the commencement of these Bye laws;
2.52"Exit" means a passage, channel or means of egress from any building, storey or floor area to a street or other open space of safety;
2.53"External Wall" means an outer wall of a building even though adjoining to a wall of another building and also means a wall abutting on an interior open space of a building;
2.54"Farm House" means a plot of land including construction thereon in the area designated for agricultural use by the Authority.
2.55"Farm Shed" shall include permanent or temporary structures erected in the plot used for farmhouse;
2.56"Fire Alarm System" means an arrangement of call points or detectors, sounders and other equipment for the transmission and indication of alarm and sometimes used as signals for testing of circuits and whenever required for the operation of auxiliary services.This device may be work automatically or manually to alert the occupants in the event of fire;
2.57"Fire Lift" means lift specially designed for use by fire service personnel in the event of fire;
2.58"Fire Proof Door" means a door or shutter fitted to a wall opening, and constructed and erected with the requirement to check the transmission of heat and fire for a specified period;
2.59"Fire Resisting Material" means the material, which is normally used for fire resistance;
2.60"Flat" means a dwelling unit in building.
2.61"Floor" means the lower surface in a storey on which one normally walks in a building;
2.62"Floor Area" means accessible covered area of a building on any floor.
2.63"Floor Area Ratio (FAR)" means the quotient obtained by dividing the total covered area on all floors with the area of the plot;
2.64"Footing" means the part of a structure, which is in direct contact with the ground and transmitting loads to the ground;
2.65"Forms" means forms appended to these bye laws
2.66"Foundation" means that part of a structure, which is indirect contact with and meant for transmitting loads to the ground;
2.67"Gallery" means an intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor area. additional seating accommodation, etc. It shall also include structures provided for seating in stadia;
2.68"Garage-Private" means a building or a portion thereof designed for parking of privately owned motor vehicles or any other vehicles;
2.69"Garage-Public" means a building or a portion thereof designed or used for repairing, servicing, hiring, selling or parking of motor driven or any other vehicles;
2.70"Ground Floor" shall mean storey, which has its floor surface nearest to the ground around the building;
2.71"Group Housing" means the development normally and preferably in two or more multi-storeyed blocks shall not be customary sub-division of land into street and plots. It may be also of low rise buildings in many clusters.
2.72"Group Housing Scheme" is reckoned as development of Residential Buildings in a Campus or Site of 3000sqrn. and above in area and could be row houses, semi-detached/detached Houses, Apartment blocks or High-Rise buildings or mix or combination of the above.
2.73"Habitable room" means a room having area of not less than 9.5sqm., minimum width of 2.4m. and minimum height of 2.75m. (2.40 m. in case of air conditioned rooms or areas) occupied or designed for occupancy by one or more persons for study, living, sleeping, eating, cooking if it is used as a living room, but does not include bathrooms, water closet compartments, laundries, serving and storage pantries, corridors, cellars, attics and spaces that are not used frequently or during extended periods;
2.74"Hazardous material"
2.74.1Means material which are highly combustible or explosive and or which may produce poisonous fumes explosive emanations, or storage. handling, processing or manufacturing of which may involve highly corrosive, toxic, obnoxious alkalis or acids or other liquids or radioactive substances;
2.74.2Other liquids or chemicals producing flame, fumes, explosive, poisonous, irritant or corrosive gases or which may produce explosive mixtures of dust or fine particles capable of spontaneous ignition;
2.75"Hazardous and obnoxious industry" means industry which creates nuisance to the surrounding development in the form of smell, smoke, gas, dust, air pollution, water pollution and other unhygienic conditions;
2.76"Natural hazard prone areas" means areas likely to have moderate to high intensity earthquake, or cyclonic storm, or significant flood flow or inundation, or landslides/mud flows/avalanches, or one or more of these hazards;Note: Moderate to very high damage risk zones' of' earthquakes are shown in Seismic Zones III. IV and V specified in IS: 1893 and flood prone areas in river plains (unprotected and protected) are indicated in the Flood Atlas of India prepared by the Central Water Commission, besides,. Other areas which can be flooded under conditions of heavy intensity rains, inundation in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area and landslide prone areas as identified by State Government/Land surveys;
2.77"heritage Zone" means the area as delineated in Development Plan/MP/ZDP;
2.78"Illuminated Exit Signs" means a device for indicating the means of escape during normal circumstances and power failure;
2.79"Jhamp" means a downward vertical or sloping projection hanging below the balcony to provide protection from direct sun or rain.
2.80"Katra/Chawl" means a building so constructed as to be suitable for living in separate tenements each consisting a single room, or of two, but not more than two rooms and with common sanitary arrangements;
2.81"Land Use" means use of the land proposed in the Development Plan/Master Plan/Zonal Plan. Before coming into operation of the Development Plan/Master Plan/Zonal Plan, for the purpose of the application of these bye laws, the authority may designate land use zone with the approval of the Government;
2.82"Latrine-connected" means a latrine connected to the municipal sewer system;
2.83"Latrine-unconnected" means a latrine not connected to the municipal sewer system: it may be connected to a septic tank or suitable treatment or disposal system;
2.84"Lay by" means a place at the side of a road where a vehicle can turn or can stop for a short time without interrupting other traffic, this area Should be in level of the road and suitably paved;
2.85"Ledgell Tand" means a shelf-like projection supported in any manner whatsoever, except by means of vertical supports within a room itself but not having projection wider than 1.0 meter and at a minimum clear height of 2.1 meters from the floor level;
2.86"LIG House" means a house or dwelling unit intended for low income groups with a carpet area of maximum 60sqm. or as specified by the State Government;
2.87"LIG Plot" means a residential plot intended for low income groups with a plot area of maximum 60sqm. or as specified by the State Government;
2.88"Loft" means an intermediate floor between two floors or a residual space in a pitched roof, above normal floor level with a maximum height of 1.5 meters and which is constructed or adopted for storage purposes only;
2.89"Licensed Technical Person" means Architect registered with the Council of Architecture or Civil Engineer/Structural Engineer/Town Planner/Supervisor licensed by the Authority;
2.90"Masonry" means an assemblage of masonry units properly bonded together with mortar;
2.91"Master Plan" means any document prepared under the Jharkhand Regional Development Authority Act-2002/Jharkhand Municipal Act-2011 and erstwhile Jharkhand Town Planning and Improvement Trust Act-1951 and any other Ordinance or enactments to be formulated from time to time by the Authorities set up under the provisions of the above enactments or prepared in consistent with any relevant act by Jharkhand State Town and Country Planning Organization for ensuring organized urban development.
2.92"Mezzanine Floor" means an intermediate floor between any two floors;
2.93"Mixed Land Use" means mixed use of the building/premises consisting of more than one compatible use of which the principal use shall not be less than 2/3rd of total built up area;
2.94"Multi-Storey or high Rise Building" means a building whose height is 16.40 meters or more: but for purpose of fire regulation of any building of 15 metre and above in height shall be considered as Multi Stored building;
2.95"Mumty or Stair Cover" means a structure with a covering roof over staircase and its landing built to enclose only the stairs for the purpose of providing protection from weather and not used for human
2.96"Mitigation" means measures taken in advance of a disaster aimed at minimizing or eliminating its impact on society and on environment including preparedness and prevention;
2.97"New Area" means such area as notified by the Authority with approval of Urban Development & Housing Department;
2.98"Non-Combustible Material" means a material, which does not burn nor add heat to a fire when tested for combustibility in accordance with good practice;
2.99"Non -Conforming Use of a Building or Land" means the use of a building or land existing at the time of commencement of these Bye laws, and which does not conform to the Bye laws pertaining to the zone in which it is located;
3.0"Occupancy or Use" means the principal occupancy for which a building or a part of a building is used or intended to be used.
3.1"Old Area" means such area as notified by the Authority/ULBs with approval of Urban Development & Housing Department. In case of Ranchi area under jurisdiction of Ranchi Municipal Corporation as on Dec, 2015 shall be consider as Old Area and area beyond that shall be deemed to be New Area;
3.2"Open Space" means an area forming an integral part of the plot, left open to the sky;
3.3"Owner" means a person, group of persons, a company, trust, Institute, Registered body, State or Central Government and its departments, undertakings and the like in whose name the property stands registered in revenue records. The owner shall include:
3.3.1An agent or trustee who receives the rent on behalf of the owner;
3.3.2An agent or trustee who receives the rent of or is entrusted with or is concerned with any building, devoted to religious or charitable purpose;
3.3.3A receiver, executor or administrator or a manager appointed by any court of competent jurisdiction to have the charge of or to exercise rights of the owners, and
3.3.4A mortgage in possession
3.4"Parapet" means a low wall or railing built along the edge of a roof or a floor having a minimum height of 1.0m;
3.5"Parking Space" means an area enclosed or unenclosed, covered or open, of sufficient size to park vehicles, together with a driveway connecting the parking space with a Street or any public area and permitting ingress and egress of the vehicles;
3.6"Parking Complex/Parking Lot" means premises either built or open which is utilized purely for parking of vehicles permitted in specific areas,
3.7"Partition" means an interior non-load bearing wall, one storey or part of a storey in height,
3.8"Permit" means a permission or authorization in writing by the Authority to carry out the work regulated by these Bye-laws;
3.9"Plantation" means plantation of plants and trees;
3.10"Plinth" means the portion of a structure between the surface of the surrounding ground and the surface of the floor, immediately above the ground;
3.11"Plinth Area" means the built up area measured at the floor level of ground floor;
3.12"Porch" means a covered surface supported on pillar or otherwise for the purpose of pedestrian or vehicular approach to a building;
3.13"Public Utility service" means drainage, sewerage, electricity, water supply, solid waste disposal, sanitation, fire services, roads and any other support or infrastructure and the like for which a building has to depend on public bodies, authorities or agencies;
3.14"Ramp" means a passage with gradual slope joining two level surfaces;
3.15"Real Estate Development" means development undertaken for sale;
3.16"Registered Architect" means an Architect registered with the Council of Architecture and who has not been debarred by the Authority:
3.17"Registered Builder/Developer" means a builder registered with the Authority and who Ids not been debarred by the Authority;
3.18"Registered Engineer" means a engineer empanelled/registered with the Authority and who has not been debarred by the Authority;
3.19"Road" means any access vise, highway, street, lane, pathway, alley, or bridge, whether a thoroughfare or not, over which the public have right of passage or access or have passed and had access uninterruptedly for a specified period and includes all bunds, channels, ditches, storm water drains, culverts, side tracks, traffic islands, road side trees and hedges, retaining walls, fences barriers and railings within the road line;
3.20"Road Width or Width of Road/Street" means the whole extent of space within the boundaries of a road when applied to a new road/street as laid down in the city survey or development plan Master Plan/Zonal Plan or prescribed road lines by any act of law and measured at right angles;Plans under these bye-laws, shall be approved on the basis of width of the road/street that exists on the day of sanctioning of the plans;
3.21"Row Housing" means a row of contiguous houses with only front, rear and interior open spaces;
3.22"Room Height" means the vertical distance measured from the finished floor level to the finished ceiling;
3.23"Schedule" means a Schedule appended to these bye laws;
3.24"Section" means section of the Regional Development Authority Act/Jharkhand Municipal Act-2011, Jharkhand Area Development Authority Act-2001 and Mineral Area Development Authority Act-2001;
3.25"Sanction Plan" means the set of plans and specifications submitted under the Bye-laws in connection with a building and development of land and duly approved and sanctioned by the authorities/ULBs.
3.26"Semi-Detached Building" means building detached on three sides (front, rear and side) with open spaces as specified under the Bye laws.
3.27"Set back" means the distance between the plinth lines of the building and the boundary/property line of the plot. The setback shall be measured at ground level.
3.28"Setback line" means a line usually parallel to the plot boundaries and laid down in each case by the Authority beyond which nothing can be constructed towards the plot boundaries.
3.29"Settlement" means a human settlement, whether urban or rural in character. It includes habited villages, towns, townships, cities and the areas notified under the control of the Authority.
3.30"Site" means a parcel or piece of land enclosed by definite boundaries.
3.31"Site with Double Frontage" means a site having frontage on two streets other than corner plot.
3.32"Service Floor" means floor used for services in hotel or commercial building above ground floor in case of more than four storied buildings.
3.33"Service Lane" means a lane provided at rear or side of a plot for service purposes.
3.34"Service Road" means a road/lane provided at the front, rear or side of a plot for service purpose.
3.35"Site Depth" means horizontal distance between the front and rear side boundaries.
3.36"Smoke Stop Door" means a door for preventing or checking the spread of smoke from one area to another.
3.37"Stilt floor" means a floor supported by pillars with all sides open to be used for parking, switch room, generator room, society room, information room, entrance lobby, guard room and visitors' toilet with minimum clear height of 2.4 meter from floor to ceiling and not less than 2.10m. from the soffit of beams.
3.38"Storage Space" means a space where goods of non-hazardous nature are stored and includes cold storage and banking safe vaults.
3.39"Store Room" means a room used as storage.
3.40"Spiral Staircase" means a staircase forming continuous winding curve round a central point or axis provided in a open space having tread without risers.
3.41"Storey" means the space between the surface of any floor and the surface of the floor next above it, or if there be no floor above it then the space between any floor and the ceiling next above it, but shall not include a service or mezzanine floor;
3.42"Supervisor" means a person having Diploma in Architectural Assistant-ship/Diploma in Civil Engineering/equivalent qualification.
3.43"Tenements" means room or rooms in the occupation of, or meant for the occupation of one tenement;
3.44"To abut" means to abut on a road so that any portion of the building or land is on the road boundary;
3.45"To erect" a building means:
3.45.1To erect new building on any site whether previously built upon or not;
3.45.2To re-erect any building of which portions above the plinth level have been pulled down or destroyed;
3.46"Tribunal" means A Tribunal created under JRDA Act 2002/Jharkhand Municipal Act 2011.
3.47"Unsafe Building" means buildings which are structurally and constructional unsafe, or in-sanitary, or do not provide adequate means of egress, or which constitute fire hazard, or are otherwise dangerous to human life or property, or which in relation to existing use constitute a hazard to safety/health/public welfare by reason of inadequate maintenance, dilapidation or abandonment.
3.48"Unauthorized Construction" means the erection or re-erection, addition or alternation, which is not approved or sanctioned by the Authority.
3.49"Underground/Overhead Tank" means an underground/overhead water tank, constructed or placed to store water.
3.50"Verandah" means space with at least one side open to the outside with the exception of one-meter parapet on the upper floors to be provided on the open side.
3.51"Ventilation" means the supply of outside air into a building through window or other openings due to wind outside and convection effects arising from temperature, or vapor pressure differences (or both) between inside and outside of the building.
3.52"Water Closet'/W.C." means a privy with arrangement for flushing the pan with water but does not include a bath room;
3.53"Watercourse" means a natural channel or an artificial channel formed by draining or diversion of a natural channel meant for carrying storm and waste-water.
3.54"DAKHAL KABJA" means an opening to the outside other than a door, which provides all or part of the required light or ventilation, or both to an interior space.
3.55Risk based classification of Buildings-
Criteria High Risk Medium Risk Low Risk
Hazardous Building Storing explosives and inflammable Not so Not so
Fly Zone Above 30 meters in any place and within funnelzone of Airport. Less than 30 meters and within funnel zone ofAirport Outside funnel zone of Airport
Fire Ground Coverage of more than 500 sqm. on anyfloor of building and more than 15 meters height Ground coverage of more than 300 sqm. on anyfloor of building or more and 11 meters height None
Building Stability (Concrete Building) More than 60 year of age of building 50-70 years Less than 50 years
Type of usage close assembly building Open assembly building Non assembly building
3.56There are four categories inspections have been mentioned in Bye-laws. These four categories inspections have been linked to risk category of building. The following tables have exhibited the relationship between inspection category and risk category of building
Name of Inspection Risk Category of Building
Low Medium High
Inspection Mandatory Mandatory Mandatory
Third Party inspection cum certification Optional Mandate Mandatory
Joint Inspection Optional Mandate Mandatory
Surprise Inspection   Optional Optional
Note:- As per above table, inspections is compulsory for all categories of buildings. Joint inspection and third party inspection-cum-certification are mandatory to medium an high risk category of building. Surprise inspection will be based complain received and observation by concern authority.Chapter -II Administration

3. Applicability.

- Subject to the provisions of the Jharkhand Regional Development Authority Act/MADA Act/Jharkhand Municipal Act-2011 and Jharkhand Area Development Authority Act 2001 these bye laws shall apply:
3.1To the planning, design and construction of building in case of erection of a building:
3.2To all parts of the building whether removed or not, and in case of removal of whole or any part of the building;
3.3To the remaining part of the building after demolition and work involved in demolition in case of demolition of whole or any part of a building;
3.4To the whole building whether existing or new building (except only to that part of the building, which is consistent with these bye laws) in case of alteration of a building;
3.5To all parts of the building affected by the change in case of change of occupancy of a building; and
3.6To use of any land or building where sub-division of land is undertaken or use of land or building is changed;

4. Deemed Permission.

- 4.1 The construction of any building in respect of which permission has been issued before coming into force of these bye laws, shall, so far as it is not inconsistent with the provisions of the old bye laws, continue to be validly made and the said permission shall be deemed to have been issued under the corresponding provisions of these bye laws.
4.2Where any building has been constructed before the notification of these byelaws with deviation of an approved plan, the provisions of old byelaws shall be insisted upon.
4.3Where any building has been constructed without an approved plan, the provisions of these byelaws shall be insisted upon.

5. Application.

- 5.1 Any person who intends to develop land, erect, re-erect or make additions or alterations in any building, demolish any building or subdivide a plot for development shall apply to the Competent Authority. The Competent Authority may prescribe separate formats for different categories of buildings and group housing and land development.
5.2Colouring of plans- Plans shall be shown as specified in Table 1. Where items of work are notified, the coloring notation used shall be indexed.Table 1: Coloring notation of the plans
Sl. Item Site Plan Building Plan
Computer Print/White Print Blue Print Ammonia Print Computer Print/White Print Blue Print Ammonia Print
1 2 3 4 5 6 7 8
1 Plot Line Thick Black Thick Black Thick Black Thick Black Thick Black Thick Black
2 Existing Street Green Green Green - - -
3 Future Street Green dotted Green dotted Green dotted Green dotted - -
4 Permissible Building Thick dotted black Thick dotted black Thick dotted black Thick Thick Thick
5 Open Spaces No Colour No Colour No Colour No Colour No Colour No Colour
6 Existing outline Black White Blue Black White Black
7 Work Proposed to be demolished Yellow hatched Yellow hatched Yellow hatched Yellow hatched Yellow hatched Yellow hatched
8 Proposed work-            
(a) Additions and alterations Red tilled Red Red Red Red Red
(b) Entirely new work Not to be coloured Not to be coloured Not to he coloured Not to be coloured Not to be coloured Not to be coloured
9 Drainage and sewerage work Red dotted Red dotted Red dotted Red dotted Red dotted Red dotted
10 Water Supply work Black dotted thin Black dotted thin Black dotted thin Black dotted thin Black dotted thin Black dotted thin
5.3Application for development permit-The application shall be made to the Competent Authority in Form-I. The following shall accompany the application for development permit in the case of development or re-development of land into plots, sub-divisions or land use zones. The documents shall be submitted in 4 copies along with a soft copy in PDF and CAD format.
5.3.1Key Plan- This shall show the location of land proposed to be subdivided. This shall also show the North point and scale used.
5.3.2Site Plan- This shall be drawn on a scale of not less than 1:1000 for plots up to 10 hectares and not less than 1:2000 for plots above 10 hectares and shall show-
5.3.2.1The boundaries of the site with dimensions and the details of contiguous land belonging to application indicating the kheasra numbers or any other equivalent local denomination, and in case, the continuous land owned by the applicant had been subdivided earlier, public facilities provided in it and all streets within it opening out in the site for which the permission is being sought.
5.3.2.2The means of access for existing street (name and width of the street is to be mentioned) to the land. which, the applicant intends to subdivide.
5.3.2.3The position of all existing structures and features like high tension line, telegraph and electrical poles, underground pipe lines, trees, grave yards, religious buildings, railway lines, etc. within a distance of 30 meters from the nearest edge of the site.
5.3.2.4All major physical characteristics of land proposed to be developed which include the approximate location and size of water body, normal flood-affected areas and contours at an interval of 0.5 meters in case of the site which has a slope of more than I in 20.
5.3.2.5Location of the site in Master Plan/Zonal Development Plan or in zoning as specified by the authority. Copies of Master Plan/Zonal Development Plan shall be supplied by the Authority on Payment. The Master Plan/Zonal Plan shall also be made available on the Web Site of the Authority which could be downloaded by the applicant for use.
5.3.2.6Present and proposed use of land.
5.3.2.7Scale used and north point.
5.3.3Sub-division layout Plan- This shall be drawn on a scale of not less than 1:500 for Plot upto 10 hectares and not less than 1:1000 for plots above 10 hectares. This shall apply to plans for integrated development schemes also. This shall contain the following-
5.3.3.1Scale used and north point,
5.3.3.2The location of all proposed and existing roads with their widths within the land,
5.3.3.3Building lines showing the set backs with dimensions within each plot where applicable,
5.3.3.4The location of drains, sewers, public facilities and services and electrical lines etc. and their connections to existing public utility services system,
5.3.3.5An analysis indicating, size, area and use of all the plots in the subdivision lay out plan,
5.3.3.6A statement indicating the total area of the site area utilized under roads, open spaces, schools, shopping and other public places along with their percentage with reference to the total area of the site proposed to be subdivided,
5.3.3.7In case of plots which are subdivided in built up areas in addition to the means of access to the subdivision from existing streets and the exiting service lines laid.
5.3.4Specification-Every application for permission of sub-division of land shall also be accompanied by the following statements-
5.3.4.1A statement containing general specification of all improvements proposed to be made within the area for example, grading and paving of roads and lanes, provision of gutters, side drains, provision of sufficient, safe and assured water supply, arrangement of sewage disposal, street lighting and development of parks and play fields and public utilities,
5.3.4.2The purpose for which the land is to be used and a written analysis of distribution of land under different uses,
5.3.4.3General specifications of the materials to be used;
5.3.4.4The quality and quantity of effluent in respect of industrial units. Any other statement required by the Authority.
5.4Ownership title- Every application for development permit shall be accompanied by the following for verifying proof of ownership-
5.4.1Self Attested copy of the original sale/lease deed, and
5.4.2Self Attested copy of the revenue receipt (Malguzari receipt) Municipal Holding Tax receipt with khesra/holding No., Khatiyan or mutation records.
In case of mutual partition deeds (un-registered) "Dakhal Kabja" along with malguzari receipt is essential or, Affidavit or other documents acceptable to the authority.

6. Application for building permit.

- Application shall be made to the Competent Authority in Form-II. The following shall accompany the application for building permit in the case of permission for erection, re-erection of making material alternation of Post-Facto approval of the existing building. The documents shall be submitted in 4 copies along with a soft copy in PDF and CAD format.
6.1Site Plan - Plan set with an application shall be drawn to a scale of not less than 1:500 for areas up to hectares and not less than 1:1000 for areas more than 1 hectare and shall show-
6.1.1The boundary of the site with the contiguous land around it.
6.1.2The position of site in relation to neighboring street along with the municipal plot number and revenue plot number the name of the street in which the building is proposed to be situated, if any;
6.1.3The name of street in which the building is proposed to be situated if any;
6.1.4All existing buildings standing on over or under the site;
6.1.5The position of the building or of all other building (if any) which the application intents to erect upon his contiguous land to in relation to:
6.1.5.1The boundaries of the site and in case where the site has been partitioned, the boundaries of the portion owned by the applicant and also of the portion owned by the others.
6.1.5.2All adjacent streets, buildings (with number of the stories) and premises within a distance of 15m of the site of the contiguous land (if any).
6.1.5.3If there is no street within a distance 15rn of the site, the nearest existing street.
6.1.6The means of access from the Street to the building and all other building which the owner intends to erect upon his contiguous land;
6.1.7Dimension of the spaces to be left in and around the building to secure a free circulation of air, admission of light and access for scavenging purposes and details of projection (if any) on the open spaces;
6.1.8The width of the Street (if any) in front and of any street (if any) at the site of rear of the proposed building;
6.1.9Scale used and the direction of north point relating to plan of ...the building.
6.1.10any existing physical features, such as wells, drains etc.
6.111 Sewerage and drainage lines up to discharge point and water supply lines.
6.1.12location of trees.
6.1.13such other particulars as may be prescribed by the authority.
6.2Building Plan- The plan of the building and two elevations (front and side) and two sections accompanying the application shall be drawn to a scale not less than (1:100). The plan shall-
6.2.1Include the floor plans/mezzanine plan/service floor of all floors together with the covered area clearly indicating the spacing of all framing members and sizes of rooms and the position of staircase, ramps and lift wells;
6.2.2Show the use or occupancy of all parts of the building;
6.2.3Details of the parking spaces with calculations;
6.2.4Show exact location of essential services for example: WC, sink, bath and the like including the water supply and drainage line;
6.2.5Including two elevation (front and sides) and sectional drawing with their materials and size and locations of doors, windows and other openings. The sections shall indicate the heights of building and rooms and also the height of the parapet and the drainage and slope of the roof. At least one section should be taken through the staircase;
6.2.6Show all street elevations (levels), finished ground level;
6.2.7Indicate details of compound walls (including height and sections) around the boundary;
6.2.8Give dimensions of the permissible projected portions within open spaces;
6.2.9Rain water harvesting system, terrace plan indicating the drainage and the slope of the roof;
6.2.10Give indications of the north point relative to the plan and scale used; and
6.2.11Any other particulars as desired by the Authority.
6.3Services Plan- Plans, elevations and sections of private water supply and sewerage disposal system independent of the municipal services (if any) drawn to a scale of 1:10 shall be included.
6.4Specifications-General specification giving type and grade of materials to be used shall accompany the application.
6.5Ownership Title-Every application for building permit shall be accompanied by the following for verifying proof of ownership.
6.5.1Self Attested copy of the original sale/lease deed, and
6.5.2Self Attested copy of the Revenue Survey sheet/Municipal Survey sheet with Khesra no. or mutation record.
6.6Additional documents relating to submission of Building plan for all buildings including Multi storied/Special Buildings which are 15m. or more in height and for special buildings like educational, assembly, institutional, industrial, storage, shopping complex and multiplex and hazardous and mixed occupancies with any of the aforesaid occupancies having ground covered area more than 500 sqm., the following additional information shall be furnished/indicated in the building plan in addition to the items given in chapter-II, section (4) as applicable:
6.7Access to fire appliances/vehicles with details of vehicular turning circle and clear motorable access way around the buildings, parking provision plan with arrangement & movement;
6.8Size (width) of main and alternative staircases along with balcony approach, corridor, ventilated lobby approach;
6.9Location and details of lift enclosures;
6.10Location and size of fire lift;
6.11Smoke stop lobby/door, where provided;
6.12Refuse chutes, refuse chamber, service duct, etc;
6.13Vehicular parking space, parking space for fire brigade and ambulance;
6.14Details of how the fire brigade/ambulance will travel within the plot:
6.15Refuse area, if any;
6.16Detail of exits including provision of ramps, etc., for hospitals and special risk buildings/uses
6.17Location of generator, transformer and switch gear room;
6.18Location and details of fixed fire protection installations, such as sprinklers, wet risers, hose-reels, drenchers, etc;
6.19Location and details of first-aid firefighting equipment/installations.
6.20longitudinal cross sections of the building including details of building and room heights and of staircase.
6.21Area calculations for plot area, built up area and carpet areas of apartments.
6.22Attested Certificate of registration with Council of Architecture for Architects and Degree certificate for EngineersNote: The above sub-section of byelaws as applicable 6.10, 6.11, 6.12, 6.13, 6.14, 6.15, 6.16, 6.17, 6.18 & 6.19 shall be as per the approval of Fire Service Department.
6.23Services plans: The services plan shall include all details of building and plumbing services, and also plans, elevations and sections of private water supply, sewage disposal system and rain water harvesting system.
6.24Landscape Plan: The landscape plan shall include the area to be developed as lawn, garden, plantation etc.
6.25Specifications: Specifications, both general and detailed, giving type and grade of materials to be used duly signed by the registered architect, engineer, structural engineer;

7. Certificates/Clearances.

- 7.1 Self Attested copy of original sale/lease deed, attested copy of the revenue receipt/Municipal Holding Tax receipt/holding number and mutation records.
7.2In case the applicant is a trust, group of persons, partnership or a company, a registered agreement between the holder of the right, title and interest and the applicant, valid under the Transfer of Properties Act, 1982 and Copies of the Agreement/Article of Association/Memorandum/Bye-laws.
7.3No Objection Certificate from the Jharkhand State Housing Board/any Regional Development Authority, for the additional constructions, in case the house/plot is delivered by the Board/Authority.
7.4Necessary environmental clearance from the appropriate authority wherever applicable. Refer to provisions laid down in the Environmental Impact Assessment Notification-2006 dated 14 September 2006, amended by subsequent notifications by Ministry of Environment and Forest, Government of India. The Department of Environment and Forest, Government of Jharkhand may also prescribe norms for environment clearance.
7.5For all buildings with a height of 15.0 meters and above or covered area at any floor within premises more than 500 sq m, NOC from Fire Service Department shall be obtained.
7.6NOC from Airport Authority of India shall be furnished wherever applicable.
7.7A certificate from the registered Engineer that the building plan and the design complies with the standard safety including safety against Earthquake is required in prescribed Form-III. For buildings above G+2 (maximum 10m height) the registered Engineer shall also supervise the construction of the building.
7.8For buildings more 15m in height, structural stability certificate in the prescribed Form-IV with Design Basis Report, signed by the engineer/structural engineer and the owner jointly shall be furnished.
7.9Supervision certificate in Form-V shall be furnished by the registered architect/engineer/structural engineer/supervisor/town planner undertaking the supervision.
7.10A check list in Form-VI shall be furnished by the empanelled/registered technical person.

8. Signing the Plans.

- 8.1 All the plans shall be prepared and duly signed by a registered/empanelled technical person as specified in Annexure-I (viz. Architect, Engineer, Structural Engineer, Town Planner, Supervisor, Draftsman) and Builder who shall indicate their names, addresses, and registration numbers on the body of the plan and in all other relevant documents. The concerned owner of the land shall also sign the plans.
8.2All plans, drawings, statements, design details shall bear the signature of the applicants and shall be duly countersigned by an empanelled Architect/Technical person. All documents and plans related to structural designs shall bear the full name and full signature of a registered Structural Engineer.Note:- 1. The registered Architect/Technical Person who has prepared the plan shall put the empanelment number/Registration No. and seal on all plans and documents signed by him and shall also furnish a certificate to the effect that he shall supervise the construction of the building and shall he responsible for any deviation from the approved plan except if the Owner/Architect/Technical person intimates that their agreement for services has been terminated. The constructions shall be stopped immediately until agreement with another architect/technical person is executed and intimated immediately to the authority.

2. Wherever required under these bye-laws, the registered Structural Engineer, who has prepared the structural design, shall put his seal, and address on all the documents signed by him and shall also furnish a certificate to the effect that he shall supervise the structural part of the construction and shall be responsible for any structural failure except caused by unprecedented natural calamities in Form-W and except if the owner intimates that his services have been terminated.

3. All aspects related to structural design, building surface, plumbing, electrical installation, sanitary arrangements, fire protection shall adhere to the specification, standards and code of practice recommended in the National Building Code of India, 2005 and any breach' thereof shall be deemed to be a breach of the requirements tinder these Bye laws.

8.3The technical personnel and builder as specified in sub-bye law (1) & (2) above shall have to be registered/empanelled with the Authority. Their qualifications and, competence shall be as per Annexure-l. The application form shall be as per Form-V11(A) & Form-V11 (B).
8.4No plans for construction of apartment building, group housing and commercial building shall be entertained unless the builder is registered by the Authority in accordance with the competence as specified in the Annexure-1.
8.5When it comes to the notice of the Planning Municipalities/Urban Local Bodies or any other person that a plan signed by technical personnel or builder referred to under, sub-bye law (1) & (2) is sanctioned in violation of the norms of these bye-laws he shall bring this to the notice of the Authority.
8.6The Authority shall issue a notice asking for, a show cause within fifteen days as to why such technical personnel or builder shall not be disqualified/black listed and legal action taken against him. After receipt of the show cause if any, the matter shall be placed before the Concerned Authority for a decision on such disqualification/black listing/legal action. The decision of the Concerned Authority on disqualification/black listing shall be published in the notice Board of the Authority.
8.7An appeal against an order under sub-clause (6) above all buildings governing through these Bye-laws shall lie with Municipal Building Tribunal constituted under the Jharkhand Municipal Act 2011.

9. Fees.

- 9.1 The Authority shall levy the following fees:9.1.1Every application for permission for building operation or development shall be accompanied by a building fee as specified in these bye laws.9.1.2Fees for retention of structures for temporary period shall he as decided by the Authority from time to time.9.1.3Fees for change of occupancy as decided by the Authority from time to time.9.1.4Fees for change of land use as decided by the Authority with permission to State Government from time to time.9.1.5Any other fee decided by the authority with the approval of the Urban Development and Housing Department or concern Department.9.1.6The concern department may change the fees prescribed in these bye laws through a notification from time to time.
9.2Development permit fee. - The scale of fees for development permit shall be as per Table 2.Table 2 : Development permit fees
Sl. Area of Plot Nagar Panchayat (Rs) Municipal Council (Rs) Municipal Corporation/RRDAMADA/IADA
(i) (ii) (iii) (iv) (v)
1 upto 1.0 hectare 6000 8000 10000
2 above 1.0 hectare & up to 2.5 hectare 12000 15000 20000
3 above 2.5 hectare & up to 5.0 hectare 16000 20000 30000
9.2.1For development permit above 5 hectare for every addition of 1 hectare or part there will be an additional fee of Rs.2000 per hectare.
9.2.2In the case of development permit for non residential use the above fees shall be doubled for different sizes of land
9.3Building permit fee:- The scale of fees for residential building permit shall be as per Table 3.1 & Table 3.2 belowTable-3.1 Residential buildings up to 500sqm. permit Fees-Rs. Per sqm.
Sl. Height of Building Nagar Panchayat Municipal Council Municipal Corporation/DevelopmentAuthorities/IADA
(i) (ii) (iii) (iv) (v)
1 upto 10.0 m 10.0 15.0 20.0
2 more than 10 up to 16.4m 20.0 25.0 40.0
3 More than 16.4 m 30.0 35.0 50.0
Table-3.2 Residential buildings more than 500sqm. permit Fees-Rs. Per sqm
Sl. Height of Building Nagar Panchayat Municipal Council Municipal Corporation/DevelopmentAuthorities/IADA
(i) (ii) (iii) (iv) (v)
1 upto 10.0 m 15.0 20.0 30.0
2 more than 10 up to 16.4m 25.0 35.0 50.0
3 More than 16.4 m 35.0 45.0 60.0
Note.- (1) Minimum fees for residential building shall be Rs. 2000/-
(2)Fee at the time of submission of the map will be 50% of the total fee calculated at the time of submission. The final fee will be deposited before issuing the sanctioned Plan. The deposited fees will not be refunded under any circumstances.
9.4Buildings for Charitable Purpose: In case of Institutional buildings built for charitable, religious purpose the fees shall be charged at half of the rates prescribed in Table 3.1 &3.2
9.5Non Residential Buildings: In case of buildings other than those mentioned in (i) above to be used for non-residential purpose, the fees charged shall be double of the rates prescribed in Table 3.1 & 3.2
9.6No fees for Central/State Government buildings including Government funded buildings, but Semi-Public Sectors/Public Sectors/Any Agency/Limited Company of the Central Government/State Government shall have to deposit building fees as per prescribed fee structure in Table 3.1 & 3.2
9.6.1The department may alter various aforementioned fees from time to time as per requirement and circumstances.
9.6.2The department may exempt various aforementioned fees as case to case basis as per requirement and circumstances.
9.7Fixation of fees. - The fixation of these fees shall be governed by the following. -
9.7.1For re-erection of existing building, the fees chargeable shall be the same as that for erection of new building.
9.7.2For additions and alterations in the existing building, the fees shall be chargeable on the added portions only, and on the same scale as for a new building.
9.7.3For revision and revalidation of a plan of a building, which the Authority has already sanctioned, the fees chargeable shall be 1/4 of the fees chargeable on the original plan subject to the condition that the covered area of the building has not increased than in the original sanctioned plan.
9.7.4In case of additions and alterations of building, if the use of the building is also changed, then the chargeable fees shall be calculated on the use proposed.
9.7.5In case of basements, for the purpose of calculating the fees the area covered under the basement shall .be counted towards the covered area.
9.7.6In the case of buildings with principal and subsidiary occupancies, in which the fees to be levied are different, and then the fees for the total building scheme shall be calculated as per the rates applicable for respective occupancies.
The owner may withdraw his application and plans at any time prior to the sanction and such withdrawal shall terminate all proceedings with respect to such application. The fees paid in such cases shall not be refunded.
9.8Infrastructure Development Fees. - The Authority may also impose an infrastructure development fees with the approval of the Department.

10. Permission.

- 10.1 No permission or notice shall be required for the works related to the following alterations and the like which do not otherwise violate any provisions regarding general building requirements, structural stability and fire and health safety requirements of the National Building Code-2005:10.1.1Opening and closing of a window or door or ventilator;10.1.2Providing intercommunicating doors;10.1.3Providing or removing partitions;10.1.4Providing false ceiling;10.1.5Gardening;10.1.6White washing;10.1.7Painting;10.1.8Re-tiling and reproofing;10.1.9Plastering and patch work;10.1.10Re-flooring; and10.1.11Construction of sunshades on one's own land.
10.2Permission shall necessarily be obtained for works to be carried out by Central Government and State Government Departments/Jharkhand State Housing Board. Such permission shall be deemed to be granted/approved after 45 days of submission of such application, provided all mandatory and relevant document submitted by such department, and no objection has been raised by the authority within that period.
10.3In case of such Government Projects lying in the area outside of any development plan/scheme, the concerned Government Agency shall ensure to obtain NOC required as per provision of these bye laws and relevant Acts and should submit approval drawing in conformity with these Bye-laws.In all cases completion certificate, signed by the concerned Government Agency, has to be submitted as required in Performa in Annexure-VI after the construction
10.4All clarifications with respect to deficiency in the plan, documents will be sought for from the applicant within 30 days.
10.5Once the plan has been scrutinized and objections have been pointed out, the applicant shall modify the plan to comply with the objections raised and resubmit it. The Competent Authority shall scrutinize the resubmitted plan and if there will be further objections, the applicant should be given one more chance to comply with the objections raised within a period of 30 days after which if the final revised plan are not resubmitted the plan shall be rejected
10.6The Competent Authority shall communicate either approval in Form-VIII (A) or refusal in Form-1X within 60 days from date of receipt of application under Bye Law-5 or within 30 days from the compliance of objection raised by the Competent Authority.
10.7For all buildings, occupancy shall only be accorded, once the builder has developed the onsite and offsite infrastructure like connectivity of sewerage, drainage, water supply, road etc. as per the specification of the local Authority and obtain their NOC.The basic infrastructure like connectivity of sewerage or septic tank for sewerage treatment, drainage, water supply, road, electrical connection etc. should also be mandatory for all buildings before occupancy certificate is issued, irrespective of height or built up area.The Authority shall establish a single window clearance system to process such NOCs and clearances related to it.
10.8A residential building may be constructed by the owner of the land without prior approval of the plan by the Authority if the size of the plot is not more than 300 sq. meters and if all the conditions mentioned below are satisfied:
10.8.1The applicant shall submit an application to the Authority as prescribed in bye law 5(4) along with a certificate from the registered Engineer/Architect that the building plan and the design complies with the Earthquake Safety.
10.8.2The height is not more than 10 meters,
10.8.3The number of floors does not exceed ground plus two floors,
10.8.4No basement is to be constructed,
10.8.5The road, drainage, sewerage and other infrastructure have been developed as per the approved layout plan or provisions for their development has been made in the building plan,
10.8.6A notice in Form-X is submitted to the Authority, with a copy of the plan, documents mentioned at above and the record of rights, statement of compliances made to the objection raised by the Authority (if any) 60 days prior to commencement of construction; and
10.8.7All other conditions of the bye laws are met;
10.8.8The owner shall have to submit completion certificate to the Authority in proforma of Annexure-VI.
10.8.9The owner shall remain responsible for any violation of the norms prescribed under the Bye laWs: Nothing in this provision will enable the owner to violate any of the provisions of the Bye laws. The registered architects/engineers/town planners and other technical personnel shall also be responsible for any violation of norms prescribe under the bye-laws.
10.9A sanctioned letter will be given by the authority stating that submitted plan may be considered as sanctioned for the purpose of Housing Loan.
10.10In case the permission is refused an appeal shall be filed before the Tribunal.

11. Duration of Permission.

- 1 1.1 Every permission granted under these bye laws shall remain valid up to three years from the date such permission is granted for buildings more than 10,000 sqm. built up area the validity duration will be of 5 years. The completion certificate shall have to be submitted within this period. However, in case of failure to submit the completion certificate within the prescribed period, the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed by the authority and such revalidation shall be valid for another two years.
11.2If the building/development works is not completed within the above mentioned stipulated period, the applicant shall make a fresh application for approval of building plan.

12. Information at the site of construction.

- 12.1 Whereas tests of any material are made to ensure conformity of the requirements of these bye laws, records of the tests data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
12.2The persons, to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued, a copy of approved drawings and specifications;

13. Periodic report of Construction.

- 13.1 In case of high rise buildings the builder/owner/applicant shall submit a periodic progress report after plinth level, each roof slab casting in Form-XI to the authority. The process of submission of such reports shall be made easy through an online process. The authority has to make site inspection within 15 days from the date of application and if the construction is found as per bye laws the authority will issue a go ahead certificate to the applicant within 10 days of inspection.

14. Inspection procedure. - 14.1 As a matter of course all construction or work for which a permit is required shall be subject to inspection by the Authority at all reasonable hours with prior intimation.

14.2Inspection, where required, shall be made within 15 days following the receipt of periodic report of construction in Form-XI. At the first inspection, the Authority shall determine that the building construction has been taken up in accordance with approved plans. A copy of the inspection report shall also be made available to the builder/developer. Inspection report shall be submitted.
14.3Joint inspection will be done by concerned ULB's Authority, Fire Service Department, Airport Authority and Environment authority as and when required. Applicant applies individual NOC to respective department for availing NOC through carry out joint inspection at least time. The relevant authorities will intimate the date and time to inspect and inform the same to applicant to present at site on specified date and time. A team of authorities shall jointly come and inspect and issue NOC certificates to applicant after inspection
14.4Surprise inspection on the basic of complaint or otherwise only be done by the prior permission of EO/Special Officer/MC/MDNC of ULBs/Authorities.
14.5JE/Inspector site inspection report will be submitted/uploaded within in 48 hours after inspection.
14.6Such establishment or proposal comes under high risk building classification as per bye-laws specified inspection mentioned in section-3.55 is mandatory and will be conducted by concern authority.
14.7Such establishment or proposal comes under moderate risk building classification as per Bye-laws, specified inspection mentioned in section 3.55 is not mandatory and will be conducted by concern authority based on their observation.
14.8Such establishment or proposal comes under low risk building classification as per Bye-laws, specified inspection mentioned in section 3.55 is not applicable for this category.

15. Third Party certification.

- 15.1 Accredited architects/engineers may be authorized to do inspection as third party inspection of any building under construction or completed, by the head of the authority.
15.2Such accredited architects/engineers shall not be anyway associated to the project concerned.
15.3They shall issue certificate regarding construction quality/structural safety norms as well as construction is going on or completed as per sanctioned drawing. Structural safety checklist shall be provided in Annexure-IX and construction quality checklist/testing shall be provided in Annexure-X

16. Accreditation and gradation of Architects/Engineers.

- 16.1 The accreditation of architects/engineers shall be done by the authority on the basis of their professional experience. The person concerned should have minimum experience of 5 years as registered architect/engineers/technical person in any ULBs/Authorities.
16.2The concerned person shall produce certificate of the required experience.
16.3The authority shall publish grading of professionals as on basis of their experience as follows:-
16.3.1Architect:-
Grade Minimum Experience Work Assigned
A 10 Yrs and above Any work
B More than 8 Yrs Up to 16.4 meter height
C Minimum 3Yrs Up to 10 meter height
16.3.2Engineer:-
Grade Minimum Experience Work Assigned
A 10 Yrs with PG and above Any work
B More than 8 Yrs Up to 16.4 meter height
C Minimum 3Yrs Up to 10 meter height
16.4They should not be blacklisted on any authority, they should have minimum qualification in as per Annexure-I.
16.5The authority shall issue the details procedure of accreditation of registered architect/engineers and technical personnel complying with rules and regulation.

17. Cancellation.

- 17.1 If any time after permission to proceed with any building or development work has been given, the Authority is satisfied that such permission was granted in consequence of any material misrepresentation or fraudulent statement contained in the application given or information furnished, the. Authority may cancel such permission and any work done thereafter shall be deemed to have been done without permission.

18. Completion of Construction.

- 18.1 The applicant/builder/owner/registered architect/registered engineer shall certify the completion of all building designed by Architect/Engineer. The responsibility of compliance with respect to provisions of these Bye-laws shall rest entirely on applicant/builder/owner
18.2For all buildings including mentioned in 18.1 above, the applicant will submit the notice of completion in Annexure-VI to the Authority that the building has been completed in all respects as per the approved plan and provision of the Bye-laws. The said notice shall be accompanied by the following documents:
18.2.1Three copies of as built building plans.
18.2.2A fee of Rs. 1000/-.
18.2.3Copy of approved plan and approval letter as or case may be approval letter.
18.2.4Certificate of installation of fire safety appliances by the nominated authority/agency wherever applicable.
18.2.5Evidence to the effect of all public utility services, and in particular, sewerage, drainage, water supply, and electricity have been linked to the main public utility system.
18.2.6A certificate obtained from concern structural Engineer certifying the structural safety and stability of the building.
18.2.7A certificate from concern architect that the building has been constructed as per the provision of these bye-laws.
18.3The deviations, if any, shall also be brought to the notice of the Authority (with relevant documents)
18.4The team of officials shall visit the site within 15 days after receiving of Completion Certificate in proper manner and occupancy certificate shall be given. The team will verify the following facts
18.4.1Number of floors
18.4.2Building height
18.4.3External Setbacks
18.4.4Building Line, if any
18.4.5Parking space provision
18.4.6Abutting road width
18.4.7FAR
18.4.8Coverage percentage
18.4.9Tree Cover
18.4.10Water harvesting structures
18.4.11Land if required to be surrendered.
18.4.12Lifts, water pumps and storage tanks,
18.4.13Internal roads/paving
18.4.14Parking areas and external lighting
18.4.15Lightening arrestors
18.4.16Fire Fighting installations
18.4.17Lifts
18.4.18Water pump
18.4.19Drainage and arrangement for waste water and sewerage disposal
18.4.20Copy of agreement with the apartment Owner's Association/Society if any.
18.4.21The team shall record and report to the Authority the deviations made from the approved plan.
18.5Implementation of Life Safety provisions as mentioned in National Building Code 2005 (Group-I Part-W Fire and Life Safety-4) shall be complied and NOC from Fire Service Department obtained where ever applicable.
18.6Quality checklist for building works shall be provided as per Annexure-X.

19. Certificate for occupancy.

- 19.1 The Authority shall issue a certificate for occupancy for all category of buildings, or for part of a building during its construction, or whole of the building after construction in Performa as Annexed as Annexure VII or refuse occupancy, as the case may be, within 30 days from the date of application.
19.2If the Occupancy Certificate is not issued within time limit mentioned above, the applicant shall submit an application with an affidavit that the construction is strictly as per the approved plans and no dues in development charges or any other form of payment to be made to the Authority are pending and all the conditions for issuing of occupancy permission are complied with.In case of non-disposal of such application within 15 days, it will be deemed to have been granted. In case of any false statement the applicant shall be liable for punishment under the provisions of these Bye Laws and other suitable legal action.
19.3Temporary occupancy-upon the request of the applicant the Authority may issue a temporary occupancy certificate of occupancy for a building or a part thereof before the entire work covered by the building permit has been completed, provided such portion or portions may be occupied safely prior to full completion of building without endangering life or public welfare.
19.4The refusal for granting occupancy certificate shall be a speaking order clearly mentioning the reason for refusal.
19.5Before issuing occupancy certificate, the competent authority shall verify that the building complies with the provisions of life safety as mentioned in National Building Code 2005(Group-1 Part-IV Fire and Life Safety-4) and barrier free accessibility wherever applicable.
19.6The department/line agencies dealing with electric power, water supply, drainage and sewerage shall not give connections to building unless such occupancy certificate is produced. Any violation by the department/Authority/Agencies in this regard shall be treated as an offence under the Jharkhand Municipal Act, 2011 and all relevant Acts. However a temporary connection of water supply and electricity for the purposes of construction can be given after the approval of the Building Plan.
19.7The occupancy/certificate shall also state the use/type of occupancy of the building. However, the applicant may apply for change of use/occupancy permitted within the purview of the Development Plan/Zonal Plan/Zoning Regulations, where so required.
19.8In case of multi-storied building and other special building like educational, assembly, institutional, industrial, storage and hazardous and mixed occupancies periodic inspection shall be made by the authority. along with technically competent authorized personnel once in five years or less to ensure the fire safety provisions of the building are in proper order and the building complies with the provision of fire and life safety requirements (Tire and Life Safety', Part-4 of NBC).ln case the building fails to comply with requirement of fire safety and barrier free accessibility, the building shall be declared unsafe.
19.9All occupied buildings and buildings covered under sub-bye law (4) above shall also be subject to periodic joint physical inspection by a team of multi-disciplinary professionals of the Authority. This work may be out sourced by the Authority as may be deemed necessary. The team shall report compliance of bye-laws, natural lighting, and ventilation, lift besides structural and electrical safety. If any short comings/deficiencies or violations are noticed during inspection, the occupants shall ensure the compliance of the same within a specified time frame of six months. If not complied with, the building shall be declared unsafe. The period of inspection shall be once in five years.
19.10An appeal against the decision of the Authority shall lie with the respective Tribunal under the relevant Act.
19.11Grade A Accredited architect may also issue occupancy certificate after being fully satisfied regarding compliance of all provisions of Building Bye-law and others related. Acts
19.12In case of all the deviations which are within the condonable limits, a temporary conditional certificate of occupancy may be granted by the Authority.

20. Construction not according to plan.

- 20.1 If the Authority finds at any stage that the construction is not being carried out according to the sanctioned plan or is in violation of any of the provisions of these bye laws, it shall notify the owner giving details of deviation and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. In case the deviation is within condonable limits, the construction shall not be stopped.
20.2If the owner fails to comply with the requirements at any stage of construction, the Authority may cancel the building permission issued and shall cause notice of such cancellation to be pasted upon the said construction. If the owner is not traceable at the address given in the notice, pasting of such notice on the premises shall be considered as sufficient notification of cancellation to the owner thereof no further work shall be undertaken or permitted upon such construction until a valid building permission is issued thereafter.
20.3The notification under sub-bye law (20.2) shall also be published in as public notice and also on the Website.
20.4The above-mentioned procedure shall also be followed in case of deviation of the layout.
20.5An appeal against an order under sub-bye law (20.2) above shall lie with the tribunal established under Municipal Act or any other tribunal as notified by the department.

21. Single Window Clearance.

- 21.1 The Planning Authority/Authority shall set up a Single Window Clearance system to process all the NOCs and grant permissions. There shall be a Website through which all the applications/documents/forms shall be filed online. The stages of approval/refusal shall also be communicated through the website.
21.2Every applicant seeking NOC and permission unless exempted under these Bye Laws shall apply in the Combined Application form through website.
21.3The Combined Application form duly filled in together with fees to be paid under these Bye Laws shall be submitted in required number of copies along with relevant enclosures, certificates, fees receipts and attachments in the Single Window Cell in the office of the Authority.
21.4All applicants shall furnish the form of self certification and also a certificate by Competent Technical Person along with the application at the time of submission of application forms;
21.5There shall be a check list appended to the combined application forms which shall be completed and signed by the applicant and scrutinized and accepted by the authorized representative of Single Window Cell in the office of the Competent Authority before issuing the acknowledgment;
21.6Before issuing the acknowledgement. the authorized representative of the Single Window Cell in the office of the Authority, shall satisfy that the application is complete in all respect;
21.7The relevant parts of the common application form shall be served on the respective authorities within three working days from the date of issuing the acknowledgment;
21.8The respective authority shall process the application and communicate the decision to the Nodal Authority within further 10 working days;
21.9In case of rejections of clearances or approvals with modification by the respective authority, the Nodal Authority shall examine the issues involved, may ask the applicant for such modifications as required by the respective authority for further consideration;

22. Construction near important buildings.

- 22.1 The Authority shall take rational view in sanctioning plan near important building like Governor's House. High Court. Heritage building etc.

23. Construction near river front.

- 23.1 No construction or re-construction of any building, within a river boundary, or such other higher distance as may be prescribed from time to time by the State Government, from the outer boundary of the river of Ganges (as prescribed by the Irrigation Department), shall be permitted except for repair and renovation work of heritage buildings.
23.2In case of rivers other than the Ganges, no construction or reconstruction of any building shall be allowed,' within a strip of land of 10-15 metres (where area is open and not develop 15m. up to), or such distances as prescribed by the State Government, from the outer boundary of the riverfront of any river (as prescribed by the Irrigation Department). The State Government shall notify a list of such rivers.
23.3No construction shall be allowed within the boundary of the river.
23.4Notwithstanding the above provision, any Planning Authority or Government Body shall be able to undertake development and beautification work of riverfront, ghats or any other planned development on reclaimed lands with the approval of the Government.

24. Unsafe building.

- 24.1 All unsafe buildings shall be considered to constitute danger to public safety and shall be restored by repairs or demolished or dealt with otherwise as directed by the Authority.
24.2The Authority shall examine or cause to be examined every building reported to be unsafe or damaged and shall make a written record of such examination.
24.3Whenever the Authority finds any building or portion thereof to be unsafe, it shall in accordance with established procedure for legal notice, give to the owner or occupier of such building written notices stating the defects thereof this notice shall require the owner or the occupier within a stated time either to complete specified repairs or improvements or to demolish, and remove the building or portion thereof as per provision of Act.
24.4The Authority may recording the reasons thereof directing in writing that the building which in its opinion is dangerous, or has no provision for exit in the event of fire, shall be vacated immediately or within the period specified for the purpose.
24.5If any person does not comply with the orders of vacating a building, the Authority may with the help of police remove the person from the building.
24.6In case the owner or occupier fails, neglects or refuses to comply with the notice to repair or to demolish the said building or portion thereof, the Authority shall cause the danger to be removed either by demolition or repair of the building or portion thereof or otherwise.
24.7In case of emergency, which, in the opinion of the Authority involves imminent danger to human life or health, the decision of the Authority shall be final. The Authority shall forthwith or with such notice as may be possible promptly cause such building or portion thereof to be rendered safe by retrofitting/strengthening to the degree of safety or removed. For this purpose, the Authority may at once enter such structure or land on which it stands, or abutting land or structure, with such assistance and at such cost as may be deemed necessary. The Authority may also get the adjacent structures vacated and protect the public by appropriate fencing or such other means as may be necessary.
24.8Costs incurred under sub-bye laws (6) & (7) shall be charged to the owner of the premises involved. Such cost shall be charged on the premises in respect of which or for the benefit of which the same have been incurred and shall be recoverable as provided under law.

25. Demolition of building.

- 25.1 Before a building is demolished & the owner shall notify all utilities having service connections within the building, such as water, electricity, gas, sewer and other connections. A permit to demolish a building shall not be issued until a release is obtained from the utilities departments stating that their respective service connections and appurtenant equipment, such as meters and regulators have been removed or sealed and plugged in a safe manner.
25.2The owner shall take all precautionary measures to avoid noise and dust pollution and shall not create any inconvenience to the neighboring plot owners.

26. Responsibility and Duty of the Applicant/Builder/Owner.

- 26.1 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the, building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of these bye laws.
26.2Every Applicant/Builder/Owner shall:
26.2.1Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for purpose of enforcing the bye laws;
26.2.2Obtain, where applicable, from the competent Authority permissions/clearance required in connection with the proposed work;
26.2.3Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part.

27. Responsibility of Authority.

- 27.1 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from the responsibilities imposed under these bye laws, or under any other law for the time being in force.
27.2Approval of plan would mean granting of permission to construct under these bye laws only and shall not mean among other things:
27.2.1The title over the land or building;
27.2.2Easement rights;
27.2.3Variation in area from recorded area of a plot or a building.
27.2.4Quality of building services and amenities in the construction of the building,
27.2.5The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc.
27.2.6Other requirements or licenses or clearances required for the site/premises or activity under various other laws.
27.3The approval or permission shall not bind or render the Authority liable in any way with regard to the matter specified in sub-Bye laws 27.1 to 27.2 above.
27.4Maintenance of Register:- A register in Form-XII containing the necessary particulars including information as to the manner in which applications for permission have been dealt with by the Authority shall be maintained.Chapter - III Land Use Classification and Permissible Uses

28. Zoning.

- 28.1 In the Planning area or areas where various use zones, residential, commercial, industrial, administrative, institutional, open space uses, transport & communication, green belt, natural drainage channel and water bodies having their zonal boundaries have been indicated, they shall be regulated as per the Table 4. Except as otherwise provided no structure or land hereinafter shall be used and no structure shall be erected, re-erected or altered unless its use is in conformity with these bye laws.
28.2For all non-confirming land use, no expansion shall be permitted. At the time of redevelopment, stipulated zoning regulations shall be followed.

29. Different use of land.

- 29.1 Permission for different uses shall be accorded outright for principal use earmarked in the different zones described in column (2) of table No 4.
29.2Permission for different uses described in column-3 of the Table-4 shall be permitted on special consideration and approval of Authority and reasons for such consideration shall be recorded in writing.
29.3The purposes specified in column (4) of the said Table shall not be permitted in the areas reserved for particular uses.
29.4Residential buildings and others buildings may be permitted in the Urban Agriculture use zone if the following conditions are satisfied along with other conditions of these bye laws:
29.4.1The land is not a leasehold land;
29.4.2The coverage is not more than 20%;
29.4.2The height is not more than 7.0 (seven) meters; and at least 60% of land is used for plantation/agriculture;
29.5Projects of planned Township Development or Group Housing may be allowed in Urban Agriculture Zone by the authority. Such type of permission shall be accorded by the Authority with the approval of the Urban Development and Housing Department, Jharkhand.
29.6Mixed land use may he permitted in a particular zone on approval by Authority. However, the main use shall cover not less than 2/3"I of the total floor area and the ancillary use shall not exceed I/3rd of the total floor area.
29.7Appeals with respect to the above provisions shall lie with the tribunal.
29.8In case of Government and Government Sponsored projects, the Urban Development and Housing Department may relax the land use criteria mentioned in table 4.
29.9Where Development Plan/Master Plan has not been finalized for any Authority, guidelines for classification of land use shall be issued by Urban Development and Housing Department on the basis of proposal submission by the Authority. This shall be mandatory after enforcement of this Bye-laws.Table 4; Land use permitted/prohibited in different use zones
Sl. Land Uses Use Zones in which permitted
R C I P T G E CUI CUII A
1. Airport, Helipad, Flying Club                
2. Art gallery, museum, exhibition centre          
3. Auto Supply store and show room for motorvehicle and machinery            
4. Automobile service and repairing station                
5. Bank and Safe deposit vault      
6. Bird Sanctuary                
7. Boarding or lodging house          
8. Botanical garden                  
9. Bus Depot            
10. Bus Terminal                
11. Canteen and eating house serving the industries                
12. Cemetery, crematorium, burial ground, electriccrematorium                
13. Children Traffic Park                
14. Cinema          
15. Clinic for pets        
16. Clinical Laboratory          
17. Club house not conducted primarily as business        
18. Club house or other recreational activesconducted as business              
19. Cold storage and ice factory                
20. College              
21. Commercial/business Offices            
22. Commercial hall & welfare center,        
23. Contractor plant and storage for buildingmaterial                
24. Convenience Shopping Center      
25. Convention Center            
26. Cottage, Handloom and Household Industries          
27. Court              
28. Creche and Day Care Center        
29. Cultural and information Center            
30. Customary home occupation            
31. Defence      
32. Dairy and poultry industry                
33. Dispensary        
34. Dry Cleaners-cleaning and dyeing            
35. Educational and research Institution        
36. Electric Sub-station  
37. Existing Village
38. Fair Ground              
39. Film studio                  
40. Fish curing              
41. Flatted Group Industry            
42. Flood control work
43. Forensic Science Laboratory            
44. Forest              
45. Gas Godown          
46. General Industries                
47. Golf course                  
48. Green house        
49. Gymnasium        
50. Health Centre        
51. Hospital        
52. Hostels for educational institution          
53. Hotel            
54. Indoor Games Hall      
55. Jail                  
56. Junk yard                  
57. Local, Municipal, State or Central Governmentoffice      
58. Mechanical workshop with lathes, drills,grinders, spot welding set                
59. Medical, eye and dental practitioners' clinic        
60. Monument
61. Motor Driving Training Center          
62. Municipal facility (as listed inedia Annex VII)      
63. Music, dance, drama training centre          
64. Neighbourhood Shopping Centre-convenience andlocal shopping with vegetables, fruits, flowers, fish and meat.            
65. Night Shelter      
66. Nursery, Horticulture and Orchards  
67. Nursing Home        
68. Oil Depot              
69. Open Air Theatre      
70. Orphanage          
71. Park, play ground, playfield and recreationalarea      
72. Personal Service Shop      
73. Petrol filling station      
74. Photograph studio and laboratory        
75. Piggery                
76. Planetarium          
77. Police Headquarter and Police Lines                  
78. Police Station, Out Post and Fire Station      
79. Post office, Telephone Exchange, TelegraphOffices      
80. Professional office of a resident of the premise            
81. Public library        
82. Radio broadcasting studio              
83. Railway Station              
84. Reformatory(Juvenile Home)              
85. Refinery                  
86. Religious Place like temple, Namghar, SameSathal, mosque, church etc        
87. Research and Development Centre              
88. Residence cum Work Plot            
89. Residential Dwelling          
90. Residential Plot- Plotted Housing            
91. Restaurant, cafeteria, milk bar    
92. Retail Shop      
93. Satellite and Telecommunication Center              
94. Schools          
95. Service Centre        
96. Sewerage treatment plant              
97. Social, cultural and religious institution          
98. Specialised Park/Ground          
99. Sports Training Center            
100. Stadium                  
101. Storage of petroleum and other inflammablematerials                
102. Storage, Warehouses and Godown            
103. Swimming Pool        
104. Taxi stand and bus stand, cycle and rickshawstand    
105. Theatre, assembly or concert hall, dance andmusic hall and such other place of entertainment;          
106. Truck terminal                
107. Vending Booth    
108. Vocational Training/Technical Training Institute        
109. Watchmen or caretaker's lodges    
110. Water Treatment Plant    
111. Weekly Market/informal Sector Unit        
112. Wholesale Trade                  
113. Wireless transmitting and weather station,Transmission Tower              
114. Zoological park                  
Index of Use Zones:R - ResidentialC - CommercialI - IndustrialP - Public & Semi PublicT - TransportationG - Green Belt (Recreational and Open Space)E - Eco-sensitiveCU I - Composite Use ICU II -Composite Use IIA - Agricultural UseNote:
1 All Existing nonnuisance, non-polluting uses to continue in the following usezones:- Residential- Commercial- Industrial- Public/Semi-public- Transportation andCommunication- Composite Use I- Composite Use IIAll existing nonnuisance, non-polluting uses may be allowed to continue/discontinue after an application for special permission to theAuthority in the following use zones:- Recreational- Eco-sensitive-Agricultural
2 To be permitted in commercial areas to beindicated in Industrial Use Zones in Local Area Plans/LayoutPlans
3 In Residential use zone, existing uses tocontinue and new ones to come on special permission from theauthority. Refer Annexure - 13.1
4 In the New Development proposed RecreationalArea
5 Only Existing uses to continue
6 Only those industries as listed in Annexure -13.1
7 Permitted only in Heavy Industrial Zone
8 Existing locations to continue
9 Permitted only in Heavy Industrial Zone
10 Permitted only in Heavy Industrial Zone
11 In commercial centers
12 In industrial areas
13 The provision of table 4 shall also beapplicable for village settlement as defined in Master Plan.
Chapter - IV General Requirements

30. Restriction on permission.

- Without prejudice to any other stipulation in these bye laws, no permission to construct a building on a site shall be granted:
30.1In areas of natural waterways or drains, as detailed in the Development Plan, and drainage plan as modified from time to time;
30.2If the use to which the site is proposed to be put does not conform to the use earmarked in the Development Plan/Master Plan/Zonal Development Plan;
30.3If the building is to be constructed over or under a municipal drain, sewerage line, electrical line, water main, any other government or public land, or public utility services;
30.4As Jharkhand is located in Seismic Zone IL III and IV if the Structural Plans are not prepared taking this into account.
30.5In case of areas which get flooded, the Structural Plans are not prepared taking this into account.

31. Requirement of Site.

- 31.1 No building shall be constructed on any site on any part of which there is deposited refuse, excreta or other offensive matter objectionable to the Authority. Until such refuse has been removed there from and the site has been prepared or left in a manner suitable for building purposes to the satisfaction of the Authority;
31.2Wherever the dampness of a site or the nature of the soil renders such precautions necessary, the ground surface of the site between the walls of any building erected thereon shall be rendered damp-proof to the satisfaction of the Authority;
31.3Any land, passage or other area within the cartilage of a building shall, if the Authority so requires, be effectively drained by surface water drains or other means;
31.4If the foundation of the external wall along a Street is located at a distance less than one meters from the edge of the street or road margin including the drain;The written approval of the Authority shall be obtained for connecting any sub-soil or surface water drain to a sewer;

32. Distance from Electric lines.

- No verandah, balcony or the like shall be allowed to be erected or re-erected or any additions or alterations made to a building, within the distances 'quoted below between the building and any overhead electric supply line. The minimum distance from the electric line shall be as per Table 5.Table - 5: Minimum distance from electric line
  Vertical distance in meters Horizontal distance in meters
Low and medium voltage lines and service lines 2.5 2.5
High voltage lines up to and including 11.000Volt Not Permitted 3.7
High voltage lines above 11.000 volt and up toand including 33,000 Volt Not Permitted 3.7
Extra high voltage line beyond 33.000 Volt Not Permitted 3.7 (Plus 0.3 meters for every additional 33,000volts or part thereof)

33. Plantation.

- 33.1 In every building area, at least 5% of the land shall be covered by plantation (tree cover), but in case of multi-storied buildings/Group Housing/Apartment building/Industrial/Assembly/Educational/Institutional buildings, it is desirable that at least 10% of the land shall be covered by plantation (tree cover). Internal gardens within the building shall be encouraged.

34. Means of Access.

- 34.1 Every plot shall abut on a public/private means of access like streets/roads of duly formed of width as specified in these byelaws or specified in the Master Plan/Development/Zonal Plan/Scheme.The minimum width of the road/street required for access to a new building in an existing colony not developed by any authorized agency such as Regional Development Authority. Municipality, Housing Board, Co-operative societies, Government and Semi government organization shall be as per Table 6.Table 6; Length of road limitation
Old Area
SI. No. Maximum Length of the road in Meter Minimum width of road of street in Meter
(i) (ii) (iii)
1 Upto 50 meter 3.6 meter
2 Exceeding 50 meter and upto 100 meter 5.1 meter
3 Exceeding 100 up to 300 meter 6.6 meter
4 Exceeding 300 meter 7.5 meter
Note-On lessthan 6.1 m. wide roads the encroachment from both sides will beremoved by measuring 3.05 m. from the centre line of the width ofroads declared by or belonging to Road Construction DepartmentJharkhand. Municipal Authorities, Housing Board, CooperativeSocieties, Government and Semi-Government Organizations In othercases maximum 3.05 m. land from such revenue plot on either sidewill be taken into account to make it 6.1 m. wide road and theconstruction falling in between the said width of road will beremoved as an encroachment.Similarly 1.80 m. and 2.55 m. land from eachRevenue plot on either side will be taken into account to make it3.1 m. and 5.1 m. wide road correspondingly
New Area (Residential)
SI. No. Maximum Length of the road in Meter Minimum width of road of street in Meter
1 Up to 100 6.10
2 More than 100 to 250 7.5
3 More than 250 to 500 9.10
4 Murc than 500 tv 1000 12.20
5 More than 1000 15.30
Note- If the developments only on oneside of the means of access, the prescribed widths maybe reducedby 1.0 meter each case. In no case, development on plots shall bepermitted unless it is accessible by a public street of width notless than 6 m.
New Area (Non residential)
Sl. No. Maximum Length of the road in Meter Minimum width of road of street in Meter
1 200 7.5
2 400 9.1
3 600 12.2
4 above 600 15.30
Further, in no case the means of access shall be lesser in width than the internal access ways in layouts and subdivision.
34.2No building construction activity of height more than 8 in. shall happen on a road with a width of less than 3.6 m. (Including Road Widening) in old area.
34.3For roads of width 18.30 (60 ft.) and above there shall be no restriction on height and number of floors. However it may be regulated by the Master Plan/Development Plan/Zonal Plan.
34.4Unless and otherwise specified, development of plots shall, not be permitted unless it is accessible by a public/private street with the width specified in these bye laws. The width of the road may be increased in a master plan/development plan/zonal plan but under no circumstance the provisions for width of road shall be less than the provisions made under these bye laws.
34.5In case of institutional, administrative, assembly, industrial and other non residential and commercial activities, the minimum road width shall be 9.0 meters.
34.6In case public land is not available for the road, all the plot owners on both sides of the road shall equally surrender their right over the land to the authority to accommodate the road width. The centre line of the road shall be taken as reference for such surrenders.
34.7In case of a private road, which gives access to one or more buildings, the owner of the said private road shall develop the road and storm water drain as required by the Authority, and transfer the same to the Registered Residents' Welfare Association for maintenance.
34.8Access from highways/important Roads-No premises other than, highway amenities like petrol pumps, motels, etc, shall have an access direct from highways and other roads designated by the Road Construction Department. The Road Construction Department shall notify a list of road, which shall not provide direct access to a specified class of buildings. The Authority shall maintain a register of such roads, which shall be open to public inspection at all times during office hours and published on the web site. These provisions shall, however, be subject to the provisions of the relevant State Highway Act, and National Highway Act.
34.9The provisions of road width shall be strictly enforced. There shall be no construction over the prescribed road width. Any violation shall be treated as an offence under the Jharkhand Municipal Act-2011 in addition to provision for removal of illegal encroachment under the relevant Acts.
34.10Strict steps shall be taken to remove any illegal encroachment which may have resulted in reduction of any road width. the personnel responsible for such illegal encroachment shall be severely dealt with and prosecuted as per law.

35. Minimum size of plots and road width.

- 35.1 The minimum size of plots and road width for different categories of building is given in Table 7.Table - 7: Category wise size of plots
Category Min. road width (m) Min. size of plot in Sqm.
Marriage Halls 12.20 1000
Cinema, Multiplex, Shopping Malls, Conventioncenters, Game centers. 18.30 2000
Social clubs and amenities 12.20 1000
Multi storey car parking 12.20 1000
Office buildings 12.20 300
Primary/Upper Primary school 09.00 2000
I figh School, Residential School 12.20 6000
+2 College/Junior College 12.20 4000
Degree College 12.20 6000
Technical educational institution 12.20 10000
Petrol Pumps/Fill ing stations 12.20 500
Restaurant 12.20 500
LPG storages 12.20 500
Places of congregation 12.20 500
Public libraries 12.20 300
Conference hall 12.20 1000
Community hall 12.20 500
Nursing homes/polyclinics/Hospital 12.20 300
Hotel (below three star) 12.20 1000
Hotel (three star and above) 18.30 2000
R&D Lab 18.30 1500
Group Housing 6.10 3000
Note:- (1) In exceptional cases the Authority may consider revising the minimum size of plot with the approval of the Government.
(2)The above (requirement) area of minimum size of the plot may be relaxed by 5% while sanctioning the plan.
(3)No high rise building (building with a height above 16.4 meters) shall be allowed on a plot size less than 1000 sqm.
(4)Minimum existing road width for building more than 13.3 m in height shall be not less than 6.1 m.
(5)For all plots abutting a road less than 12.2m width for proposed to he used for Primary/Upper Primary School a lay-by of paved area contiguous to the road for turning of vehicles and fire engines should be left. This lay-by should be of minimum dimension of 9m x 9m.

36. Minimum setbacks & Height for non-high rise buildings.

(1)The minimum setbacks and height of buildings permissible in a given size/plot for residential in non high rising category shall be as per Table 8 and 9. The minimum setback for commercial and mercantile buildings shall be as per Table 10 and II.Table - 8: Minimum Front and Rear setbacks and height of residential buildings
Sl. Average Depth of plot (In meters) Building Height Upto G+2 Maximum-10m Building Height Upto G+3 Maximum-13.3m Building Height Upto G+4 Maximum-16.4m
Minimum Front set back (m) Minimum Rear set back (m) Minimum Front set back (m) Minimum Rear set back (m) Minimum Front set back (m) Minimum Rear set back (m)
(i) (ii) (iii) (iv) (v) (vi) (vii) (viii)
1 Upto 10m 1.5 0.90 No construction shall be permitted No construction shall be permitted
2 Exceeding 10m & upto 15m 2.0 1.5 3.0 1.5 No construction shall be permitted
3 Exceeding 15m & upto 21m 2.5 1.5 3.0 1.8 3.0 3.0
4 Exceeding 21m & upto 27m 3.0 1.8 3.0 2.0 3.5 3.0
5 Exceeding 27m & upto 33m 4.0 2.5 4.0 3.0 4.0 3.5
6 Exceeding 33m & upto 39m 4.0 3.0 4.5 4.0 4.5 4.0
7 Exceeding 39m & upto 45m 4.0 4.0 4.5 4.0 5.0 4.5
8 More the 45m 4.0 4.0 5.0 5.0 6.0 5.0
Table 9. Minimum Side setbacks for residential buildings
Sl. Average Width of plot (in meters) Building Height Upto G+2 Maxmimum-10m Building Height G+3 Upto Maxmimum-13.3m Building Height Upto G+4 Maximum-16.4m
(i) (ii) (iii) (iv) (v) (vi) (vii) (viii)
1 Upto 10m At least one side from 0.90 m. No construction shall be permitted No construction shall be permitted
2 Exceeding 10m & upto 15m 0.90 0.90 0.90 0.90 No construction shall be permitted
3 Exceeding 15m & upto 21m 1.0 1.0 1.5 1.5 2.0 2.0
4 Exceeding 21 m & upto 27m 1.5 1.5 2.0 2.0 2.5 2.5
5 Exceeding 27m & upto 33m 1.5 1.5 2.5 2.5 3.0 3.0
6 Exceeding 33m & upto 39m 2.0 2.0 3.0 3.0 3.66 3.66
7 Exceeding 39m & upto 45m 3.0 3.0 3.66 3.66 4.50 4.50
8 More the 45m 3.66 3.66 4.00 4.00 5.00 5.00
Table 10. Minimum front and rear setback for commercial/mercantile buildings
Sl. Average Depth of plot (In meters) Building Height up to 16.4 m
Minimum Front set back (m) Minimum Rear set back (m)
(i) (ii) (iii) (iv)
1 Upto 10m No construction is allowed
2 Exceeding 10m & upto 15m 4.5 3.0
3 Exceeding 15m & upto 21m 5.5 4.0
4 Exceeding 2Im & upto 27m 6.0 4.0
5 Exceeding 27m & upto 33m 6.5 4.0
6 Exceeding 33m & upto 39m 7.0 4.5
7 Exceeding 39m & upto 45m 7.5 4.5
8 More than 45m 8.0 5.0
Table 11. Minimum side setbacks for commercial/mercantile buildings
Sl. Average width of plot (In meters) Building Hei ht up to16.4m
Minimum Left set back (m) Minimum Right set back (m)
(i) (ii) (iii) (iv)
1 Upto 10m At least one side 1.5 m.
2 Exceeding 10m & upto 15m 2.0 2.0
3 Exceeding 15m & upto 2Im 2.5 2.5
4 Exceeding 21m & upto 27m 3.0 3.0
5 Exceeding 27m & upto 33m 4.0 4.0
6 Exceeding 33m & upto 39m 4.0 4.0
7 Exceeding 39m & upto 45m 5.0 5.0
8 More than 45m 5.5 5.5
Table 12. Open spaces around industrial buildings
Sl. Plot Size Minimum Front set back (m) Minimum Rear set back (m) Minimum Sides set back (m)
(i) (ii) (iii) (iv) (v)
1 550 sqm to 1000 sqm 9.0 4.5 4.5
2 1000 sqm to 5000 sqm 10.0 6.0 6.0
3 5000 sqm to 30000 sqm 12.0 9.0 9.0
4 Above 30000 sqm 15.0 12.0 10.0
Table 13. Minimum set back for industrial building constructed over plot size upto 550 sqm.
Sl. Width of Plot Minimum Front set back (m) Minimum Rear set back (m) Minimum Sides set back (m)
(i) (ii) (iii) (iv) (v)
1 Upto 10 mtrs. 3.0 3.0 1.5
2 Exceeding 10m & upto 12m 4.0 3.0 2.0
3 Exceeding 12m & upto 15m 5.0 3.0 3.0
4 Exceeding 15m & upto 18m 6.0 4.0 4.0
5 Exceeding 18m 6.0 4.5 4.5

37. Minimum setbacks for high rise buildings.

(1)For high-rise/multi-storied buildings, the open spaces around the building unless or otherwise specified shall be as given in the Table 14.Table -14: Minimum exterior open spaces around the buildings for all type of high rise buildings unless otherwise specified
Sl. Height of the Building Upto (m) Exterior open spaces to be left out on allsides in m.
Front setback Side and Rear setback
1 More than 16.4 and upto 19.25m 6.5 4.5
2 More than 19.25m and upto 23.10m 7.5 4.5
3 More than 23.10m and upto 30m 8.0 5.0
4 In case of buildings of more than 30m height, forevery increase in height of 3.35m. or fraction thereof oraddition of one floor, 1m. in the front set back and 0.75 m. inthe sides and rear setbacks shall be added.
Note:- (1) In no case the minimum setbacks shall be less than those specified in sub-section 42.1 of these Bye Law for high rise buildings in the mentioned category.
(2)In case of multi storied buildings the exterior open space around a building shall be of hard surface capable of taking load of fire, engine weighting up to 45 tones.
Coverage of Building Maximum ground coverage
1. Up to 235 sqm. of plot and building ht. notexceeding 10m. -70%
2. Up to 1000 sqm. of plot and building ht. upto 16.4m. -60%
3. Above 1000 sqm. of plot area or building ht.of more than 16.4m. -50%
4. For commercial uses ground coverage is 50% ofthe plot area.

38. General Conditions for Setback.

- 38.1 In case of more than one block of buildings are constructed on the same the plot, the minimum distance between the two blocks shall be 6in. (Six meter) or 1.5 times side setback required for the taller block whichever is higher. Basement can be constructed in this open area in between the buildings, top of which may be used as passage and garden and if used for vehicular passage the roof slab should have sufficient strength for the fire of engine 45 tones.
38.2The minimum setbacks/open spaces for other occupancies shall be as below;
38.2.1Educational buildings - In case of educational buildings the open spaces around the building shall not be less than 6 meter. The front set back shall be not less than 9 m.
38.2.2Institutional buildings-The open spaces around the building shall not be less than 6 m. The front setback shall be not less than of 9m.
38.2.3Assembly buildings- The open space in front shall be not less than 12m and the other open spaces around the building shall not be less than 6m.
38.2.4Malls and Multiplex- The front set back shall not be less than 12 m, the rear set back shall not be less than 7 m and the side set back shall not be less than 7m.
38.2.5Commercial & Storage buildings - In case of plots with more than 1000 sqm. area, the open spaces around the building shall not be less than 6.0 in. The front setback shall be of 9m. In all other cases it shall be as per Table 10. and table 14
38.2.6Industrial buildings - The setbacks shall be as per Table 12 and 13.
38.2.7Hazardous occupancies -The open spaces around the building shall not be less than 9 m. The front set back shall be of 12m.
38.2.8Slum Improvement- The setback norms shall not apply to slums taken up under an approved programme of the Government subject to the specific sanction of the Government.
38.2.9IT/ITES Buildings-Abutting a means of access of 12 m or more the setback, height, number of floors and FAR shall be applicable as per commercial building in respect of corresponding road width.
38.3The setbacks shall be calculated on the basis of highest provision of setback mentioned either in the above table or mentioned in these Bye Laws.
38.4The setbacks are to be left after leaving the affected area of the plot/site, if any, for road widening.
38.5Where a site abuts more than one road, then the front setback should be towards the bigger road width or main approach road in case of equal widths. The side setbacks shall be as per the width of plot and rear set back as per the depth of plot.
38.5.1Road junction corner plots shall have sufficient weaving angle. In no case it shall be less than the space arrived at by drawing a quadrant of a circle of 4.5m radius at the edge of the actual road lines leaving the width of pedestrian walks (foot path) and the plot boundaries shall be rounded of by drawing a quadrant of the circle of 2.7m radius at the edge of plot boundaries.
38.5.2The height of the boundary wall shall be restricted to 0.75m for a length of 5m on the front and side of the intersections and the remaining height of 1.5m shall be made up of steel grill work.
38.6For narrow plots having extent not more than 400 sqm. and where the length is 4 times of the width of the plot, the setbacks on sides may be compensated in front and rear setbacks so as to ensure that the overall aggregate setbacks are maintained in the site, subject to maintaining a minimum of side setback of lm in case of buildings of height up to 10m. and minimum of 2m. in case of buildings of height up to 12 m. without exceeding overall permissible plinth area.
38.7The master plan/development plan/zonal plan shall also specify a building line for various areas. The setbacks shall accordingly be changed without reducing the minimum required setbacks under these bye laws.

39. Floor Area Ratio.

- 39.1 The Floor Area Ratio (F.A.R) for buildings shall be decided on the basis of the road width on which the plot/site abuts as per Table 15 and 16 and with upper limit for various ULBs as indicated in Annexure-III.Table 15: Road width and FAR table for (Old Area)
Category Road Width (in meter) FAR Floor Maximum Height (in meter) Conditions
Residential Non residential
0-I 3.60(12 ft.)to less than 4.80m 1.5 Nil C+2 10.0  
0-II 4.80 (16 ft.)to less than6.10m 1.8 Nil G+2 10.0
0-III 6.10 (20 11.) to less than 7.5m 2.0 2.0 G+4, S+4 16.4 Parking shall beallowed on any floor. Under no circumstances the parking floorsorprovision for parking shall be used for anyother purposes. Mezaninine floors or any floor partition shall becomputed under FAR and counted as a floor.
0-IV 7.5 (25 ft.)to less than 9.10m 2.5 2.5 G+5 S+5 19.25
0-V 9.10 (30 ft.)to less than 12.20m 2.5 2.5 G+6 S+6 23.10
0-VI 12.20 (40 ft.)to less than 18.30m 2.5 2.5 Maximum Height 30 meter
0-VII 18.30 (60 II) and above 2.5 3.00 No restriction on height and number of floorshowever it may be regulated by the master plan/developmentplan/zonal plan.
Note:- i) A plot abutting on less than 3.60 m. width road shall have only maximum 7m. height and maximum F.A.R - 1.2ii) In all cases the height of any building shall be not more than as prescribed in 40.1.1Table. 16: Road width and FAR table (New Area)
Category Road Width (in meter) FAR Floor Maximum Height (in meter) Conditions
Residential Non residential
N-I 6.10 (20 ft.) to less than 7.5m 2.0 2.0 G+4 S+4 16.4 Parking shall be allowed on any floor. Under nocircumstances the parking floors or provision for parking shallbe used for any other purposes. Mezzanine floors or any floorpartition shall be computed under FAR and counted as a floor.
N-II 7.5 (25 ft.)to less than 9.10m 2.5 2.5 G+4 S+4 19.25
N-III 9.10 (30 ft.)to less than 12.20m 2.5 2.5 S+5 23.10
N-IV 12.20 (40 ft.)to less than 18.30m 2.5 2.5 Maximum Height 30 meter
N-V 18.30 (60 ft) to less than 24.40m 2.5 3.0 Height restriction as per rule-39 and 40.1.1
N-VI 24.40 (80 ft.) and above 3.0 3.0
Note: In all cases the height of any building shall be not more than as prescribed in 40.1.1
39.2While sanctioning the plans on building with a road width of 3.6m (12 feet) and 4.8m. (16 feet) the Authority shall ensure that enough parking spaces for vehicles have been made within the building/plot and that the vehicles shall not parked on the road. Provisions related to length of the road in Table 6 shall be adhered to.
39.3In ease of Educational, Institutional and Assembly building the maximum permissible FAR shall be 2.0 for plots up to 1000 sq. m. and 2.25 for plots above 1000 sq. m.
39.4In case of transport related activities such as; railway yards, railway station, bus stands, bus shelters, transport depot, airport, special warehousing, cargo terminals etc. the maximum permissible FAR shall be 2.0,
39.5In case of Industrial buildings the maximum FAR shall be 1.5 for polluting and hazardous industries. In case of non-polluting and cottage industries the maximum FAR shall be 2.0
39.6The FAR and Height of the building may also be regulated by the master plan/development plan or the zonal plan.
39.7In case the plot is affected by a road widening or in the way to construct a new road/parks/any public utility and if the owner of the plot voluntarily surrenders the affected portion of his land to the Authority without any claim of compensation or through a. TDR (Transferable Development Right) scheme implemented by the Government the owner shall be entitled to build on the remaining plot, an area calculated on the basis of the FAR as applied to the total area prior to such surrender. Provided that the surrender of the land shall be affected by a deed of transfer to be executed by the owner in favour of the Authority for widening of road. The plot owner can use this T.D.R for any other new building project within the jurisdiction of the Competent Authority.
39.8Exclusive multi-storied parking blocks can be provided within the required setback area with ramp provision or Car Lift. If car lift is provided in place of ramp then it should be minimum of 02 (Two) nos., for first 500sqm. parking space requirement and additional 01 (One) for part thereof along with 02 (Two) separate wiring circuit. These car lifts shall have separate wiring circuit for each car lift and shall also be powered with backup generators of sufficient capacity.The placing of multi-storied parking blocks in this fashion should be without reducing the driveway for the fire tender to the extent of minimum of 6 meters. For incentive to the developer, this parking block area will not be included in the calculation of FAR.
39.9FAR shall not include
39.9.1Basements or cellars and space/floors under a building constructed on stilts and used only as a parking space, and air conditioning or other plant room which are to be used as accessory to the principal use of the building;
39.9.2Multi-storied Parking built as per NBC norms
39.9.3Electric cabin/panel room or substation, watchman booth of maximum size of 4sqm. with minimum width or diameter of 2m., pump house, garbage shaft/garbage bins, space required for location of fire hydrants, electric fittings and water tank, Service Ducts, society room of maximum 12 sqm., entrance lobby of maximum 12 sqm., common toilet of maximum 5sqm., guard room of maximum of 10 sq.m. with toilet for guards and drivers of maximum 5sqm.
39.9.4Projections and buildings accessories as specifically exempted from the open space/setback requirement.
39.9.5Staircase room and lift rooms above the topmost storey, architectural features, chimneys and elevated tanks. The area of the lift shaft shall be taken only on one floor.
39.9.6Fire escape staircases.
39.9.7Parking area on stilts in one or more floors
39.9.8Balconies/Terrace more than one story in height and open on minimum two sides.
39.10Additional FAR, as may be desired by the authority, be allowed for
39.10.1Government Buildings/Government Projects/Projects developed by any government agency with the prior approval of Urban Development and Housing Department.
39.10.2For other buildings as per provision in Annexure-III with the approval of Urban Development and Housing Department.

40. Height of a building.

- 40.1 The height of the building shall be governed by the limitations of Floor Area Ratio, open space (setbacks), and the width of the street facing the plot described as detailed below:40.1.1The maximum height of a building shall in no case exceed (1.5 times the width of the road on which the plot abuts) + Road widening + the front setback.40.1.2If a building abuts on two or more streets of different widths, the building shall be deemed to face upon the street that has the greater width and the height of the building shall be regulated by the width of that street.
40.2Not withstanding anything contained in sub-bye law the height restrictions with respect to approach Funnels and Transitional area of Airport as detailed in Table -17 and 18 shall be adhered to. Any height restrictions imposed by the Airport Authorities shall be adhered to.
40.3Not withstanding anything contained in the tables under sub-bye law, no Radio Aerial, T.V. Antenna, Cell phone tower or such similar type of installations exceeding 52m. in height shall be erected without prior permission of the concerned Civil Aviation Authority/Airport Authority.
40.4No building structure or installation exceeding the height indicated in the said Tables shall be permitted unless the applicant produces a 'No-Objection Certificate' from the Airport Authority.Table- 17 Height restriction with respect to approach funnels
Distance from nearest runway end (In metres) Maximum Permissible height above the elevation ofthe nearest runway end
Up to 360 0
631 to 510 6
511 to 660 9
661 to 810 12
811 to 960 15
961 to 1110 18
1111 to 1260 21
1261 to 1410 24
1411 to 1560 27
More than 1560 30
Table -18: Height restriction with respect to transitional area
Distance of the Inner Boundary of theTransitional Area (Outer Boundary of the Air Port) [Metres] Maximum Permissible height above the elevation ofthe airport reference point [metres]
Up to 21 0
22 to 42 3
43 to 63 6
64 to 84 9
85 to 105 12
106 to 126 15
127 to 147 18
148 to 168 21
169 to 189 24
190 to 210 27
More than 210 M 30

41. Off Street Parking Space.

- 41.1 In all buildings including Apartment buildings/Group Housing, Hotels, Restaurants and Lodges, business buildings, commercial buildings, Institutional buildings like hospitals, Educational buildings like schools and colleges, multi-storied buildings/complexes etc. and all other non-residential activities provision shall be made for parking spaces as per the require vents mentioned in table 19.Table 19: Parking space for different category of occupancies
Sl. Occupancy Type One Car Parking For Every or Fraction Thereof:(The Minimum Size of a Car Parking Stall Shall be 2.40mx 4.80m.,and Minimum Stall Length of 5.40m. For Parallel Parking, With aMinimum Driveway Width of 4.25 M.)
Population up to 50,000 Population up to 1,50,000 Population up to 10,00,000 Population 10,00,000 and above
1 Residential a)Multi-Familyb) Lodging establishment, tourist homes andhotels with lodging accommodation 1 apartment8 guest rooms 1 apartment6 guest rooms 1 apartment4 guest rooms I apartment of builtarea up to 140 sq. m. and 0.5 apartment of built area above 140sq.m3 guest rooms
2 Educational ( see Note 1) 150 sq.m of area of the administrative officearea and public service area 100 sq.m of area of the administrative officearea and public service area 70 sq.m of area of the administrative officearea and public service area 50 sq.m of area of the administrative officearea and public service area
3 institutional (Medical) 10 bed (Private) 15 beds (Public) 7 bed (Private) 12 beds (Public 5 bed (Private) 10 beds (Public 2 bed (Private) 5 beds (Public
4 Buildings for PublicGatheringa) Assembly halls, Cinema theatres and Auditoriab) Restaurants(Including Restaurants in Lodging establishment, tourist homesand hotels with lodging accommodation)c) Stadiad) exhibition centres 25 seats20 seats200 seats 15 seats20seats100 seats 10 seats10seats40 seats 10 seats10seats20 seats
5 Commercial a)Business offices and firms for private businessb) Public orsemi-public officesc) Mercantile (see note 3) 200 sq.m. of built uparea excluding parking and services areas300 sq.m. of built uparea excluding parking and services areas200 sq.m. of built up area excluding parking andservices areas 150 sq.m. of built uparea excluding parking and services areas200 sq.m. of built uparea excluding parking and services areas100 sq.m. of built up area excluding parking andservices areas 100 sq.m. of built uparea excluding parking and services areas100 sq.m. of built uparea excluding parking and services areas100 sq.m. of built up area excluding parking andservices areas 75 sq.m. of built uparea excluding parking and services areas75 sq.m. of built uparea excluding parking and services areas75 sq.m of built up area excluding parking andservices areas
d) Industriale) Storage 400 sq.m.600 sq.m. 300 sq.m.500 sq.m. 200 sq.m.400 sq.m. 100 sq.m.250 sq.m.
41.2Parking spaces may be provided in the following areas (The minimum width of driveways should not be less than 4.50
41.2.1In basements
41.2.2On stilt in one or more floors. (All structural precautions, like cross bracings, shall be taken in case of stilted areas for earth quack and lateral loads.)
41.2.3Parking in open areas or in setbacks with minimum driveway width of 4.50m.
41.2.4Exclusive multi-level parking
41.2.5Roof top parking in case of commercial/IT/ITES and corporate building
41.2.6A combination of any or all of the above.
Notes:-1. In case of Auditoria for institutional and educational buildings, additional parking spaces shall be provided as per 4 (a)

2. For other institutions, transport, communication center and occupancy types not mentioned above, parking requirements shall be decided by the authority.

3. For shops on plots up to 50 sq.m. parking space need not be insisted upon.

4. For all apartment/multi dwelling of residential buildings:

(a)Extra 15 % of the total car parking requirement should be reserved for visitors and should not be sold/settled. Such parking space shall be indicated by painting "Visitor's parking" on the floor.
(b)One number of two wheeler parking, of a minimum size of 1 m x 2 m. excluding the driveway, should be provided for every one apartment/dwelling unit

5. All non-residential buildings should provide one third area, out of the total car parking area, for parking of two wheelers. These two wheeler parking should have a minimum size of 1 m x 2 m. excluding the driveway. The minimum width of the drive way meant exclusively for 2 wheelers should be 3m.

6. In addition to the parking spaces provided for building of mercantile (commercial) Industrial and storage type, one space of 3.50X7.50 meters for loading and unloading activities, for each 2000 sqm. of total area (as per FAR calculation) or fraction thereof shall be provided

41.3Off-street parking spaces shall be provided with adequate vehicular access to a street and the area of drives, aisles and such other provisions required for adequate maneuvering of vehicles.
41.4If the total off-street parking space required under these bye laws is provided by a group of property owners at a place for their, mutual benefit, such parking spaces may be construed as meeting the off-street parking requirement, however, subject to the approval of the Authority. The Authority may also decide to develop such parking spaces and charge property owners to beer proportionate cost.
41.5Garage with locking facilities shall be included in the calculation of the requirement of parking spaces, but the same will be not be exempt from FAR calculation.
41.6Parking spaces may be provided in the set back area on the condition that the minimum drive way width of 4.5 m as required around a building under these bye laws is ensured These parking spaces can be covered by temporary roofing and will not be counted in FAR but subject to realization of fees as built area.
41.7Misuse of the area specified for parking of vehicles for any other use shall be summarily removed/demolished by the Authority. The expenses incurred in this regard shall be chargeable upon such defaulter. The Authority shall not be responsible for any damage caused to the structure, property or adjacent structures during such removal/demolition.
41.8For parking spaces in basements and upper storey of parking floors, at least two ramps of minimum of 3.00m width if it is strait and 3.6 width if it is curved at any point, or one ramp of minimum 4.5 m width and with minimum slope gradient of 1:8 for depth up to 1.8m and 1:10 for more than 1.8m depth shall be provided. Such ramps may be permitted in the front, side and rear setbacks after leaving 4.5m space for movement of fire-fighting vehicles. In case of natural slope of the land, the sloping side or rear open spaces may be treated as ramp provided it has minimum gradient requirements.Access to the basement or terrace parking may also be accomplished through provisions of mechanical lifts.In case of roof slabs or over the basement on which the fire engines/fire vehicle will move shall be capable of taking the load of fire engine/fire vehicle of at least 45 tones.
41.9Up to 10% maximum of basement area may be utilized for utilities and non-habitation purpose like A/C plant room, Electrical installations, laundry excluding generators and transformers.
41.10At least 15 % of the parking space in any apartment buildings shall be earmarked for visitors. Such parking space shall be indicated by painting "Visitor's parking" on the floor. The Visitors parking facility shall be open to all visitors and shall not be sold or settled.
41.11All buildings with a height of 30m. and above or total built-up area more than 10,000sqm. shall have parking space earmarked for ambulance, fire tender and physically challenged persons. Such spaces shall be clearly indicated by painting on the floor the purpose for which the parking space is reserved.
41.12The Basement, apart for Parking, may be used for other activities like library and Games Room only in case of Residential and Institutional Buildings, provided arrangement for adequate natural lighting, ventilation and fire safety as per norms are provided. In such cases the soffit of roof slab of the basement should be minimum of 1.20m. above the surrounding highest ground level.
41.13License shall not be issued or shall be withdrawn if the provision of parking is not as per the bylaws of occupancy groups of Institutional, Commercial or Public Gathering Buildings and shall not be permitted to carry out any activity or business without having provision of parking spaces as detailed in table no.19. This restriction shall also be applicable for part or parts of the building that is let out or sold. The current occupier of the building or part of the building shall not be given license or allowed to carry out any activity or business in such premises that is sold or let out, if the required parking area is not available for the size of the concerned premises.
41.14Parking fees shall be charged as prescribed by the authority for that area for parking lot etc. deficient parking spaces from all existing Institutional building, Commercial building or Public Gathering Buildings where insufficient parking spaces as per Bye-laws applicable at the time of sanction of the plan of respective structures/Building. If proof of sanction by competent authority is not produced the requirement of parking shall be calculated as per prevailing Bye-laws.The fees shall be recovered as prescribed in section 184 of Jharkhand Municipal Act, 2011.
41.155% area of parking space provided should be reserved as provision for Electric & Hybrid Vehicle parking space with duly designed charging station/point in all Public Buildings such as offices, malls, colleges. parking lots, hospitals, petrol stations, airport, railway station etc.

42. Requirement of Parts of Building.

- The various parts of the buildings shall have the following minimum specifications.
42.1Plinth
42.1.1Main Buildings: The plinth or any part of a building shall be so located with respect to the surrounding ground level that adequate drainage of the site is assured. The height of the plinth (except in case of stilted parking) shall be not less than 450 mm from the surrounding ground level.
42.2Habitable Rooms
42.2.1Height: The height of all rooms for human habitation shall not be less than 2.75 m measured from the surface of the floor to the lowest point of the ceiling (bottom of slab). In the case of pitched roof, the average height of rooms shall not be less than 2.75 m. The minimum clear head room under a beam, folded plates or eaves shall be 2.4 m. In the case of air-conditioned rooms, a height of not less than 2.4 in measured from the surface of the floor to the lowest point of air-conditioning duct or the false ceiling shall be provided. These requirements shall apply to residential, business and mercantile buildings. For educational and industrial buildings, the following minimum requirements apply:
•Educational: Ceiling height 3.3 m minimum•Industrial: As per Factory Act, 1948 and Rules therein
42.2.2Size: The area of habitable room shall not be less than 9.5sqm., where there is only one room with a minimum width of 2.4m. Where there are two rooms, one of these shall not be less than 9.5 Sq meter and the other not less than 7.5sqm. with a minimum width of 2.1 m.
42.3Kitchen
42.3.1Height: The height of a kitchen measured from the surface of the floor to the lowest point in the ceiling (bottom slab) shall not be less than 2.75 m, except for the portion to accommodate floor trap of the upper floor.
42.3.2Size: The area of a kitchen where separate dining area is provided, shall be not less than 5.0 Sq meter with a minimum width of 1.8 m. Where there is a separate store, the area of the kitchen maybe reduced to 4.5 Sq meter. A kitchen. which is intended for use as a dining area also, shall have a floor area of not less than 7.5 Sq meter with a minimum width of 2.1 m.
42.3.3Other Requirements: Every room to be used as kitchen shall have:
i unless separately provided in a pantry, means for the washing of kitchen utensils which shall lead directly or through a sink to a grated and trapped connection to the waste pipe;ii an impermeable floor;iii. a flue, if found necessary; and iv a window or ventilator or opening of sufficient size.
42.4Bathrooms and Water-Closets:
42.4.1Height: The height of a bathroom or water-closet measured from the surface of the floor to the lowest point in the ceiling (bottom of slab) shall not be less than 2.4 meter.
42.4.2Size: The area of a bathroom shall not be less than 1.8 Sq meter with a minimum width of 1.2 m. The floor area of water-closet shall be 1.2 Sq meter with a minimum width of 1.0 m. if bath and water-closet are combined, its floor area shall not be less than 2.8 Sq meter with a minimum width of 1.2 m.
42.4.3Other Requirements: Every bathroom or water-closet shall:
i. Be so situated that at least one of its walls shall open to external air; or a duct/ventilation shaft or mechanically ventilated;ii Not be directly over or under any room other than another water-closet, washing place or bath, unless it has a water-tight floor;iii. Be provided, with an impervious floor covering, sloping towards the drain with a suitable grade and not towards verandah or any other room; and iv Have a window or ventilator, opening to a shaft/duct or open space.
42.4.4No room containing water-closets shall be used for any purpose except as a lavatory and no such room shall open directly into any kitchen or cooking space by a door, window or other opening. Every room containing water-closet shall have a door completely closing the entrance to it.
42.5Parapet:- Parapet walls and handrails provided on the edges of roof terraces. balcony, verandah, etc shall not be less than 1.0 m and not more than 1.2 m in height from the finished floor level.
42.6Ventilation Shaft as per NBC

43. Exit Requirements.

- 43.1 GeneralEvery building meant for human occupancy shall be provided with exits sufficient to permit safe escape of occupants, in case of fire or other emergency.43.1.1In every building exit shall comply with the minimum requirement of exit.43.1.2All exits shall be free from obstructions.43.1.3No building shall be altered so as to reduce the number, width of protection of exits to less than that required.43.1.4Exits shall be clearly visible and the routes to reach the exits shall be clearly marked and signposted to guide the population of floor concerned.43.1.5Adequate and reliable illumination shall be provided for exits.43.1.6Firefighting equipment shall be suitably located and clearly marked.43.1.7Alarm devices shall be installed to ensure prompt evacuation of the population concerned.43.1.8All exits shall provide continuous means of egress to the exterior of building or to an exterior open space leading to street.43.1.9Exits shall be so arranged that they may be reached without passing through another occupied unit.
43.2Arrangement of exits:- Exits shall be so located so that the travel distance on the floor shall not exceed 20 meters for residential, educational, institutional, and hazardous occupancies and 30 meters for assembly, business mercantile, industrial and storage occupancies.
43.3Capacities of Exits
43.3.1The unit of exit width used to measure capacity of any exit shall be 50cm. A clear width of 25cm. shall be counted as an additional half unit. Clear width less than 25cm. shall not be counted for exit width.
43.3.2The occupancies per unit exit which shall- be as given in Table-20.
Table 20: Number of occupants as per type of occupancy
Sl. Type of Occupancy Number of occupants per unit exit
Stair Case Door
(1) (2) (3) (4)
1 Residential 25 75
2 Educational 25 75
3 Institutional 25 75
4 Assembly 60 90
5 Business 50 75
6 Mercantile 50 75
7 Industrial 50 75
8 Storage 50 75
9 Hazardous 25 10
Explanation. - (A) Lifts and escalators shall not be considered as an exit.
(B)Travel distance means the distance from any point in the floor area to any exit measured along the path or egress except that when the floor areas are sub-divided into rooms, used singly or of rooms and served by suite corridors and passage, the travel distance may be measured from the corridor entrance of such rooms or suites to the nearest staircase or verandah having access to the street.
(C)For the dormitory portions of homes for the aged, orphanages, mental hospitals, etc. these multipliers will be doubled.
(D)The plinth or covered area shall include, in addition to the main assembly rooms or space, any occupied connecting room or space in the same storey or in the storey above or below where entrance is common to such rooms and space and they are available for use by the occupants of the assembly place.
(E)No deductions shall be made in the gross area of the corridors, closets or other sub-divisions; all space serving the particular assembly occupancy shall be reckoned.
43.4Other requirements of Exits:-
43.4.1Every exit doorway shall open into a enclosed stairway, a horizontal exit, on a corridor or passageway providing continuous and protected means of egress.
43.4.2No exit doorway shall be less than 1.00 in. in width. Doorways shall be not less than 2.00 m. in height.
43.4.3Exit doorways shall open outwards, that is away from the room but shall not obstruct the travel along any exit. No door, when opened shall reduce the required width of stairway or landing to less than 90cm. Over head or sliding doors shall not be installed.
43.4.4Exit door shall not open immediately upon a flight or stairs; a landing equal to at least the width of the door shall be provided in the stairway at each doorway; level of landing shall be the same as that of the floor which it serves.
43.4.5Exit doorways shall be operable from the side which they serve without the use of key.
43.5Other Exists:- 43.5.1 Revolving Doors
43.5.1.1Revolving doors shall not be used as required exits except in residential, business and mercantile occupancies, but shall not constitute more than half the total required door width.
43.5.1.2When revolving door is considered as required exit way the following assumptions shall be made.
Each revolving door shall be constituted on half unit exit width. Revolving door shall not be located at the foot of a stairway. Any stairway served by a revolving door shall discharge through a lobby or foyer.
43.5.2Stairways:- 43.5.2.1 Interior stairs shall be constructe4 of noncombustible materials throughout.
43.5.2.2Interior staircase shall be constructed as a self-contained unit with at least one side adjacent to an external wall and shall be completely.
43.5.2.3A staircase shall not be arranged round a lift shaft unless the latter is entirely enclosed by a material of fire-resistance rating.
43.5.2.4Hollow combustible construction shall not be permitted.
43.5.2.5The width of the stair cases, and horizontal exists should be calculated as per clause 4.2 of part 4 (Fire and life Safety) of National Building Code.
43.5.2.6The minimum width of treads without nosing shall be 25 cm. for an internal staircase for residential building. In the case of other buildings the minimum tread shall be 30 cm. The treads shall be constructed and maintained in a manner to prevent slipping.
43.5.2.7The maximum height of riser shall be 17.5 cm in the case of residential buildings and 15 cm. in the case of other buildings. They shall be limited to 14 per flight.
43.5.2.8Parapet or hand rails shall be provided with a minimum height of 90 cm. from the centre of the trend
43.5.3Fire Escape or external stairs
43.5.3.1Fire escapes shall not be taken into account in calculating the evacuation time of a building.
43.5.3.2All fire escapes shall be directly connected to the ground.
43.5.3.3Entrance to fire escape shall be separate and remote from the internal staircase.
43.5.3.4The route .of fire escape shall be free from obstructions at all times except a doorway leading to the fire escape which shall have the required fire resistance.
43.5.3.5Fire escape shall be constructed of noncombustible materials.
43.5.3.6Fire escape stairs shall have straight flight not less than 90 cm. wide with 25cm. treads and riser not more than 20 cm. The number of riser shall be limited to 16 per flight.
43.5.3.7Handrails shall be of a height not less than 100cm.
43.5.4Spiral Stair (Fire escape)- The use of spiral staircase shall be limited to low occupant load and to a building of height 10m. unless they are connected to platforms, such as balconies and terraces to allow escapes to pause. A spiral fire escape shall be not less that 150cm. in diameter and shall be designed to give adequate headroom, up to a maximum height of 15m.
43.5.5Ramps:- 43.5.5.1 Minimum gradient for the ramps going down to the basement only for parking purposes of maximum of 2.4m. depth should be 1:7 and for depth more than 2.4m. it should be 1:10
43.5.5.2For all slopes the ramp shall be surfaced with approved non slipping materials.
43.5.5.3Parking may be provided along the run of Ramp if the slope is not steeper than 1:20 and the Ramp will be treated as driveway.
43.5.5.4Ramps may be permitted in the rear setback for the for the buildings whose width area in rear side is more or equal to 30m. after leaving requisite setback and the length of the ramp should not exceed more than 50% of such width and also an open an open space of 1.5m. should be left for drainage etc. between the ramp & boundary wall provided the side setback is not less than 4.5m.
43.5.5.5Ramps may also be permitted in the front setback after leaving 4.5m. from the front boundary. (excluding road widening strip if applicable)
43.5.5.6Ramps may also be permitted in the side back after leaving 4.5m. from the boundary.
43.5.5.7Ramps for Hospital: In the case of Hospitals, the slope of ramp shall not be greater than 1:20.

44. Interior open space.

- 44.1 At least one side of all the rooms intended for human habitation, if such room does not abut on the front or the rear or the side setbacks, shall abut on an interior open space whose minimum dimension shall be 3 meters X 3 meters in cases of buildings up to a height of 12meters. In cases where the height of the building is more than 12meters, the width of the interior open space shall be increased at the rate of one meter for every additional 3 (three) meters height. This provision shall be applicable to all categories of buildings, like residential, group housing, commercial. institutional, administrative. assembly etc.
44.2For ventilating the spaces for water closets and bathrooms ventilation shafts shall be provided with size as provided under clause - 8.2.5(b), Group 1, Part-3 of National Building Code of India as bye laws for ventilation shaft

45. Height exemption of a building.

- Any exemption to height shall not be taken in account in case of AAI approval. The following appurtenant structures shall not be included in the height of the building.
45.1Roof tanks and their supports (with support height not exceeding 3 m.)
45.2Ventilating, air conditioning, lift rooms and similar service equipment.
45.3Stair cover (Mumty) or architectural features not exceeding 3.0m. in height.

46. Exemption in Open space.

- 46.1 Every open space provided either in the interior or exterior in respect of any building shall be kept free from any erection thereon and shall be open to the sky and no cornice, roof, or weather shade of more than 0.75 m. in width shall overhang or project over such open space.
46.2A portico of up to 2.5 m, width and 4.6. m. length with a minimum height of 2.1 m. from the plinth level may be permitted within the side setback and leaving minimum 4.5m. from side boundary for buildings 15.0 m. and above in height. A garage is permissible at the rear end of side open space provided no openings are located on the side and rear boundary. Access to the top of the portico/garage should not affect the privacy of the neighboring plot.
46.3The portico provided as above should not rest on the boundary wall and should be open to provide through access to the rear. In case the Portico is not a cantilevered one and supported by pillars, the area shall be included in the FAR.
46.4No projected balcony shall be allowed, on setback less than 2.0m. Projected balcony shall be allowed with a width of 0.9 meters where the setback is between 2.0 meters to 2.5 meters. For setback more than 2.5 meters projected balcony shall be allowed with a width of 1.2 meters. Projected balcony shall only be allowed on the second floor and above floors. It may be allowed on first floor subject to condition that it shall not obstruct the clear vehicular and pedestrian movement around the building including movement of fire tender. 50% of the area on the projected balcony shall be taken into account for calculation of floor area. No balcony should be provided with fixed grill as it works as fire refuse areas.

47. Mezzanine.

- 47.1 Mezzanine floor may be permitted above any floor in all types of buildings up to an extent of one-third of the actual covered area of that floor. All Mezzanine floors shall be counted toward FAR calculation.The mezzanine floor shall have a minimum clear height of 2.10 m The minimum size of the mezzanine floor, if it is to be used as a living room, shall not be less than 9.5 Sq meter. The aggregate area of such mezzanine floor in a building shall in no case exceed one- third the plinth area of the building.

48. Basement/Cellar.

- 48.1 Basements/cellars shall not be permitted in low lying area and without adequate drainage facilities to ensure drainage from the basement. Basement shall not be allowed in flood prone areas.
48.2Construction of basements/cellars may be allowed by the Authority in accordance with the provisions contained in the development plan applicable to the concerned area.
48.3The basements/cellars shall only be put to the following uses:
48.3.1Storage of household or other non-combustible material
48.3.2Strong room, bank cellars library;
48.3.3Installation of air-conditioning equipments and other machines used for service and utilities of building;
48.3.4Parking.
48.4Individual residential and small commercial buildings, plot size up to 750sqm. may have one basement. However maximum two floor basements/cellars may be permitted to be constructed for plot size above 750sqm. leaving the prescribed set back/open space applicable to the building. Further, in case of apartment/group housing/commercial/buildings and basements may be allowed to be constructed under the entire plot area leaving minimum of 3m. space from the boundary in front, sides and rear of the premises subject to the following;
48.4.1In all such cases the owners have to indemnify the Authority against any damage caused by her/him/them to the adjacent property (Form-XI II (A)).
48.4.2The portion of the basement projecting out of the building line in the setback area shall flush with the ground or of a plinth not exceeding 0.9 m height, approachable with a ramp of I :10 gradient from the road level and the roof of such the basement in the open spaces areas, if intended to be used as vehicular passage, should be designed to be able to take the load of fire engines/vehicles of 45 tones
48.5The basements shall be used exclusively for parking/services/storage or as permitted in 41.9 and 48.3
48.6The basement shall fulfill the following requirements:
48.6.1Every basement shall be in every part at least 2.4m. in height from the floor to the soffit of the roof slab or ceiling; and minimum of 2.1m below the soffit of beams.
48.6.2Adequate ventilation shall be provided for the basement. The standard of ventilation shall be the same as required by the particular occupancy according to bye laws. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans (one exhaust fan for 50sqm. of basement area), air conditioning system etc;
48.6.3The minimum height of the ceiling of upper basement shall be 0.90m. and the maximum, 1.5 m. above the average surrounding ground level;
48.6.4Adequate arrangement shall be made, so that surface drainage does not enter the basement;
48.6.5The walls and floors of the basement shall be water-tight and be so designed that the effect of the surrounding soil and moisture, if any, are taken in to account in design and adequate damp proofing treatment is given;
48.6.6The access to the basement shall be separate from the main and alternative staircase providing access and exit from higher floors shall be provided. Where the staircase is continuous in the case of buildings served by more than one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and higher floor.
48.6.7Open ramps shall be permitted if they are constructed within the building line subject to provision of above.

49. Provision of Lift.

- 49.1 For Residential49.1.1For no. of flats more than 8 and up to 18, one lift of the capacity of 6 passengers will be mandatory for G+4 and above.49.1.2For every 16 flats and part thereof one lift of the capacity of 6 passengers shall be provided for residential buildings up to G+4 or of the height of 12 meters and above.49.1.3However in case, where part thereof is less than 50%, then the requirement can be met by increasing the passenger capacity of lift.49.1.4If the number of flats in a multi-storied residential building is more than 12, the provision of lift will be compulsory for G+3, even if the height of the building is less than 12meters. The capacity and no. of lifts shall be as mentioned above.49.1.5Provision of lift should be made for residential buildings of more than G+3 storied or buildings having the height of 12 meters , whichever is lower49.1.6Provision of one stretcher lift every building more than 6 storey height49.1.7Every lift should have Provision of automatic rescue device, door sensor and automatic fire proof door.
49.2For Non-Residential:
49.2.1Building above ground + 2 floor
49.2.2I person capacity per 500 sqm. or fraction thereof of built-up area excluding ground floor and covered parking area
49.2.3Minimum number of lifts to be 2 for all non-residential building above ground + 3 and the minimum capacity shall be 6 persons per floor.
Note:- 1. All the lift requirements shall be subject to fire requirement.

2. All sizes of lift (i.e. car inside, lift well, entrance, headroom etc.) shall be as per the requirements of N.B.C. or as per manufacturers specifications.

3. All lifts shall be inspected at least once a year by the agency designated by the Authority. The Authority can also outsource the inspection of lifts.

4. The area of lift well at one floor only (not the sum of total area of lift well at every floor) shall be counted for F.A.R calculation.

50. Barrier free access for the differently abled person.

- 50.1 Barrier free environment is one, which enables people with disabilities to move about safely and freely and to use all facilities within the built environment. The goal of barrier free design .is to provide an environment that supports the independent functioning of individuals so that they can get into and participate in all activities without assistance.
50.2The main purpose is to integrate disabled and elderly persons fully into the society. In view of the above, the Government of India has enacted the Disabilities Act, 1955.
50.3Section 44, 45 and 46 of the said Act stipulates that the appropriate Governments, local authorities to ensure provisions of barrier free facilities in all new Government buildings and public utilities roads and transport. Also, in 1996 Government of India enacted another person with Disabilities (Equal Opportunity, Protection of Rights and Full Participation) Act for the Barrier Free Environment for differently abled persons.
50.4Site Development:- Level of the roads, access paths and parking areas shall be described in the plan along with specification of the materials.
50.5Access Path/Walk Way :- Access path from plot entry and surface parking to building entrance shall be minimum of 1800 mm. wide having even surface without any steps. Slope, if any, shall not have gradient greater than 5%. Selection of floor materials shall be made suitably to attract or to guide visually impaired persons (Limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emit different sound to guide visually impaired persons hereinafter referred to as "guiding floor material"). Finishes shall have non slip surface with a texture traversable by a wheel chair. Curbs wherever provided should blend to a common level.
50.6Parking:- For parking of vehicles of handicapped people the following provisions shall be made:
50.6.1Surface parking for two car spaces shall be provided near entrance for the physically handicapped persons with maximum travel distance of 30 meter from building entrance.
50.6.2The width of parking bay shall be minimum 3.6 meter.
50.6.3The information stating that the space is reserved for handicapped persons shall be conspicuously displayed.
50.6.4Guiding floor materials shall be provided or a device which guides visually impaired persons with audible signals or other devices which serves the same purpose shall be provided.
50.7Building requirements:- The specified facilities for the buildings for handicapped persons shall be as fo lows:
50.7.1Approach at plinth level: Every building must have at least one entrance accessible to the handicapped and shall be indicated by proper signage.
This entrance shall be approached through a ramp together with stepped entry.
50.7.2Ramp Approach: Ramp shall be finished with non-slip material. Minimum width of ramp shall be 1800 mm. with maximum gradient 1:12, length of ramp shall not exceed 9 meter having 800 mm high hand rail on both sides• extending 3 00mm beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.
50.7.3Stepped Approach: For stepped approach width of tread shall not be less than 300 mm. and maximum riser shall be 150 mm. Provision of 800 mm. high hand rail on both sides of the stepped approach similar to the ramp approach shall be made.
50.7.4Exit/Entrance Door: Minimum clear opening of the entrance door shall be 900mm and it shall not be provided with a step that obstructs the passage of a wheel chair user. Threshold shall not be raised more than 12 mm.
50.7.5Entrance Landing: Entrance landing shall be provided adjacent to ramp with the minimum dimension 1800mm X 2000 mm. The entrance landing that adjoins the top end of a slope shall be provided with floor materials to attract the attention of visually impaired persons (limited to colored floor material whose color and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons hereinafter referred to as "guiding floor material"). Finishes shall have a 'non-slip surface with a texture traversable by a wheel chair. Curbs wherever provided must blend to a common level.
50.7.6Corridor connecting the entrance/exit for the handicapped: The corridor connecting the entrance/exit for handicapped leading directly outdoors to a place where information concerning the overall use of the specified building can be provided to visually impaired persons either by a person or by signs, shall be provided as follows:
50.7.6.1Guiding floor materials, shall be provided or devices that emit sound to guide visually impaired persons,
50.7.6.2The minimum width shall be 1250 mm.
53.7.6.3In case there is a difference of level, slope ways shall be provided with a slope of 1:12
53.7.6.4Hand rails shall be provided for ramps/slope ways at a height of 800mm.
50.8Stair ways:- One of the stairways near the entrance/exit for the handicapped shall have the following provisions:
50.8.1The minimum width shall be 1350 mm.
50.8.2Height of the riser shall not be more than 150mm and width of the tread 300mm. The steps shall not have abrupt (square) nosing.
50.8.3Maximum number of risers on a flight shall be limited to 12.
50.8.4Hand rails shall be provided on both sides and shall extend 30mm on the top and bottom of each flight of steps.
50.9Lifts:- Wherever lift is required as per bye-laws, provision of at least one lift shall be made for the wheel chair user with the following cage dimensions of lift recommended for passenger lift of 13 persons capacity by Bureau of Indian Standards. The clear internal dimensions of the lift car shall be minimum of: depth- 1100mm, width- 2000mm and entrance door width- 900 mm.
50.9.1A handrail not less than 600 mm. long at 1000mm. above floor level shall be fixed adjacent to the control panel.
50.9.2The lift lobby shall be of an inside measurement of 1800 mm x 1800mm or more.
50.9.3The time of an automatically closing door shall be minimum 5 seconds and the closing speed should not exceed 0.25 meter/section
50.9.4The interior of the cage shall be provided with a device that audibly indicates the floor the cage has reached and indicates that the door of the cage for entrance/exit is either open or closed.
50.9.5The control panel shall have markinu in Braille to help visually impaired.
50.10Toilets: One special Water Closet, in a set of toilets shall be provided for the use of handicapped with essential provision of washbasin near the entrance for the handicapped.
50.10.1The minimum size shall be 1500 x 1750 mm.
50.10.2Minimum clear opening of the door shall be 900mm and the door shall swing out.
50.10.3Suitable arrangement of vertical/horizontal handrails with 50mm clearance from wall shall be made in the toilet.
50.10.4The Water Closet seat shall be 50mm from the floor.
50.11Drinking Water: Suitable provision of drinking water shall be made for handicapped near the special toilet provided for them.
50.12Designing for Children: In a building meant for the predominant use of the children, it is necessary to suitably alter the height of the handrail and other fittings and fixtures.

51. Rainwater harvesting system.

- 51.1 Provision of rainwater harvesting shall be mandatory for 300 sqm. and above size of plots-The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sqm. of roof area. Percolation Pits shall be filled with small pebbles or brick jali or river sand and covered with perforated concrete slabs. Apart from this, the following requirements are optional and may be provided depending on site conditions.
51.1.1Terrace Water Collection: The terrace shall be connected to a sump or the well through a filtering tank by PVC pipe. A valve system shall be incorporated to enable the first part of the rainwater collected to be discharged out or to the soil if it is dirty. A filtering tank measuring 0.36 Sq. m. can be constructed near the sump. The tank can be divided by a perforated slab and one part should be filled by small pebbles and other by brick jali. The bottom portion of the tank should have aslope' to avoid stagnation of water.
51.1.2Open Ground: Where there is open ground, a portion of topsoil shall be removed and replaced with river sand to allow slow percolation of rain water. Any other method proved to be effective in conservation and harvesting of rainwater may be adopted in each and every construction taken up.

52. Signs and outdoor display structures.

- 52.1 Signs and outdoor display structures shall be governed by the relevant provisions of the area where no specific guideline for the above structures is framed; the Authority shall prescribe the guidelines with approval of Government.

53. Lightening Protection.

- 53.1 To arrest Lightening, provision of lightening conductor is mandatory in the all types of buildings as per NBC-2005 norms.

54. Penal Action against Builders/Technical Personnel.

- 54.1 Not withstanding anything contained in these regulations, the Authority reserves the right to debar/black list the builder/technical person who have deviated from the professional conduct or has made any fraudulent statement or has misrepresented/suppressed any material facts in his application/plan or is involved in construction of the building deviating from the approved plan/norms of these bye laws.
54.2Before taking any action under clause specified above, the Authority shall issue a notice specifying the reasons thereof asking for a show-cause within 15 days as to why such builder/technical person shall not be debarred/blacklisted. After receipt of the show cause, if any, the same shall be placed before the Authority for a decision on debarring/black listing the technical person/builder. The decision of the Authority in this regard shall be published in the Notice Board of the Authority and the Government website.
54.3An appeal against an order under sub-clause above shall lie under sections of the Municipal Act/other relevant Act.

55. Builder to register an association.

- 55.1 The builder shall cause to register an Association of apartment owners as required under The Jharkhand Apartment Ownership Act, 2006 before occupancy certificate for minimum of 50% or more of the floor area is given.
55.2The builder shall enter into agreement with the apartment owners' Association/Society at the time of handing over of the apartment/premises. This agreement shall contain the terms of maintenance of common amenities which will include all the conveyances contained in the deed of sale to the owners of the flats. The maintenance period will be minimum of one year from the date of such agreement. The copy of the agreement shall be submitted to the authorities also before getting the occupancy certificate.

56. Reference to the standards.

- The following standards shall be referred while preparing the design of the building:
56.1The standards relating to water and sanitation requirements for various occupancies and uses, shall be referred to as per section 1 of part-9 of NBC of India, 2005 group-5.
56.2Construction of energy efficient building shall be referred to Energy Conservation Building Code, 2007
56.3Guidelines for installation of solar water heating system shall be referred to as Annexure-II.

57. Life Safety.

- The building design shall comply to the provisions of life safety as mentioned in National Building Code 2005 (Group-I Part-TV Fire and Life Safety-4) or wherever applicable and the applicant shall reflect compliance of these provisions in completion certificate.Chapter - V Additional Requirements for Saftey and Services

58. For construction of Multi-storied building.

- 58.1 Construction of multi- storied building shall not be permitted villages/wards/municipalities/planning areas specified by the State Government. The Authority may include or exclude any other areas for prohibition of multi storied building from time to time.
58.2The Authority may restrict construction of multi-storied buildings in any other area on the basis of objective assessment of the available infrastructure and planning needs after obtaining due approval of the Government.
58.3Before commencement of these bye laws, where permission has been granted conditionally, such cases shall be dealt with under corresponding provisions of these Bye laws without any major change, or removal of construction, subject to the condition where violation of Heritage Zone conditions has occurred, this relaxation shall not apply.
58.4No Condonation in parking requirements, fire fighting provisions, health and structural safety requirements in case of development of Multi Storied buildings shall be allowed.
58.5In addition to the provisions of Part 4 Fire and Life Safety of National Building Code of India 2005 (Group 1), the Planning Authority may insist on suitable provisions in building from fire safety and fire fighting point of view depending on the occupancy and height of buildings in the case of Multi Storied building.
58.6The following shall be mandatory for the development of all Commercial and multi dwelling units including apartments:
58.6.1Land left for road widening/cul-de-sac should be paved and in matching level of the existing road.
58.6.2All drainage inside the plot should be covered and underground.
58.6.3All service pipes, PVC water tanks etc. should be concealed from all side.
58.6.4Lighting poles with lights within the boundary wall facing towards the road. One lighting poles with minimum height of 6mtr. at every l5mtr. or fraction thereof of the length of the front boundary wall shall be provided with 150W of LED, facing towards the road for street lighting and should also be connected to the Generator.
58.6.5Plantation-Number and type of plantation with the boundary along the road.
One tree of suitable variety should be planted at every 6m. or fraction thereof of the length of the front boundary.
58.6.6Water harvesting system for recharge well shall be provided as per NBC norms.
58.6.7Solid waste disposal bins of suitable size inside the plot.
58.6.8Lifts, pumps, external lighting shall be connected to pollution free noiseless Generator.
58.6.9Minimum of 3 amp./flat to be provided from pollution free noiseless Generator
58.6.10Lift shall be mandatory for above G+3 or as provided in this bye-laws and should be connected to power backup generator.
58.6.11All electrical power generators shall be noiseless & pollution free.
58.6.12Recycling of waste water shall be made mandatory for any building consuming more than 12000 liters per day or having 24 flats or more, whichever is lower.
58.6.13Service Ducts shall not be counted in the F.A.R. of building.
58.6.14No FAR should be added for parking for any floor except the lockup, garage.
58.6.15Minimum 50% of all paving around the building the driveway etc. should be soft paving in the form of interlocking, concrete block (without mortar or solid sub base) or such other systems to insure surface water percolation into the subsoil.
58.6.16Minimum 50% of bricks use in the building should be made of fly-ash
58.6.18If more than one storey height is covered with fiber glass or like materials which permits light, it should not be counted for covered area and FAR calculations. If covered with unusable/non accessible RCC roof, the covered atrium area will be counted for covered area calculation but not for FAR value. This is done to encourage better standard of planning for bigger shopping malls.
Atriums open to sky or covered with the light weight roof member which permits light shall also not be used for F.A.R calculations unless the roof top is used as a usable floor space.
58.6.19For ventilation of the spaces for water closets and bath rooms, if not opening on to front, rear , side or interior open space these shall open on to the ventilation shaft , the size of which shall not be less than as given in Table below. This shall be limited for natural ventilation only".
58.6.20Ventilation requirements can be met by the mechanical ventilation system like air conditioning etc. Toilets may be permitted without any exterior openings for the buildings like hotels, commercial complexes etc as per N.B.C. but not for apartments and residences.
Sl. Height of Building Area (sqm.) Min. Width (in meter)
1 Upto 12.00 meter 1.2 0.9
2 Upto 16.00 meter 2.8 1.2
3 Upto 22.00 meter 4.0 1.5
4 Upto 28.00 meter 5.4 1.8
5 Upto 34.00 meter 8.0 2.4
6 Above 34.00 meter 9.0 3.0
58.6.21Provision of toilets for visitors, and separate toilets for guards and drivers
58.6.22Provision for harnessing Solar Energy for electricity shall be made in every building of more than 500sqm.

59. Maintenance.

- 59.1 In case of buildings with a height of 15.0 meters and above or ground coverage more than 500 sqm., the main entrance to the premises shall not be less than 5 (five) meters in width in order to allow easy access to fire engine. The gate shall fold back against the compound wall of the premises, thus leaving the exterior access way, within the plot, free for the movement of fire service vehicles. If archway is provided over the main entrances, the height of the archway shall not be less than 5 (five) meters.
59.2The space set apart for providing access, within the premises shall in no case, be included in the calculation of requirements pertaining to parking spaces and other amenities required to be provided for the building.
59.3Every access way shall be properly drained and lit to the satisfaction of the Authority. Manhole covers or any other fittings lay within the right of way of the access way shall be flushed with the finished surface level of it so as not to obstruct safe movement of men and vehicles.
59.4Reconstruction, addition or alteration to any multi-storied building shall not be taken in a manner, which shall reduce the width of the access way to a level below the minimum prescribed limit under these bye laws.

60. Structural Safety Design, Standards and other Services requirements.

- 60.1 All buildings shall comply with the standards as mentioned below:Structural Design: The structural design of foundation, elements of masonry, timber, plain concrete, reinforced concrete, prestressed concrete and structural steel shall be carried out in accordance with Part-6 of Group-2 structural design and related aspects, section-I loads, forces and effects] section-2 soils and foundations, section-3 Timber and bamboo, 3A timber, 3B bamboo, section-4 masonry, section-5 concrete, 5A plain and reinforced concrete, 5B pre stressed concrete and section-6 steel, section-7 prefabrication, systems building and mixed/composite construction, 7A prefabricated concrete, 7B systems building and mixed/composite construction of National Building Code of India, 2005 taking into consideration all relevant Indian Standards prescribed by Bureau of Indian Standards including the Indian Standard as given below for structural safety. In case of High Rise Buildings a Certificate of Under Taking for Hazard Safety Requirement shall be submitted in Form-XIV.
60.2For General Structural Safety

1. IS: 456:2000 "Code of Practice for Plain and Reinforced Concrete

2. IS: 800-1984 "Code of Practice for General construction in Steel

3. IS: 801-1975 "Code of Practice for Use of Cold Formal Light Gauge Steel Structural Members in General Building Construction

4. IS 875 (Part 2): 1987 Design loads (other than earthquake) for buildings and structures Part 2 Imposed Loads

5. IS 875 (Part 3): 1987 Design loads (other than earthquake) for buildings and structures Part 3 Wind Loads

6. IS 875 (Part 4): 1987 Design loads (other than earthquake) for buildings and structures Part 4 Snow Loads

7. IS 875 (Part 5): 1987 Design loads (other than earthquake) for buildings and structures Part 5 special loads and load combination

8. IS: 883:1966 "Code of Practice for Design of Structural Timber in Building

9. IS: 1904:1987 "Code of Practice for Structural safety or Buildings: Foundation"

10. IS 1905:1987 "Code of Practice for Structural Safety of Buildings: Masonry Wall

11. IS 2911 (Part I): Section 1: 1979 "Code of Practice for Design and Construction of Pile Foundation Section 1

60.3For Earthquake Protection

12. IS: 1893-2002 "Criteria for Earthquake Resistant Design of Structures (Fifth Revision)"

13. Is: 13920-1993 "Ductile Detailing of Reinforced concrete Structures subjected to Seismic Forces - Code of Practice"

14. IS:4326-1993 "Earthquake Resistant Design and Construction of Buildings- Code of Practice (Second Revision)"

15. IS: 13828-1993 "Improving Earthquake Resistance of Low Strength Masonry Buildings - Guidelines"

16. IS:13827-1993 "Improving Earthquake Resistance of Earthen Buildings - Guidelines",

17. IS: 13935-1993 "Repair and Seismic Strengthening of Buildings - Guidelines"

60.4Quality of 'Materials and Workmanship': All material and workmanship shall be of good quality conforming generally to the accepted standards of Public Works Department and Indian standard specification and codes as included in Part-5 of Group-i Building Materials and Part-7 of Group-3 Construction practices and safety of National Building Code of India.
60.5Alternative Materials, Methods of Design and Construction' and Tests: The provisions of these bye laws are not intended to prevent the use of any material or method of design or construction not specifically prescribed by these bye laws provided any such alternative has been approved. The building materials approved by B.I.S. or any statutory body will form part of the approved building material and technology as part of the bye laws.
60.6Building Services
60.6.1The Planning design and 'installation of electrical installations, air conditioning installation of lifts and escalators can' be carried out in accordance with Part-8 of Group-4 Building Services, section 1-Lghting and Ventilation, section-2 Electrical and Allied Installations, section-3, Air conditioning and heating, section-4 acoustics, sound insulation and noise control, section-S installation of lifts and escalators of National Building Code of India, 2005.
60.6.2The requirements of electric sub-station and the provision of electric sub-station shall also require approval from the concerned Authority.
60.7Plumbing Services:- The planning, design, construction and installation of water supply, drainage and sanitation and gas supply system shall be in accordance with Part-9 of Group-5, Plumbing Services, section-j water supply, drainage and sanitation (including solid waste management) section-2 gas supply of National Building Code of India 2005.Chapter- VI Group Housing

61. Housing Schemes.

-
61.1 Minimum Size of the Plot - 3000 sqm.
61.2 Maximum Ground Coverage - 35%
61.3 Maximum F.A.R - 3.0
61.4 Height Limitation    
61.4.1No height limitation shall be applicable except in areas near protected monuments and airport, etc.
61.5Means of Access would be minimum of 6.1m with a provision of strip of land of 6.1m with along the side contiguously abatting the road, which shall be paved and in same level as of the existing road. FAR admissible such strip may be additionally utilized for same project.
61.6Playgrounds, Gymnasium, Community Hall, Retail Shops, Health Club, CCTV, 100% power backup (Excluding AC) Geysers, Sewerage treatment plant (STP) shall be provided.
61.7Internal access way of minimum 9.0m. width shall be provided within the campus to reach up to each block. Moreover, if plot is in new area and the internal access ways length exceeds 600 in. then it should be according to the provisions of Table 6.
61.8Provision of land and floor area for EWS & LIG shall be as per provision made in Jharkhand Municipal Act 2011 under section 427 (5).
61.9At least 5% of the electrical energy requirement of the Group Housing Schemes shall mandatorily come from "Solar Energy". Provisions of Solar Water Heating System.
61.10Under Group Housing Schemes buildings of G+4 and above may be built for EWS & LIG. For this type of construction density criteria shall not be taken in to account and for this purpose the developer shall provide Fire Fighting provisions, Lift and other Safety measures on mandatory basis.
61.11Every developer, who builds, EWS & LIG housing as per prevailing norms, shall be entitled to F.A.R equivalent to the floor area provided for such EWS & LIG housing. The concerned building plan will be sanctioned with condition that additional F.A.R would be utilized by the Developer only after completion of houses being built for EWS & LIG. F.A.R admissible to the developer, as incentive, may also be used in the same/other new projects within the jurisdiction area of Municipal/Authority concerned. The incentive F.A.R would be in addition to maximum FAR as per rule 61.3
61.12In all Group Housing and Group Development Scheme Projects, whose land extent is more than 5 acres (2.023 Hectares), the Developer/Builder shall provide 15% of the total built up area towards the EWS or 35% of the total number of units of the housing project towards EWS. The option is given to the Builder/Developer to provide either 15% of the total build up area or 35% of total number of units. Minimum plinth area of each EWS Unit shall be 30sqm. The following norms shall be adhered to:
61.12.1In case of Ranchi Municipal Corporation/Dhanbad Municipal Corporation areas, 15% of the total built up area or 35% of the total number of units towards EWS, shall be provided within the site or within the radius of 5 km. of the project site subject to fulfillment of these Rules, with regard to minimum width of access road and other parameters.
61.12.2In case of other Urban Local Bodies, 15% of the total built up area or 35% of the total number of units towards EWS shall be provided within the site or within the radius of 2 km of the project site, subject to fulfillment of these Rules, with regard to minimum width of access road and other parameters.
61.12.3In Case of Gram Panchayat areas falling in Urban Development Authority Areas and in sanctioned Master Plans, EWS units are to be provided in-situ only.
61.13Two or more builders may be allowed to provide (with respect to proportionate area of the main projects) the specified number of EWS units as prescribed with all civic amenities but the occupancy for the main projects will be released only after completion of the EWS projects. Separate undertakings shall be obtained from the builders concerned by the Local body.
61.14In case of Group Housing/Group Development Schemes, whose land extent is more than 3000 sqm. and upto 5 acres (2.023 Hectares), option of depositing shelter fee would be offered, which shall be collected as follows.
61.14.1The following shelter fee to be levied:
Area Rate for sqm.
Ranchi Regional Development Authortity/RanchiMunicipal Corporation/Dhanbad Municipal Corporation Rs. 13,000.00
Other Municipal Corporations Rs. 11,000.00
Mango Notified Area Committee Jamshedpur,Jugsalai Municipality Rs. 13 000.00
Other Municipalities, Nagar Panchayats and otherRural Local Bodies falling in Regional Development Authority Area(Except RRDA)/UDA area/Master Plan areas Rs. 8,000.00
61.14.2The shelter fee shall be collected for 20% of total site area of the project.
61.14.3The shelter fee collected shall be utilized for development of EWS housing under Pradhan Mantri Awas Yojna (PMAY) or any other Urban Housing Scheme meant for EWS categories or for undertaking civic amenities in slums and weaker section colonies only for which a separate account shall be maintained by the local body/Urban Development Authority. The shelter fee can also be utilized for re-development/improvement/rehabilitation of slums under Pradhan Mantri Awas Yojna (PMAY) programme as local body share.
61.15The projects below 3000 sqm. of plot area are exempted from reservation of built up area/number of units for Economically Weaker Section/Low Income Group as well as payment of shelter fee.
61.16With regard to identification of beneficiaries and procedure for disposal of EWS/LIG units by builder/developer/public or private Agencies, separate guidelines will be issued by the "Urban Development and Housing Department".Chapter -VII Requirement for Special Occupancies

62. Semi-detached and row housing.

- 62.1 Owners of adjacent similar dimension plot abutting a road may be permitted to construct row or semi-detached buildings.
62.2The orientation of the row or semi-detached building shall preferably be such to ensure proper ventilation.
62.3For semi-detached buildings over two adjacent plots, the setbacks, the height and the FAR shall be regulated by treating both the plots as one.
62.4In case of row housing, the length of a row shall not exceed 50 in. along the road on which such houses abut. In case, the dwelling units in a row are scattered the maximum length of the row shall be 100 m.
62.5The minimum size of the plot on which a unit of a row housing may be allowed shall be 50 sqm.
62.6The height of such housing should not be more than 8.55m.

63. Shop-cum-residence.

- 63.1 Where plots are in a row for shop-cum-residential purpose the Authority may allow construction of shop-cum-residential building without any side set backs up to a depth of 10 meters from the front exterior wall. Provided that no part of the building up to said depth is used for residential purpose on the ground floor. No building exceeding 12 meters in height shall be allowed to be constructed as a shop-cum-residential plot, unless so permitted under the zonal Development Plan, provided that the shop-cum-residence shall have 2/3rd of the total floor area used for shops. The FAR and other parameters shall conform to that specified for commercial buildings.

64. Cinema, Multiplex and Theatre building.

- 64.1 The relevant provisions of the Jharkhand Cinemas (Regulation) Act, 1954 or any other relevant act shall apply for planning, designing and construction of Cinema and Theatre buildings.
64.2No permission for construction of a building to be used as a cinema hail, theatre or auditoria for cultural show shall be granted unless the construction of such buildings conforms to the provisions of the Jharkhand cinemas (Regulation) Act, 1954 or any other law in the subject for the time being in force in the State.
64.3All cinema, theatre or auditoria buildings shall conform to IS; 4898 1968 and acoustics design of such buildings shall adhere to the requirements of IS; 2526-1963.
64.4Exits and fire safety requirements shall be in accordance with Part IV (Fire and life safety) of National Building Code of India, 2005.

65. Liquefied Petroleum Gas.

- 65.1 Vacant space shall be maintained at all times, with the following distances for storage shed used for the storage of liquefied petroleum gas cylinders between any building, public space, public road or any adjoining property which may be built upon and the said storage shed. The minimum clear distance shall be as per Table 21.Table - 21: Minimum distances required for storage shed of liquefied petroleum gas cylinders
Quantity of Compressed Gas in Cylinders (Kg.) Minimum Clear Distance to be Kept (meters)
0-100 1
101-1000 3
1001-4000 5
4001-8000 7
8001-12000 9
12001-30,000 12
Over 30,000 15
65.2Not withstanding anything contained in the conditions specified above, cylinders containing liquefied petroleum gas exceeding 100 Kilograms but not exceeding 300 Kilograms may be kept in a storage shed forming part of, or attached to building, if it is separated there from by a substantial partition and the only means of access to it is from outside. Such a storage shed shall not be situated under any staircase or near other entrances to or exits from the rest of the building or other buildings. A shed used for storage of liquefied petroleum gas cylinders shall be surrounded by a suitable fence to prevent unauthorized persons from having access to the shed.

66. Petrol Pump.

- 66.1 Minimum distance from the road intersections shall be:A. For minor roads having less than 30 in. width - 50 m.B. For major roads having width 30 m. or more -100 m.
66.2The minimum distance of the property line of petrol pump from the centre line of the road shall not be less than 15 meters on roads having less than 30 m width. In case of roads having 30 m or more width, the width of the road shall be protected.
66.3Plot size:- A. Only for filling stations -30m x 20rnB. Filling-cum-service station 40 m x 30 mC. Frontage of the plot shall not be less than 30 m
66.4New petrol pump shall not be located on roads having less than 30 M width
66.5Every petrol pump shall have public toilets with W.C. separately for men and women.
66.6Other controls:-
66.6.1 Ground coverage - 20%
66.6.2 FAR - 1.0
66.6.3 Max Height - 7m
66.6.4 Canopy equivalent to permissible ground coveragewithin setback line,
66.6.5 Front set back - minimum 9 m
66.7Other regulations
66.7.1NOC from Explosives/Fire Service Department
66.7.2License from the District Magistrate
66.7.3Ground coverage will exclude canopy area
66.8Compressed Natural Gas (CNG) mother station
66.8.1Plot size (Max)- 36 m X 30 m
66.8.2Maximum ground coverage - 20%
66.8.3Maximum height-7m (single storey)
66.8.4Building component- control room/office/dispensary, store, pantry and W.C.

67. Farm House.

- 67.1 For construction of Farm House Building in Agriculture and Forest use Zone
67.2Minimum size of plot- Minimum size of a plot for farmhouse shall not be less than 1.00 hectare.
67.3Maximum coverage and FAR shall be as given in the table-22.Table 22: Maximum coverage and FAR
A Maximum permissible ground coverage for alltypes of activity 10 %
B Maximum permissible FAR 0.20
C Residential accommodation of watch andward/maintenance staff 40 sqm.
D Maximum height 7m.
E Setbacks Front/side abutting road 15.0 m. and all othersides 9.0
67.4Other Provisions: Minimum 65% of the total area of the farmhouse shall be under plantation/cultivation. At least 100 trees per hectare shall be planted out of which at least 50 percent shall be evergreen trees.
67.5Water supply, Sewerage and drainage:
67.5.1In case of a plot for a farmhouse having dwelling units, the owner thereof shall be responsible to make lawful arrangements for potable water.
67.5.2The owner shall be responsible to provide drains in the farm house to be used for rain water and in case of dairy farm open or closed sanitary drains to clean sheds, as may be required by the Authority.
67.5.3The owner shall be responsible to provide septic tank with necessary disposal trenches for disposal of human and animal waste in the farmhouse within his own premises.
67.6Electrification:- The owner of a farmhouse shall obtain electric connection directly from the appropriate authority authorized for distribution on such terms and conditions at his own cost as decided by the appropriate Authority from time to time.Chapter-VIII Development and Sub-Division of Land

68. Application.

- 68.1 Applications for subdivision of land for utilizing selling, leasing out or otherwise disposing it off shall be made to the Authority in Form-1.
68.2The applications for subdivision shall be in addition to the requirements specified in Bye laws-5.3.3 accompanied byi. A copy of the title deed of the land in question;ii. An affidavit with regard to the right, title and interest of land and such other particulars as the Authority may require;iii. An authenticated copy of the certificate with regard to the payment of development charges, if any.iv. An authenticated copy of the receipt towards payment of fee to the Authority as prescribed under bye-laws-9.2;v. A no-objection certificate, from the lessor in case the land is not leasehold unless the lease deed permits undertaking subdivision as applied for;vi. A site plan traced out of revenue village settlement map in operation indicating therein in red colour the lands to which the application relates and surrounding plots;vii. An index plan of the site showing adjoining areas within a radius of 150 m. round from the proposed site marking clearly therein the boundaries of the proposed layout in red colour. existing road, structures, burial ground and .high tension or low-tension power line passing through the site of the layout plan and the level of the site;viii. A detailed plan to a scale not less than 1:1000 or as required by the authority showing the proposed layout (sub-division) indicating size of plot width of the proposed road, open space and amenities provided;ix. Land use analysis indicating the survey plot number, the bye-plot number, the detailed dimensions of all the plots, the area of each-plot and the use to which they are proposed to be put;x. In case of land originally belonging to any religious endowments, a no-objection certificate from the endowment commissioner or board as the case may be.
68.3Where permission for sub-division of land is granted, such permission shall be communicated to the applicant in Form-VIII B within 60 days from the receipt of the application.
68.4Where permission for sub-division of land is refused such refusal, shall be communicated to the applicant in Form-1X.

69. Use in relation to Development Plans.

- 69.1 Subdivision of land shall normally be permitted for the purpose for which the concerned land is earmarked in the development plan. Such subdivision may be for residential, commercial industrial, institutional or combination of one or more of this purpose or such other purpose as may be considered conforming to the provisions in the development plan: provided that in every subdivision plan spaces for roads, community facilities and public utilities as specified in this part or such other facilities as the Authority may determine shall be incorporated.
69.2After a subdivision plan has been approved the Authority shall not permit construction of a building on any of the plot unless the owners have laid down and made street or streets and provided amenities as approved or transferred the land covered by roads, open spaces or other public purposes to the concerned local body.
69.3Subdivision of land for residential purpose in green-belt use zone shall not be permitted unless such sub-division in the opinion of the Authority forms a part of the normal expansion of existing human habitation.
69.4The sub division shall conform to the proposals of the development plans.

70. Size of the plot and road width.

- 70.1 Minimum Road Widths for Subdivision in Residential Area: No subdivided plot will be less than 50 sqm. However the Authority reserves the right to relax in special cases such as EWS housing. The size of the plot shall be according to the relevant sub-division of plot size in the zones as per Table-23.Table-23: Minimum road widths for sub division in residential area
Sl. Length of road in (m) Min. width of road** (m)
1 Up to 250 9.0
2 Above 250 up 500 12.0
3 Above 500 to 1000 15.0
**For EWS housing scheme, the minimum road width may be relaxed.Note :- All junction of service roads shall have sufficient weaving angle. In no case it shall be less than the space arrived at drawing a quadrant of a circle of 4.5m. radius at the edge of the actual road lines leaving the width of pedestrian walks (foot path) and the plot boundaries shall be rounded of by drawing a quadrant of the circle of 2.7m radius at the edge of plot boundaries (see figure). It can also be provided but cut in place of rounded corners is to be determined by the Authority.
70.2Commercial Business and Industrial-The maximum length permissible for different classification of roads in areas other than residential shall be as indicated in Table 24. No roads in these areas shall be less than 12m in width.Table -24: Minimum road widths for sub division in commercial and industrial area
Class of Road Width (m) Maximum length permissible (m)
1 12 200
2 18 600
3 24 Above 600
The width of the Master Plan roads shall be as per the width prescribed in the Master Plan.Alleys: Alleys shall be provided in commercial and industrial areas except where Authority may relax this requirement or when assured provision is made for service access such as off street loading/unloading and parking coexistent with and adequate for the use provided. The width of alleys where provided shall not be less than 6m. and no dead end alleys shall be permitted unless provided with an adequate turn around facilities.Junctions: The layout shall be provided at the junctions of roads in such a way that as far as possible all roads do meet at right angle, roads meeting at less than 45° shall not be permitted unless adequate arrangements for the circulation of traffic with desirable weaving length is available.
70.3Sub-division Bye-Laws for plots in Built-up area.-The sub-division of plots in existing built-up areas, in which the greater part has been developed as a business, industrial or residential area and which has been provided with all essential facilities like roads, water supply, sewerage, electricity etc. the norms as laid down in these Bye-law shall apply.
70.4If the area to be sub-divided is less than I acre or 0.4 hectare than the minimum width of roads and access ways for internal development shall be 6m. In case the plot faces a road less than 6m. in width, then the plot boundary at the front shall be set back, so that the distance from the centre line of road to the new plot boundary is not less than 3m.Note: If the area to be sub-divided is more than 1 acre in that case, the layout has also to be accorded by the concerned committee authorized by the Authority. If the area to be sub-divided is more than 1 acre or 0.4 hectare, then the minimum width of roads and access ways for internal development shall be 7m. and shall be further subjected to the provisions of bye-law. In case the plot faces a road less than 7m in width, then the plot boundary at the front shall be set back, so than the distance from the centre line to the new plot boundary is not less than 3.5m.

71. Area for development.

- 71.1 Apart from the provision for amenities and open spaces, the area for residential development shall be up to maximum of 50% of the total land area.

72. Park and Open Spaces.

- 72.1 Parks and open spaces shall not be less than 10% of the total land area. This shall be relinquished to the Authority and if required, the Authority may handover area over for maintenance to the residents welfare association or owner or developer. If the site is not utilized for which it is leased out within a prescribed period, it will be resumed back to the Authority.

73. Community facilities.

- 73.1 Community facilities shall be provided minimum 10% of the plot area.

74. Exemptions.

- 74.1 In case of developable area for residential development is less than 50% by providing for Master Plan roads or any other road or due to statutory reasons, prescribed by the Authority in a layout, the applicant may be exempted from complying with civic amenities reservation.
74.2For layout over 10.0 ha, commercial land uses such as Business offices, shopping complexes and Retail up to 2-3% may be permitted, subject to provision of separate access.
74.3For residential development upto 0.30 hectare of land, the requirement of open space may not be insisted on.

75. Submission of layout plan.

- 75.1 The layout plan may be submitted for approval to Authority by the signature of the members of the concerned Society in lieu of Secretary/president of the society. Even a single member of the Society may apply with his signature, if he is authorized by all the members of the society for doing the same.

76. Incentive for solar heating & lighting and waste water recycling.

- Duly admissible incentive for installing Solar Heating, Lighting and Waste Water Recycling may be given by the Authority after assessing the installation.

Chapter IX
Compounding, Penalties and Compliance

77. Restriction on Compounding.

- 77.1 Any deviation pertaining to unauthorized development shall not be compounded;7.1.1Where construction has been undertaken on Government land or land belonging to local body or land not owned by the person undertaking such development;77.1.2Where development has been undertaken un-authorized within the prohibited limits of any ancient or archaeological monuments.77.1.3Where such developments interfere with the natural drainage of the locality;77.1.4Where development has been undertaken un-authorized over the area earmarked/approved for parking; and,77.1.5Where road or drain whether public or private, whether constructed or natural, has been encroached.77.1.6Where number of floors has been increased from permissible limit/sanctioned map.
77.2Subject to the provisions contained in sub bye law, the Authority shall have the power to determine such other circumstances under which compounding may be prohibited.
77.3The Authority may, either before or after the institution of the proceedings under the provisions of the Act compound any offence:
77.3.1Where development has been undertaken without permission, but within the framework of use restrictions and the provisions of these bye laws applicable to the concerned plot;
77.3.2Where development has been undertaken in deviation of the approved plan, but within the framework of the use restriction and the provisions, norms, and stipulations of these bye laws; and
77.3.3The Authority may however compound deviations beyond the permissible norms of these bye laws up to 10% in respect of side, front and rear setbacks, 10% in respect to FAR and 10% in respect to height. Any deviation beyond the compoundable limit of 10% or addition of extra floor will not be allowed and will be subject to demolition of the offending areas/part of the building. The owner/builder shall carry out the demolition and take all precautions to ensure the structural safety of the remaining part of the building and ensure that no damage is caused to life and property in any way.

78. Compounding Rate.

- 78.1 Compounding Rates for various categories shall be as per Table- 25;Table 25: Compounding rates
Sl. Situations Compounding fees (in Rs.) per sqm. for theviolated area
Residential/Institutional Others
1 Where development has been undertaken withoutpermission, but within the framework of use restrictions and theprovisions of the Bye laws applicable to concerned plot 10000 15000
2 Constructions beyond permission but within thelimit of 10% as mentioned as in section-77.3.3 in bye-laws of thegross areas on all floor thus in violation beyond the permittedsetback line or beyond the permissible limit of FAR 15000 25000
For Height deviation additional compounding fees shall be levied @ Rs. 2500 per sqm. on the area of the top most floor which height is increased.Note:- Where development has been undertaken in deviation to the approved plan. but within the framework of use, restriction and the provision of norms and stipulations of these Bye-Laws. Fees as the provision made in sub-section-9.7.3.

79. Compounding amount.

- 79.1 At least 50% of the compounding amount shall be utilized for development of public utility services and protection of heritage sites and structures.

80. System for monitoring.

- 80.1 A system for monitoring shall be put in place by all authorities to ensure that the Bye laws are followed and prompt action shall be taken in case of violation of these bye laws.

81. Telecom Tower Permission.

- 81.1 Telecom Tower Permission with appropriate fees, should be obtained from the authority before erection on prescribed forms with certificate for structural safety from the competent Engineer. An application form for the erection of telecom/phone tower for obtaining N.O.0 from Authority on form Annexure-IV. Fee shall be as per Jharkhand Communication Tower and Related Structure Policy, 2015. NOC shall be issued within maximum 60 days from date of application if relevant papers in order. Certificate of permission/NOC and related indemnity bond format shall be as per above mention policy, subject to approval from Airport Authority as and where required.Chapter - X E-Governance and Service Delivery

82. E-Governance.

- 82.1 The State Government shall set up an integrated E-Governance system to be used by all the authorities. All the applications and the associated documents to be submitted to the various authorities under these byelaws shall be submitted through the E-Governance system.
82.2All notices shall be issued through the E-Governance system.
82.3The E-Governance system shall have an inbuilt reminder mechanism to approve applications wherever provisions have been made for approval within a specified time limit under these bye-laws.
82.4The E-Governance system shall periodically, generate reports of occasions where the Authorities have failed to perform their statutory duties within the prescribed time. The Authorities shall with their comments forward these reports to the State Government at periodic intervals specified by the State Government.
82.5Single Window Clearance shall be facilitated through E-Governance system.
82.6The contents of various forms used in this Bye-laws may be added/modified for the purpose of "Ease of Doing Business" and or digitization/computerization/in process of installation of online approval system.Chapter - XI Affordable Housing

83. "Affordable Housing Project".

- shall mean housing projects where 35% of the houses are constructed for EWS/LIG category.
83.1"Affordable Housing Units" shall mean dwelling units for EWS and LIG households only;
83.2Economically Weaker Section (EWS): EWS households are defined as households having an annual income up to Rs.3,00,000 (Rupees Three Lakhs) or state shall have the flexibility to re-define the annual income criteria as per local conditions in consultation with the Centre.
83.3EWS House : An all-weather single unit or a unit in a multi-storied super structure having carpet area of up to 30 sqm. with adequate basic civic services and infrastructure services like toilet, water. electricity etc.
83.4Affordable housing shall consist of row houses, stand alone and multi storied low rise and high rise building.
83.5No Affordable Housing shall be permissible on plots of area less than 1500sqm.
83.6In order to facilitate affordable housing following deviations from Jharkhand Building Bylaws shall be permitted.
83.7Means of access
Length of road limitation
Sl. Maximum Length of the road in Meter Minimum width of road of street in Meter(Inclusive of passive Development)
(i) (ii) (iii)
1 Upto 100 m 3.6 meter 5.1
2 Exceeding 100 meter and upto 300 meter 4.5 meter 6.6
3 Exceeding 300 6.6 meter 7.5
83.8Minimum setbacks and height of residential buildings
Sl. Average Depth of plot (In meters) Building height Upto G+2 Maximum-10m Building Height Upto G+3 Maximum-12m Building Height Upto G+4 Maximum-15m
Minimum Front set back (m) Minimum Rear set back (m) Minimum Front set back (m) Minimum Rear set back(m) Minimum Front Rear set back(m) Minimum set back (m)
(i) (ii) (iii) (iv) (v) (vi) (vii) (viii)
1 Exceeding 15m & upto 33m 3.0 1.8 3.0 2.0 3.0 2.0
2 Exceeding 33m & upto 45 m 4.0 3.0 4.5 3.0 4.5 3.5
3 More the 45m 4.0 3.0 4.0 4.0 5.0 5.0
83.9Minimum side setbacks for residential buildings
Sl. Average Width of plot (In meters) Building Height Upto G+2 Maximum-10m Building Height Upto G+3 Maximum-12m Building Height Upto G4-4 Maximum-15 m
(i) (ii) (iii) (iv) (v) (vi) (vii) (viii)
3 Exceeding 15m & upto 27m 1.5 1.5 1.5 1.5 2.0 2.0
5 Exceeding 27m & upto 39m 2.0 2.0 2.5 2.5 3.0 3.0
7 Exceeding 39m & upto 45m 3.0 3.0 3.60 3.60 4.50 4.50
8 More the 45m 3.60 3.60 4.00 4.00 5.00 5.00
83.10Minimum exterior open spaces around the buildings for all type of high rise buildings unless otherwise specified
Sl. Height of the Building Upto (m) Exterior open spaces to be left out on allsides in m.
(front setback) Side and back
1 More than 15 and upto 18 6.5 4.5
2 More than 18 and upto 21 7.0 4.5
3 More than 21 7.5 4.5
83.11Distance between the blocks shall not be less than 1/4th the height of the building subject to minimum 4.5 meters.
83.12Parking:EWS: car parking for 50% of the units, balance 2 wheeler parkingLIG & MIG: car parking for 100% of the units
83.13FAR permissible - 3.5
83.14All Projections for Balcony shall not be part of Carpet Area and FAR.
83.15Affordable Housing shall be within following criteria-
86.15.1EWS - Carpet Area- 30sqm.
86.15.2LIG - Carpet Area- 60sqm.
83.16Norms for Solar power and solar water heating shall not be applicable.
83.17Minimum Specification of Affordable Housing shall be as follows-
    EWS LIG
Flooring and Skirting (100mm-ht) Living Room Dining Room Kitchen Bed RoomVerandah Balcony Passages Lobby Ceramic Tiles (300mm x 300mm) Ceramic Tiles (300mm x 300mm)
Flooring Toilet Anti Skid Ceramic Tiles(300mm x300mm) Anti Skid Ceramic Tiles (300mm x300mm)
Wall Tiles/Dado Kitchen 600mm height on platform Ceramic wall tiles (300mm x 200mm) Ceramic wall tiles (300mm x 200mm)
  Toilet 2000mm height Ceramic wall tiles (300mm x 200mm) Ceramic wall tiles (300mm x 200mm)
Staircase Floor and skirting(100mm) Kota/marble/concrete paver/mosaic tiles Kota/arble/concrete paver/mosaic tiles
Parking floor   Paver Tiles Paver Tiles
Wall work External (200mm thick) Red Bricks/Conc. Hollow Blocks/Flyash Bricks Red Bricks/Conc. Hollow Blocks/Flyash Bricks
  Internal (150/100mm thick) Conc. Hollow Blocks Conc. Hollow Blocks
External Plaster   20mm thick cement Plaster in 1:4 with properwaterproofing 20mm thick cement Plaster in 1:4 with properwaterproofing
Internal Plaster   12/15 mm thick cement Plaster in 1:6 12/15 mm thick cement Plaster in 1:6
Kitchen Platform Width approx 525mm Kota Stone with Stainless Steel sink Polished Granite Stone with Stainless Steel sink
Windows   2 track Aluminium Anodised with 4mm thick glass 3 track Aluminium Anodised with 2 track -4mmthick glass and and I track stainless steel mosquito mesh)
Doors External-30mm thick Internal-25mm thick Wooden Commercial Flush Doors Wooden Commercial Flush Doors
Sanitary ware   White Vitrified/porcelain White Vitrified/porcelain
CP Fittings   As per ISI Mark As per ISI Mark
Plumbing   PVC/uPVC/cPVC Pipes PVC/uPVC/cPVC Pipes
External Paint   Cement Based Paint Cement Based Paint
Internal Paint   Oil bound distemper over a coat of Plaster ofParis Oil bound distemper over a coat of Plaster ofParis
Electrical   Electrical work with copper wires in concealedPVC conduits, Provision shall be made for sufficient lighting andpower points. Required switches and sockets, telephone and TVpoints. Each bedroom shall have min 3 Nos-5 Amp points and 1No-15 Amp point, MCB as required Electrical work with copper wires in concealedPVC conduits, Provision shall be made for sufficient lighting andpower points. Required switches and sockets, telephone and TVpoints. Each bedroom shall have min 3 Nos-5 Amp points and 1 No-15 Amp point, MCB as required
Hardware Fittings   Aluminium fittings including Aldrop, tower bolt,handles as per ISI fittings Aluminium fittings including Aldrop, tower bolt,handles as per ISI fittings
Water Supply   Deep Bore wells/Shallow wells/Municipal supplylines through Overhead tanks Deep Bore wells/Shallow wells/Municipal supplylines through Over head tanks
83.18General Building Requirements for Low Income Housing As per 1.S.8888-1978.
Sl No. Component of Building Requirements
3.1 Habimhle Room(i) In case of oneroomed house including space for cooking(ii) Two roomed house(iii) Height in case of sloping roofs AreaWidthHeightAreaWidthHeightAvg. heightMtn. height at eaves) 2.5 sq.mt2.4 mt.2.6 mt.6.5 sq.mt2.1 tnt.2..6 mt.2.6 mt2.0 nu.
3.2 Kitchen(i) Cook mg alcovesewing as cooking space(ii) Two room-d house AreaWidthHeightAreaWidthHeight 2.4 sq.mt1.2 mt.2.4 mt.3.3 sq.mt1.5 mt.2.4 mt.
3.3 Bathroom AreaWidthHeight 1.2 sq.mt1.0 mt.11 mt.
3.4 W.O. AreaWidthHeight 0.9 sq.mt0.9 mt.2.2 mt.
3.5 Combined bath and W.O AreaWidthHeight 1.2 sq_mt1.0 mt.2.2 mt.
3.6 Balcony Min. width 0.9 m
3.7 Staircase(1) 2 storeyed -Straight Flight Winding(ii) 3 storeyed or more Strait Flight Winding WidthWidthMin. treadMax riserWidthWidthMin. TreadMax riser 0.60 mt. (min)0.75 mt. (min)22.5 cm.20.0 cm.0.75 mt.. (min)0.90 int_ (min)25.0 cm.20 0 cm.
Notes :-i) die minimum clear head room:bail be 2.1 rat.
3.8 Plinth Min. height 30 cm from the surrounding groundlevel
3.9 Lighting and Ventilation (a) one - tenth ofthe room floor area for dry hot climate(b) one sixth of the room floor area for wet-hotclimate
Chapter - XII Savings/Repeals and Interpretation

84. Repeal and Savings.

- 84.1 The Jharkhand Planning Standards and Building Bye Laws 2002 with all its amendments, any other building byelaws framed under Mineral Area Development Authority Act Industrial Area Development Authority Act and associated executive orders are hereby repealed.
84.2Notwithstanding such repeal, anything done or any action taken under the bye laws so repealed shall be deemed to have been done or taken under these bye laws;

85. Interim Development Plan.

- 85.1 The Authority may prepare Interim Development Plans (IDP) for newly included development areas including rayati land within a reasonable time frame so that development may not be held up in the name of pendency of Interim Development Plan. Where such IDP has not been prepared, the general provisions of these bye laws shall apply without any zonal restrictions.
85.2The Authority shall ensure that resources for land acquisition and cost of land are mobilized or are likely to be mobilized within the time frame projected for implementation of such Interim Development Plans.

86. Applicability of National Building Code.

- 86.1 Where no express provision has been made in respect of any matter connected with planning and building standards by the Act, the Rules, the Development Plan, the Town Planning Schemes, or these Bye laws or by any resolution of the Authority, the provisions of the National Building Code of India shall be mutatis mutandis.
86.2Words and expressions used in these bye laws, but not defined, shall have the same meaning as respectively assigned to them in the Act or respective Rules and the National Building Code of India, 2005 amended from time to time.

87. Prior Commitments.

- If any Department of Government/Statutory Authority has given any commitment for a project under PPP with the prior approval of Government, but the building plan of such project has not yet been approved by the Authority as on date of enforcement of these Bye laws, such commitment shall be treated to be made under these Bye laws.

88. Decision of the Government to be final.

- In case of any dispute in interpretation of these bye laws, the decision of the State Government shall be final.

89. Relaxation and modification by the Government.

- The Authority may recommend to the Government for relaxation/modification of any of the clauses of these Bye laws in the general interest of the public pertaining to projects/schemes developed by the Government agencies and the decision of the Government in this regard shall be final.A Building Bye Laws Review Committee shall be constituted by the Urban Development and Housing Department for periodic review and reconsideration and necessary modification of these Bye Laws.Annexure-IQulification, Experience & Competence of Technical Person and Builder

1.

) Architect. - A) Qualification & Experience:-The minimum qualification for an Architect shall be bachelor Degree in Architecture or equivalent, and registered with the Council of Architecture and not in arrears of subscription.B) Competence:- The Architect shall be competent to carry out the work related to the building permit as given below and shall be entitled to submit:i) All plans and information connected with the building permit subject to section-16.3.1ii) Certificate of supervision and completion of all buildings,iii) Preparation of sub-division/layout plans and related information connected with development permit of area upto 4 hectare.iv) Certificate of supervision for development of land area up to 4 hectare.C) Duties & Responsibilities:- i) He/She shall be responsible for making adequate arrangements to ensure not only that the work is executed as per the approval plans but also in conformity with the stipulations of the National Code, 2005 and the BIS standards for safe and sound construction non-hazardous, functioning of the services incorporated in the building and for making adequate provision for services and equipment for protection from the fire hazards as per the stipulations of the National Building Code, 2005 in the buildings.D) Registration Fee:- Architects registered under the Council of Architecture Act 1972 shall be entitled for a registration as a licensed technical personnel of Authority without paying any licensing annual fees for the same. This shall not be binding on registration of an Architect engaged for any specific purpose. However if they desire to be enrolled as lifetime licensee of the Authority , a lump sum payment of Rs. 1000/-(One Thousand) shall have to be made to the Authority as a fee for such enrollment, so that Authority may be able to intimate them by post from time to time about the provisions of planning standards and building byelaws and other relevant information with amendments (if any ) in rules and byelaws of the Authority. But In case an architect enrolled as Authority licensee, violates any of the rules, regulations, byelaws and/or planning standards of Authority, for the time being in force , his enrolment in authority shall be cancelled and the enrollment fee of Rs. 1000/- charged initially from him shall be forfeited

2.

) Engineer. - (A) Qualification and Experience:-The minimum qualification for an Engineer shall be Degree in Civil Engineering or equivalent. The qualification for licensing of Engineer will be corporate membership (Civil) of the Institution of Engineers or such Degree or Diploma in Civil or Municipal or Structural Engineering which make him eligible for such membership. of which is recognized by Union Public Service Commission for the post of an assistant Engineer.
(B)Competence:- The Licensed Engineers shall be competent to carry out the work related to the building permit given below and shall be entitled to submit:
i) All plans and information connected with building permit. Subject to section-16.3.2ii) Structural details and calculations of buildings on plot up to 500 square meters and up to three storied structure excluding basement/stilt.iii) Certificate of supervision and completion for all buildings.iv) Preparation of all service plans and related information.v) Issuing certificate of supervision for development of land for all area.C) Duties & Responsibilities:- i) He/She shall be responsible for making adequate provision as per the approval plans but also is in conformity with the stipulations of the National Building Code 2005 and the BIS standards for safe and sound construction non-hazardous, functioning of the services incorporated in the building and for making adequate provisions for services and equipment for protection from the fire hazards as per the stipulations of the National Building Code of India in the buildings.ii) If he/she is found negligent in his/her duties and responsibilities the Authority may black-list an Engineer in case of serious defaults or repeated defaults The registration shall be liable to be revoked temporarily or permanently by the Authority in such cases of negligence and default.D) Registration Fee:- The fees for this purpose shall be Rs. 5000/- for one calendar year and it may be renewed in next calendar years by paying Rs. 1000/- to the Authority. But In case an engineer enrolled as Authority licensee, violates any of the rules, regulations, byelaws and or planning standards of Authority, for the time being in force, his enrolment in authority shall be cancelled and the enrollment fee of Rs. 1000/- charged initially from him shall be forfeited.

3.

) Structural Engineer. - A) Qualification & Experience:-The minimum qualifications for a structural engineer shall be degree in Civil Engineering/fellow of the Intuition of Engineers (India) or equivalent degree in Civil Engineer from recognized foreign institution, with 5 year experience in structural engineering practice.Note - 5 years experience shall be relaxed to 2 year in the case of Post Graduate degree in Structural Engineering/higher qualification.B) Competence:- The licensed structural Engineers shall be competent to prepare the structural details and calculations for all buildings and undertake supervision. In case of buildings having special structural features, as decided by the Authority, which are within the horizontal areas and vertical limits specified in Annex A of Part-11, A-2.2.1(b) and A-2.4.1(a) of NBC 2005 they shall be designed only by structural engineers.C) Duties and Responsibilities:- i) To prepare a report of the structural design.ii) To prepare detailed structural design, drawings and specifications and to prescribe the method and technique of its execution strictly on the basis of the National Building Code or relevant BIS specifications.iii) To supply copies of structural drawings to the site supervisor.iv) To inspect the works at all important stages and certify that the work being executed is up to the satisfaction of the Architect.v) To certify the structural safety and overall structural soundness of the building to the Architect.vi) To advise the Owner/Architect/Engineer for arranging for tests and their reports for soil, building material etc. for his evaluation and design consideration.vii) To prepare the revised calculations & drawings in case of any revision with reference to the earlier submission of drawing and design in a particular case.viii) To submit the certificate of structural safety and over all structural soundness of building to Authority.xi) In case of multistoried buildings and buildings of a special nature as identified by the Authority from time to time, the structural Calculations/Drawings shall be got vetted by Indian Institute of Technology/National Institute of Technology or any organization empanelled by the State Disaster Management Authority or the Building Construction Department.D) Registration Fee :- The fees for this purpose shall be Rs. 5000/- for one calendar year and it may be renewed in next calendar years by paying Rs. 1000/- to the Authority. But In case an structural engineers enrolled as Authority licensee, violates any of the rules, regulations, byelaws and/or planning standards of Authority, for the time being in force, his enrolment in authority shall be cancelled and the enrollment fee of Rs. 1000/- charged initially from him shall be forfeited.

4.

) Town Planner. - Qualification & Experience:-The minimum qualification for a town planner shall be recognized Post Graduate Degree/Diploma in Town Planning and registered membership of ITPI and not be in arrears of subscription.B) Competence:- The licensed town planner shall be entitled to submit:i) All plans and related information connected with development of land of all areas including integrated township.ii) Certificate of supervision for development of land of all areas.C) Duties and Responsibilities:- He/she shall be responsible for making adequate arrangements to ensure not only that the work is executed as per the approved plans but also is conformity with the stipulations of the National Building Code, 2005 and the BIS standards for safe and sound construction non-hazardous, functioning of the services incorporated in the building and for making adequate provisions for services and equipment for protection from the fire hazards as per the stipulations of the National Building Code of India 2005.D) Registration Fee :- The fees for this purpose shall be Rs. 5000/- for one calendar year and it may be renewed in next calendar years by paying Rs. 1000/- to the Authority. But In case an Town Planner enrolled as Authority licensee, violates any of the rules, regulations. byelaws and/or planning standards of Authority, for the time being in force, his enrolment in authority shall be cancelled and the enrollment fee of Rs. 1000/- charged initially from him shall be forfeited.

5.

) Supervisor/draftsman. - A) Qualification and Experience:-The minimum qualifications for a supervisor shall be recognized Diploma in Civil or Architecture, or Draftsmanship in Civil or Architectural Assistant ship plus 2 years experience in building design, construction and supervision.B) Competence:- The licensed supervisor/Draftsman shall be entitled to submit:i) All plans and related information connected with building permit for residential buildings on plot up to 100 sq. m. and up to two storeys,ii) Certificate of supervision for buildings as per (i).C) Duties and Responsibilities of Supervisor:- i) To adhere strictly to the architectural and structural drawings/specifications and written instructions of the structural Engineer and Architect/Engineer.ii) To follow the provisions of NBC, 2005 or BIS specifications as regards materials, components, quality control and the process of construction.iii) To bring to the notice of the structural Engineer and Architect/Engineer/any situation or circumstances which in his opinion are liable to endanger the safety of structure.iv) He shall be in charge of site and responsible for supervision of the work.v) He shall ensure that all the works under his charge are carried out in conformity with the approved drawings and as per the details and specifications supplied by the Architect/Engineer.vi) He shall take adequate measures to ensure that no damage is caused to the work under construction and the adjoining properties.vii) He shall also ensure that no undue inconvenience is caused in the course of his work in the people in neighborhood.D) Registration Fee - The fees for this purpose shall be Rs. 2000/- for one calendar year and it may be renewed in next calendar years by paying Rs. 500/- to the Authority. But In case an Supervisor/Draftsman enrolled as Authority licensee, violates any of the rules, regulations, byelaws and/or planning standards of Authority, for the time being in force, his enrolment in authority shall be cancelled and the enrollment fee of Rs. 1000/- charged initially from him shall be forfeited.

6.

) Group Agency - i) When any Group or Agency comprising of qualified Architect/Engineer/Town Planner is practicing, then the qualifications and experience, competence, duties and responsibilities and registration will be the combination of individual qualification and experience, competence, duties & responsibilities and registration as provided in Schedule lto5.ii) The Authority may also empanel public undertaking/agencies engaged in development work for quick execution of Government/Private projects within its jurisdiction.Registration Fee. - The fees for this purpose shall be Rs. 10000/- for one calendar year and it may be renewed in next calendar years by paying Rs. 2000/- to the Authority. But In case an Group Agency enrolled as Authority licensee, violates any of the rules, regulations, byelaws and/or planning standards of Authority, for the time being in force, his enrolment in authority shall be cancelled and the enrollment fee of Rs. 1000/- charged initially from him shall be forfeited.

7.

) Builder. - A) Qualification:-i) A person/firm engaged in construction activities/building activities in an urban area.ii) A person or group of persons having qualification of Civil Engineering, Architecture and Town Planning.iii) The Authority may classify the builders into different categories considering their experience, expertise and annual turnover.B) Registration/Renewal:- i) Registration of builders shall be done by the Authority. The registration shall be done in the prescribed form. The registration shall be valid for one calendar year and shall be renewable annually. The fee for initial registration of a builder shall be Rs. 75000/- and the renewal fee shall be Rs. 15000/- An application form for the registration of builders will be as follows:-Form of Application For Registration of Builder
Paste passportsizecolour photoof applicant
Attach one more colour passportphoto of applicant with application
1 Name of the applicant (Builder/Firm/Developer) :-  
2 Address of Applicant, issued by the officer, not below therank of Civil SDO/SDM :-  
  (a) Local Address :-  
  (b) Permanent Address :-  
3 Academic/Technical Qualifications :-  
  (a) Builder/Developer :-  
  (b) Name, Address and Technical Qualification of EngineerAssociated with the builder/developer(Engineer should haverecognized Degree/Diploma and 3 years minimum experience in civilbuilding construction work). :-  
  (c) Name, Address of Architect and Technical qualification(Architect associated with builder/developer should have Degreefrom recognized institution with 3 years minimum experience incivil building Planning work) :-  
4 Service Tax Registration Number and Latest return of serviceTax In case of new builder/developer, Service Tax registrationmust be submitted by him within 3 months from the date of makinginvestment in construction of Building/Apartment etc. :-  
5 Current year Income tax return (Certified copy to be attached) :-  
6 Affidavit to be submitted at the time of registration by theBuilder/Developer that he would submit Labour License either inhis own name or in the name of Labour Supplier employed by theBuilder for construction of that specific project within 3 monthsfrom the date of start of construction of the project :-  
7 Work Experience in Civil Construction work (if any) :-  
8 (a) If Building Construction has been done by the applicant,mention the B.C. No. and Passing Authority with details. :-  
  (b) Year of Building Construction :-  
  (c) Name of Land Owner/Building Owner if the Land/Builder isnot belonging to Builder/Developer by self and certified copy ofMutual contract/agreement to be attached for construction of theBuilding/Apartment over that land :-  
9 Character Certificate issued by the DeputyCommissioner/District Magistrate of period not earlier than 6months :-  
10 Is any unauthorized construction case pending after theconstruction of the sanctioned building plan (If yes, mention itsfull details, Name of the Authority/Court, case no. and presentstatus of case) Information to be submitted by affidavit. :-  
11 Annual Turn Over of not below 50 lacs rupees duly Audited byChartered Accountant for the last three years. (Certified copy tobe attached) :-  
12 Details of the Movable and Immovable Property to be supportedby affidavit containing that the concerned Developer/Builder ishaving property of value not below than 50 lacs rupees. :-  
13 Is applicant registered for work in any department? (If yes,mention full details with Registration No.) :-  
14 Details of Registration fee by way of DD payable in favour theAuthority. For Rs. 50,000/-in case of new registrationRs. 10,000/- in case of renewal. :-  
  Cost of Application Form 1250.00 Only (Non-Refundable)   Full signature of applicant with Date
C) Responsibilities:- i) He/She/Firm shall engage a qualified Architect/Engineer/Town Planner to prepare plans, designs, drawings and specifications for execution of the works in accordance with the requirements of these bye laws.ii) He shall not cause or allow any deviations from the approved drawings in the course of the execution of the project and shall bear responsibility for any irregularity committed in the use and function of the building or its parts for which the approval has been obtained.iii) He shall not commence the use of building or shall not give the possession to occupy the building to any one before obtaining the occupancy certificate from the Authority.v) He shall provide adequate safety measures for structural stability and protection against fire hazards likely form installation of services like electrical installation, plumbing, drainage, sanitation, water supply etc. whenever required under the bye laws.vi) He shall provide adequate for safety and welfare of the construction workers at the construction site as required by labour laws.vii) He shall submit the completion certificate and obtain occupancy permission from the Authority.viii) He shall explain the construction/design and its intended use as per approved plan, to the prospective purchaser of the premises under construction.

8.

) Contractor. - A) Qualification:-i) A person/firm engaged in construction activities/building activities in the State of Jharkhand/India.ii) Availability ()f-a) Ownership/proof of hire/lease.b) Equipment/key technical personnelc) Credit facility/liquid assets.d) Bidding capacity of project.ii) Any other relevant criteria required as per Standard Bidding Document (SBD) of the project.iii) Registration with the BCD of Government of Jharkhand or C.P.W.D. or public sector undertakings.Annexure-IIGuidelines for installation of solar water heating system - 1. Installation of Solar Assisted Water Heating System in Buildings: to ensure the implementation of the guidelines issued by ministry of non-conventional energy sources on accelerated development and deployment of solar water heating systems in domestic, industrial and commercial sectors. No new building in the following categories in which there is a system of installation for supplying hot water shall be built unless the system of the installation is also having an auxiliary solar assisted water heating system:-i) Hospitals and Nursing Homeii) Hotels, Lodges, and Guest Houses, Group Housing with the plot area of 4000 sq m.iii) Hostels of Schools, Colleges and Training Centres with more than 100 Students.iv) Barracks of armed forces, paramilitary forces and policev) Individual residential buildings having more than 150 sq m. plinth areavi) Functional Buildings of Railway Stations and Air Ports like waiting rooms, retiring rooms, rest rooms, inspection bungalows and catering unitsvii) Community Centres, Banquet Halls, Barat Ghars, Kalayana Mandaps and buildings for similar use.A. Definitions
(i) "Solar Assisted Water Heating System A device to heat water using solar energy asheat source.
(ii) "Auxiliary back up" Electricity operated or fuel fired boilers/systems to heat water coming out 'from solar water heating systemto meet continuous requirement of hot water.
(iii) "New Building" Such buildings of above said categories forwhich construction plans have been submitted to the Authority forclearance.
(iv) "Existing building" Such buildings, which are licensed to performtheir respective business.
B. Guidelines for Installation of Solar Water Heating System - i. New Buildings: Clearance of plan for the construction of new buildings of the aforesaid categories shall only be given if they have a provision in the building design itself for an insulated pipeline from the rooftop in the building to various distribution points where hot water is required. The building must have a provision for continuous water supply to the solar water heating system. The building should also have open space on the rooftop, which receives direct sun light. The load bearing capacity of the roof should at least be 50 kg. per sqm. All new buildings of above said categories must complete installation of solar water heating systems before obtaining necessary license to commence their business.ii. Existing Buildings: Installation of Solar Assisted Water Heating Systems in the existing building shall be made mandatory at the time of change of use to above said category provided there is a system or installation for supplying hot water.iii. Capacity: The capacity of solar water heating system to be installed on the building of different categories shall be decided in consultation with the local body. The recommended minimum capacity shall not be less than 25 It. per day for each bathroom and kitchen subject to the condition that maximum of 50% of the total roof area is provided with the system.iv. Specifications: Installation of Solar Assisted Water Heating System shall conform to BIS specification IS 12933. The solar collectors used in the system shall have the BIS certification mark.v. Auxiliary System: Wherever hot water requirement is continuous, auxiliary heating arrangement either with electric elements or oil or adequate capacity may be provided.

2. A separate guide lines shall be issued for installation of solar plant. solar power backup and metering system by the Urban Development and Housing Department.

Annexure-IIIMaximum Permissible FAR for Different ULBs
Sl. Name of ULB Maximum Permissible FAR
Residential Commercial
1 Ranchi Municipal Corporation As per Master Plan
2 Dhanbad Municipal Corporation & MADA Area 2.5 2.5
3 Chirkunda Nagar Panchayat 2.0 2.0
4 Giridih Nagar Parishad 2.5 2.5
5 Hazaribagh Nagar Parishad 2.5 2.5
6 Jhumritilya Nagar Parishad 2.0 2.0
7 Koderma Nagar Panchayat 2.0 2.0
8 Chas Municipal Corporation 2.5 2.5
9 Phusaro Nagar Parishad 2.0 2.0
10 Chatra Nagar Parishad 2.0 2.0
11 Bundu Nagar Panchayat 2.0 2.0
12 Gumla Nahgar Panchayat 2.0 2.0
13 Lohardaga Nagar Parishad 2.0 2.0
14 Simdega Nagar Parishad 2.0 2.0
15 Khunti Nagar Panchayat 2.0 2.0
16 Ramgarh Nagar Parishad 2.0 . 2.5
17 Dumka Nagar Parishad 2.5 2.5
18 Basukinath Nagar Panchayat 2.0 2.0
19 Deoghar Municipal Corporation 2.5 2.5
20 Madhupur Nagar Parishad 2.0 2.0
21 Godda Nagar Panchayat 2.0 2.0
22 Pakur Nagar Panchayat 2.0 2.0
23 Sahebganj Nagar Parishad 2.0 2.0
24 Rajmahal Nagar Panchayat 2.0 2.0
25 Mihijham Nagar Parishad 2.0 2.0
26 Jamtara Nagar Panchayat 2.0 2.0
27 Chaibasa Nagar Parishad 2.0 2.0
28 Chakaradharpur Nagar Parishad 2.0 2.0
29 Jamshedpur NAC 2.5 3.0
30 Mango NAC 2.5 3.0
31 Jugsalai Municipality 2.5 3.0
32 Chakuliya Nagar Panchayat 2.0 2.0
33 Saraikela Nagar Panchayat 2.0 2.0
34 Adityapur Nagar Parishad 2.5 3.0
35 Medininagar Nagar Parishad 2.5 2.5
36 Hussianabad Nagar Panchayat 2.0 2.0
37 Vishrampur Nagar Panchayat 2.0 2.0
38 Garhwa Nagar Panchayat 2.0 2.0
39 Nagar Untari Nagar Panchayat 1.5 1.5
40 Manjhiaon Nagar Panchayat 1.5 1.5
41 Latehar Nagar Panchayat 1.5 2.0
42 Ranchi Regional Development Authority. Ranchi As per Master Plan
Note: - (1) For other occupancy the FAR value shall be as per these Bye-laws.
(2)The FAR value may be altered/modified according to the respective up coming Master Plan of Towns. The Urban Development & Housing Department can altered/modified FAR value as and when required.Annexure-IVForm For Mobile Tower Permission
1 Name of the Firm -   Photo
2 Registration of the Firm -  
3 Details of land onwhich tower is to be installed (land related paper):(a) Photocopy of saledeed/lease(b) Photocopy ofKhatiyan(c) Photocopy ofMutation(d) Photocopy of Rent receipt -  
 
4 Land/Building Owner of Consent Paper/Agreement -        
5 Certificate satisfy that proposed tower shallbe able to carry wind pressure. -   {|
 
|
 
||-| 6| Proposed tower is not in a air traffic zone acertificate from Airport Authority has been attached for thesame.| -||
 
|
 
||-| 7| A certificate that the concern building iscapable of carrying load of the proposed tower.| -||
 
|
 
||-| 8| Photocopy of structural design of proposetower.| -|||||-| 9| Height of the proposed tower shall be measuredform ground floor of the building on which tower is going to beinstalled.| _| -------------------------------------------------------------------m|}
10 (a) If height is less than 40m. and outside 7km.than whether online application has been made or not. A oath withdetailing out that in case of any objection/rejection correctionmeasures shall be taken out by TSPs/IPs. OR -   {|
 
|
 
||-| (b) If height is above 40m. and under 7km. thena certificate of SACFA/Airport Authority of India is available ornot.|||
 
|
 
||}
11 Acknowledgement receipt has been enclosed ornot by TSPs/lPs in context of self certificate produced beforeTERM CELL of DOT with regard to EMR. OR -   {|
 
|
 
||-| Affidavit enclosed or not by TSPs/IPs incontext of self certificate produced before TERM CELL of DOTwith regard to EMR.|||
 
|
 
||}
12 Fee as per Jharkhand Communication Tower andRelated Structures Policy, 2015 for 8m. height/more than 8m.height (Non refundable). - Bank Draft No................................................... Name ofBank .................................................... Date......................................................
Annexure VInspection Checklist During the Construction
Construction Stage Element As Per Building Plan Remark
Yes No
Plan check All, specially structural calculation, firesafety, area of glazing      
Commencement Assessment of existing lintels, foundations,beams      
Trial Hole      
Check for encroaching trees, made up of ground,etc      
Access for tire service      
Foundation & Excavations Excavations (Depth/width, distance to tree &drain)      
Movement of Joints, anti-heave protection,clearance to drain      
Piling      
Steel Enforcement      
Ground Preparation for raft      
       
Basement/tanking Tanking for below ground walls & floor      
Retaining wall      
Over site Ground Floor preparation (hardcore etc.)      
Suspended timber ground floor preparation      
Pre cast concrete beams/floor (ventilation &DPC )      
DPC      
DBM      
Gas Protection - landfill, radon etc      
Floor insulation      
Site level for disabled access      
Drainage (before back fill) Sewer branches to the site      
Drainage laid prior to coverage      
Ground percolation's tests ( septic tanks and/orsoak-aways )      
Excavated Soak-away pits      
Exposure of main sewer      
Rerouting of main sewer/relocation of mainsewer      
Super Structure Frame-concrete reinforcement or steel or timber      
Floor joists and beams and connections      
Construction at first floor level. cg block workand wall ties      
Construction at 2"d and subsequent floorlevels      
Dormer framework prior to boarding over      
Roof timbers, restrains straps, bracing      
Roof breather membrane      
Staircase installed      
Vehicle Barriers/bay      
Super Structure Fire protection applied to structural members      
Cavity barriers/fire stopping      
Fire dampers and fire collars      
Means of escape      
Space separation & compartmentation      
Glazing      
Opening to conservatories etc      
Area of Glazing      
Thermal elements (cavity walls etc)      
Access      
Pre Plaster Sound insulation in walls, floors and stairs      
Insulation in walls and roof      
Bare walls, beams. lintels      
Fire door      
First fix electrical (dwellings only)      
Ventilation system      
Hygiene (sanitary convenience & washingfacilities - pipes etc )      
Completion Drainage water tightness test      
Internal lighting, appliance (CO2 emission rate(DER/BER)      
Heating system, incl thermostatic control      
Sound insulation test      
Gas tightness test to flues      
Electrical installations (dwellings only)      
Combustion appliance & fuel system storage      
Air leakage test      
Hygiene (sanitary conveniences & washingfacilities)      
Test of emergency lighting and fire alarms      
Annexurc VIForm For Completion CertificateI hereby certify that the erection, re-erection or material alteration in/of building No. .................................................................. or the development of land of Khesra no. .............................................................................. on/in Plot no ......................................................... City ............................................................................ has been supervised by me and has been completed on ....................................................................... according to the plans sanctioned, vide on ............................................................................... Dated ......................................................................... The work has been completed to my best satisfaction, the workmanship and all the materials (type and grade) have been used strictly in accordance with general and detailed specification. No provisions of the building Byelaws have been violated, no requisitions made, no conditions prescribed or orders issued there under have been transgressed in the course of the work. The building is fit for use for which it has been erected; re-erected or altered, constructed and enlarged. The land is fit for construction for which it has been developed or re-developed. I request that the occupancy certificate/development certificate for the premises may be issued.

1. Signature of Licensed ..............................................................................................

Architect/Engineer/TownPlanner/Draftsman/Group ..............................................................................................Name of Licensed Architect/Licensed Town/Planner/Draftsman/Group ............................................................................................................................................................................................ (in block letters)Address of licensed Architect/Engineer/TownPlanner/Draftsman/Group ................................................................................................................................................ Dated .............................................................................

2. Signature of the Builder/Owner/Applicant:

Name:Address:Date:Registration no.Note - In case the building has been constructed with deviation a statement of such deviation together with line drawings indicating the extent of deviation shall be submitted along with the completion certificate, duly signed by the technical personnel and the builder/owner/applicant.Annexure VIIForm For Occupancy CertificateI hereby certify that the erection, re-erection or alteration of building on ........................................................................................................................................................ or the ...................................................................................................................................... on in Plot on ................................................................................................................ in and sanctioned vide Plan case No. ............................................................................................................. Dated ............................................................................................... Colony .......................................................................................... Street ..............................................................................................................Mohalla/Bazar/Road ................................................................................................. City ........................................................... completed under the supervision of ......................................................................................................... Licensed Architect/Engineer/Draftsman/Group. License No. .................................................................................................................. has been inspected by me and I declare that building conforms in all respect to the requirements of the Bye-laws. It is certified that the building is fit for occupation.Signature of Authority ...............................................................................................................Office Stamp .................................................................................................................Office (Communication) No ........................................................................................................................... Name, Designation and address of Authority ........................................................................................ Date .........................................................................Annexure-VIIIInformation for Intimation of Completion of Work up to Plinth LevelTo,The .................................................................................................................................................................... Authority,Sir,The construction up to plinth/column up to plinth level has been completed in Building .................................................................................................... on/in Plot No .............................................................................................. Road/Street ........................................................................................................ Ward ............................................................................................ in accordance with your permission No. ........................................................................dated ................................................................................ and is in accordance with the sanctioned plan.Yours faithfully,Signature of Licensed Architect/Engineer/SupervisorName .............................................................(in Block letters)Address .................................................................................................................................................Registration No .....................................................Date .............................................................Signature of Builder/Owner/ApplicantName .............................................................(In Block letters)Address .............................................................Registration No .....................................................Date .............................................................Annexure-IXChecklist for Structural Safety
Item As Per Buildin Plan Remark by authorized representative
Yes No Non applicable Applicable
1) Structural Safety
 
1. Provide Design Basis Report as per thedocument          
2. Provide description of Sub-structure andSuper structure as per the format given in the Ref(5&6)enclosed.          
3. Provide brief Description of StructuralSystem with sketches, images of drawing. etc. with specific focuson Lateral load resisting system'.          
4. Provide brief note on modeling, software usedetc. Clear mention whether infill/partition wall is idealizedas part of lateral load system?          
5. Provide the height of building in meters.          
6. Provide plan dimensions of the building (mt xmt)          
EQ Loading Details
7. Provide following EQ loading details.          
a) Zone Factor          
b) Importance factor          
c) Response Reduction factor          
d) Soil Type          
e) % LL considered in seismic          
f) Time Period in the horizontal X- direction(sec)          
g) Time Period in the horizontal Z-direction(sec)          
h) Total Seismic weight (Sw) of building (kN)          
i) Static Base-shear in X-direction (as % of Sw)          
j) Static Base-shear in Z-direction (as % of Sw)          
k) Table of distribution for static base shear          
l) Max. deflection at roof level. (mm)          
m) Max. inter storey drift./Height          
Vertical Elements Details
8. Provide following data regarding VerticalElements.  
a) Size of maximum loaded column          
b) Gravity load on max. loaded column          
c) Axial stress in max. loaded column (Gravityloads)          
d) Grade of max. loaded column          
e) Axial settlement in max. loaded column          
f) Axial settlement in min. loaded column          
g) % Base-shear resisted by all columns along X(static)          
h) % Base-shear resisted by all columns along Z(static)          
Dynamic Analysis
9. Provide following data from Dynamic Analysis  
a) Total gravity load on floating column(provide table if there are multiple floating columns)          
b) Size and span of girders supporting floatingcolumns          
c) Number of floors supported by floatingcolumns          
d) Deflection of girder under column (frommodel)          
e) Deflection of girder under column (from s/saction)          
f) Specific details about floating columns oncantilevergirders (Refer Table below)          
10. Provide, if applicable, following data foreachcantilever.  
a) Cantilever span          
b) Structural system          
c) Nature of usage          
d) Maximum elastic deflection under gravityloads          
11. Provide stability calculations for upliftand overturning(model extract in case of model)          
12. Typical design calculations for footings          
13. Typical design calculations for RCC columnsComposite Columns          
14. Typical design calculations for RCC walls          
15. Typical design calculations for RC beams (OrSteel Beams)          
16. Typical design calculations for RCC Girders(Or Steel Girders/Truss)          
17. Typical design calculations for SteelBracings          
18. Provide a note on special provisionssuggested for the building (like dampers etc.)          
19. Soft copy of model including input andoutput.          
Provide following data from Dynamic Analysis
Modes Frequency Time Period in Sec X-Participation Z-Participation
Mode 1        
Mode 2        
Mode 3        
Mode 4        
Mode 5        
Mode 6        
Mode 7        
Mode 8        
Mode 9        
Mode 10        
Mode 11        
Mode 12        
Mode 13        
Mode 14        
Mode 15        
  Summation    
Provide Table for lateral deflections (mm) atTerrace Level in the following format.
Load Case Dxmax H/Dx Drift-x Dzmax H/Dz Drift-z
             
             
             
             
             
             
Provide Corner displacements (mm) forTorsional Irregularity(along x-direction) in the followingformat.
Load Case Corner- I Corner- 2 Corner-2 Corner-4 Avg - x %Max./Avg,
Eq-x            
WI-x            
Provide Corner displacements (mm) forTorsional Irregularity(along z-direction) in the followingformat.
Load Case Corner- 1 Corner-2 Corner- 2 Corner- 4 Avg - x %Max./Avg.
Eq-z            
WI-z            
Provide acceleration (mg) values in thefollowing format.
Eq-x Eq-z WL-x WL-z
       
Ref 5
Description of Sub-Structure
No. of basement  
Minimum clearance between outermost basementretaining wall and compound wall  
Has a Shoring system been installed ? Submitsectional detail of the shoring system  
Give details of methodology used to resistuplift pressure due to ground water for tower portion as well asthe portion outside the tower.  
Description of the foundation for the towerblock  
Nature of Foundation  
SBC assumed T/sq.mt.  
Sub-grade Elastic Modulus  
Intended Use of basements  
If rock anchors are used, arc they grouted afterinstallation and stressing?  
Is structural steel used in the construction ofthe sub-structure?  
If yes, what are the measures taken for its lireproofing and corrosion resistance?  
Whether Expansion/  
Separation joints provided?  
Whether expansion joint/separation jointcontinues through basement?  
If yes, detail at Basement level & retainingwall junction  
Ref 6
Description of Super Structure
No. of Floors & height of building in m  
Shape of Building, Plan, Elevation, WhetherSymmetric in Elevation  
Maximum plan dimension in either direction.in m.  
Ratio of plan dimension  
Typical Floor to floor height in in Maximumfloor to floor height in entire height of building in m.  
Aspect ratio ( Height of Building till Terrace/Minimum Dimension of Building)  
Type of floor slab  
Average thickness of floor slab in mm  
Whether column are RCC, Composite or Instructural steel  
Annexure-XConstruction Quality Checklist/Testing
The materials to be tested on site includecement, water, aggregates for concrete, bricks and stones, soilfor embankments, and aggregates for construction works. The listof materials to be tested on site is given in the Table 1 below.
Table 1 List of Materials Tested on Site
Material
Sl.No.  
1 Cement
2 Sand/Fine Aggregates.
3 Water for Construction Works (can be tested inapproved lab)
4 Bricks
5 Size Stone
6 Coarse Aggregate for Concrete Work
7 Soil/Earth/Sub-grade Material
8 Granular Sub-base (GSB) Material
9 Material for WBM/WMM
10 Metal for BM/DBM/BC/Surface Dressing/MSS/PremixCarpet
11 Binder for WBM
12 Fine Aggregate for DBM/BC
13 Lime
14 Borrow Material
15 Steel (to be procured directly form manufacturealong with test certificate
Annexure-XIChecklist of Occupancy
Item As Per Building Plan Remark by authorized representative
Yes No Non applicable Applicable
1. Number of floors          
Building height          
2.External Setbacks          
3. Building Line, if any          
4.Parking space provision          
5. Abutting road width          
6. FAR          
7. Coverage percentage          
8. Tree Cover          
9. Water harvesting structures          
10. Land if required to be surrendered          
11. Lift/s, water pumps and storage tanks          
12. Internal roads/paving          
13. Parking areas and external lighting          
14. Lightening arrestors          
15. Fire Fighting installations          
16. Lifts          
17. Water pump          
18. Drainage and arrangement for waste water andsewage disposal          
19. Copy of agreement with the apartment Owners'Association/Society          
20. Implementation of Life Safety provisions asmentioned in National Building Code 2005(Group-I Part-W Fire andLife Safety-4)          
21.NOC from Fire Service Department          
Quality Checklists for Building Works
Item As Per Building Plan Remark by authorized representative
Yes No Non applicable Applicable
1) Excavation & PCC
A. Pre Excavation
1. Construction Drawings          
indicating levels available at Site          
2. Proper safety precautions taken          
for site and public          
3. Precautions taken for dewatering          
and protecting site from flooding          
4. Dumping ground established          
Setting out and levels as per          
drawings          
5. Intermediate levels checked          
B. Post Excavation          
1. Characteristics of excavated strata          
noted and deviations informed          
2. Appropriate shoring and          
shuttering done          
3. Final excavation levels, surface          
inspected and approved          
4. Anti-Termite Treatment has been done postexcavation          
2) Plain Cement Concrete Works
A . Pre-concreting
1. All levels and dimensions checked forcorrectness          
2. Shuttering is as per plan and has no gaps inbetween          
3. All materials are of specified brand andgrade          
B. During Concreting
1. Mixing of concrete has been done as specified          
2. Slump and other tests carried out asspecified          
3. Slump and other tests carried out asspecified          
4. Required number of Samples have been takenfor carrying out slump tests, cube tests etc          
C. Post Concreting
1 Concreting has been done as per specified lineand level          
2 Curing has been done as specified          
3 Compaction has been done Properly          
4 Remedial measures taken for removal of defects          
3) Anti Termite Treatment (ATT)
1 Chemicals for ATT are as per Specifications          
2 Chemicals in use are within the expiry date.          
3 Sufficient quantities of chemicals areavailable at site for ATT.          
4 Safety precautions have been taken forcarrying out ATT and storage of Chemicals          
5 Record of consumption maintained at site          
4) Backfilling
1. Filling material/earth is as perspecification          
2 Anti-termite treatment has been carried nutbefore commencement of back filling          
3 Filling has been done in layers of 300 mm.watered and compacted as per specifications          
4 Proper compaction method has been adopted          
5 Filling has been done to the required levels          
5) Reinforced Cement Concrete Works
A. Pre-concreting
1. All specified materials available at site          
2 Cement is of the required grade and not morethan three months old.          
3 Shuttering checked for Staging & Propping.line & level, dimensions cleaning etc and its qualityapproved          
4 Application of oil & grease carried out          
5 Mixer/Vibrator as specified available at sitewith adequate means to run them during concreting          
6 Cut-out & Sleeves/Inserted          
7 Surface of reinforcement is clean and freefrom rust          
8 Bars have been provided as per structuraldrawings          
9 Lap length & dowels provided as per codalprovisions          
10 Pin bars & chairs/cover blocks providedas per requirements          
11 Tying of bars has been done Correctly          
12 Service lines(Electrical. Plumbing, Others)if any. provided before commencement of concrete          
B. General Arrangement
1. Availability/Arrangement of pumps etc.proper access & walkway checked          
2 Adequacy of vibrators/needle including dieselvibrator          
3 Slump cone & test cubes made          
4 Safety and health measures taken beforecommencement          
C. During Concreting
1 All necessary precautions taken beforecommencement of concreting          
2 Samples of taken for slump, cube tests etc foreach batch          
3 Proper Compaction done and checks on Staging &Scaffolding carried out          
4 Covering of green concrete carried out          
5 Surface finish checked          
6 Construction joints provided          
D. Post Concreting
1 De-shuttering started on Vertical faces/Otherfaces carried out as per codal provisions          
2 Proper curing of concrete carried Out          
3 Line& Level of surface checked forcorrectness          
4 Defects, notified and removed          
5 Cube and other test results will be intimatedto the engineer in charge for further action          
6) Masonry, Mortar and Plaster
A. Pre-Masonry Work
1 Availability of material as per dailyrequirement checked          
2 Quality check for bricks/blocks/sand/cementcarried out          
3 Provisions kept for electrical and otherservices          
B. During masonry work
1 Checking for line/level/right angle carriedout          
2 Mortar checked for mix proportion          
3 Proper raking of joints          
4 Seismic bands provided as per zonalrequirements          
C. Post masonry
Check cleaning of dead mortar and broken bricks/blocks etc.          
2 Curing carried out as per requirements          
D. Plastering/Pointing
1 Mortar for plastering as specified for eachside of wall          
2 Quality of cement and sand checked          
3 Curing work done as per requirement          
4 Preparation of surface          
E. During Plastering
1 Mortar mixing in tray          
2 Addition of water proofing compound          
3 Proper roughing of first coat          
4 Check for collection of mortar Spills          
5 Cleaning of dead mortar          
6 Check of waviness          
7 Check for grooves/drip moulds          
8 Application of cement slurry on concretesurface          
F. After Plastering
1 Curing          
2 Check for hollowness          
3 Check for cracks          
4 Check for diagonal          
5 Lime wash aller 3 days (within 5 days in caseof neeru application)          
6 Safety and health measures          
7) Water Proofing
1 Surface for waterproofing has been preparedand cleaned          
2 Safety measures/precautions taken beforecommencement of works          
3 Specified type of water proofing Used          
4 Specified material used for waterproofing          
5 The material used was as per specification          
6 Work has been carried out as perspecifications by the department/specialized agency          
8) IPS/Till Flooring and Dado
1 Layout of floor checked and proper slopes fordraining water are maintained specially in bath room and toilet.          
2 Thickness bases at Gl. checked of differentfloor          
3 Check fOr proper back filling under floor done          
4 Metal/glass strips laid properly in IPSflooring          
5 Curing of IPS Flooring done as perrequirements          
6 Dado provided as per required height          
7 Cleaning and finishing done          
9) Plumbing & Water Supply
1 GI/Cl/HDPE pipes etc. confirms to relevant IScodes          
2 Pipes of required diameter and their fittingsused          
3 Plumbing and Water Supply work carried outthrough a licensed plumber          
4 Works done as per specification          
5 Plumbing and Water Supply I works tested oncompletion -          
6 Defects rectified          
10) InternalElectrical WorksA .General
1 Layout plans: showing the position of L.TPanels/distribution board, lighting fixtures, lightingdistribution, scheme, receptacles, etc available beforecommencement of work          
2 All the following items are as perspecification and of approved makes          
           
L T Panels/Distribution BoardsLighting FixturesConduits, including accessoriesReceptaclesJunction BoxesCables/WiresAny other item          
B. Surface Conduit Wiring/Concealed ConduitWiring          
1 Conduit and accessories are of specified make,gauge and diameter          
2 Proper installation of all conduit wiring andconcealed wiring.          
C. Check List For Earthing
1 Earth electrode provided as specified.          
B. Surface Conduit Wiring/concealed ConduitWiring
1 Conduit and accessories are of specified make,gauge and diameter          
2 Proper installation of all conduit wiring andconcealed wiring.          
C. Check List For Earthing
1 Earth electrode provided as specified          
B. Surface Conduit Wiring/Concealed ConduitWiring
1 Conduit and accessories are of specified make,gauge and diameter          
2 Proper installation of all conduit wiring andconcealed wiring.          
C. Check List For Earthing
1 Earth electrode provided as specified.          
Check List For External Electrical Works
A. Check List For O.H. Lines
1 Poles used arc of approved make as specifiedand conform to relevant BIS codes          
2 Test certificate as applicable.          
3 Pole embedded below ground level as specified.          
4 Metallic poles are adequately earthed withspecified size of earth conductor.          
           
5 Strays struts, insulators, conductors usedconform to relevant BIS Code.          
6 Earth wire conductor used as specified          
7 Lightning arrestors used as specified          
B. Cable Laying
1 Trenches of specified dimensions excavated andprepared          
2 Required quantity of sand cushioning provided;cable laid; another layer of sand and brick protective coveringprovided. Refilling done earth ramming and dressing done          
3 Cables entry point in building or crossingroads path protected by providing Hume pipes or PVC Pipe          
4 Cable tested before and after laying andbefore emerging          
C. Check List For Earthing
1 Earth electrode provided as specified          
2 Types and size of main/sub main and circuitearthing conductors provided as specified.          
11) Drainage Works
1 Excavation for drains carried out as per theapproved lay-out          
2 Bed Concrete laid as per specifications withproper slopes and cuttings          
3 All pipes procured and laid as per requirement          
4 Jointing of pipesdone as per specifications5 Manholes provided as per design
6 Materials for construction of manhole asspecified          
7 End of the pipes plugged          
8 Drainage line tested before putting to use          
13) Others
1 Whether the provision for adequate ventilationand natural lighting has been made as per National Building code?          
2 Whether facility for storage in terms ofAlmirah/Shelves/Lofts/Platform has been made ?          
3 Whether Sanitary fittings have been provided?          
Form-IApplication for Land DevelopmentApplication No ..................................Application For Development/Re-Development of Land for Obtainng Development Permit
From for office use only
Name and address(in Block letters) Regd No. .............Date .....................
   
...............................................  
...............................................  
............................................... Signature of Authorised Person
...............................................  
Tel No/Mobile No...............................................  
Email id...............................................  
To  
...............................................  
...............................................  
...............................................  
Madam/Sir,I/We hereby apply for permission to undertake development of land in respect of plot No.(CS) ...................................................... Plot No(MSP) .......................................................... Village/Mauza .......................................................... Khata No ............................................................. under Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act.The said land shall be used for .............................................................. purpose.I/We do enclose herewith the following plans (4opies in cases of privately owned plots/8 copies in case of Government leased Government plots) and specifications duly signed by me and Town planner Architect/Engineer/Supervisor/Group agency ........................................................ bearing Regd No. .............................................................. License/Empanelment No ................................................................. who has/have prepared the plans, designs etc. and who will supervise the development. The parameters an checklist prepared by the Technical person are enclosed.I/We the owner(s) of every part of the land to which the application related request for permission of the above development land which may kindly accorded.
1. Four/Eight sets of the building plan: Yes/No/Not applicable
2. Ownership document: Yes/No/Not applicable
3. Supervision Certificate in form-V: Yes/No/Not applicable
4. Affidavit or peaceful possession of the land: Yes/No/Not applicable
5 Certificate for Structural stability in form-TV: Yes/No/Not applicable
6. NOC from lease case of lease hold: Yes/No/Not applicable
7. NOC from Fire Authority: Yes/No/Not applicable
8. NOC from Airport Authority: Yes/No/Not applicable
9. Environmental clearance: Yes/No/Not applicable
10. Details Fee : Yes/No/Not applicable
11 . Checklist: Yes/No/Not applicable
12. Any other certificate/NOC(please specify): Yes/No/Not applicable
Place:DateSignature of Owner(s)Name of Owner(s)Form-IIBuilding Plan Application FormApplication For Permission to Erect/Re-Erect, Demolish or to Make Addition or Alteration in a Building
From for office use only
Name and address(in Block letters) Regd No. .............Date .....................
   
...............................................  
...............................................  
............................................... Signature of Authorised Person
...............................................  
Tel No/Mobile No...............................................  
Email id...............................................  
To  
...............................................  
...............................................  
...............................................  
Madam/Sir,I/we hereby apply for permission erect, re-erect, demolish or to make addition or alteration an place in a building and carry out:-a) Construction of ................................................................ storey(Stories) buildingb) Re-construction of an existing buildingc) Alteration/addition to the existing buildingsd) Revalidation renewal of plan for construction of all Storied buildinge) Demolitionf) ..................................................... (if any other please specify)In respect of plot No.(CS) ...................................................................... Plot No(MSP) .......................................................................... .khata No ............................................................................ Holding No .................................................................................. Village/Mauza ............................................................................ Ward No .............................................................................. of Municipal Corporation/Municipal Council/Nagar Panchayats/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act the said land shall be used for ................................................................. purpose.I/We do enclose herewith the following plans (4 copies in cases of privately owned plots/8 copies in case of Government leased Government plots) and specifications duly signed by me and Town planner Architect/Engineer/Supervisor/Group agency ................................................................... bearing Regd No. ................................................................. License/Empanelment No ........................................................................... who has/have prepared the plans, designs etc. and who will supervise the development. The parameters and checklist prepared by the Technical person is enclosed.I/We the owner(s) of every part of the land to which the application related request for k permission of the above building plan may kindly be accorded.Documents furnished
1. Four/Eight sets of the building plan: Yes/No/Not applicable
2. Ownership document: Yes/No/Not applicable
3. Supervision Certificate in form-V: Yes/No/Not applicable
4. Affidavit or peaceful possession of the land: Yes/No/Not applicable
5 Structural stability certificate: Yes/No/Not applicable
6. NOC from lease case of lease hold: Yes/No/Not applicable
7. NOC from Fire Authority: Yes/No/Not applicable
8. NOC from Airport Authority: Yes/No/Not applicable
9. Environmental clearance: Yes/No/Not applicable
10. Details Fee : Yes/No/Not applicable
11 . Checklist of the proposed building: Yes/No/Not applicable
12. Any other certificate/NOC(please specify): Yes/No/Not applicable
Place:DateSignature of Owners(s) Name of Owner(s)Form-IIICertificate of Execution of Work as per Structural Safety RequirementsFrom................................................................................................................................................................................................................................................................................................................................................(Name and address of the applicant in block letters)To................................................................................................................................................................................................................................................................................................................................................With respect to the building work of erection/re-erection or for making alteration in the ..................................................................... khata No. ........................................................................... building on in with respect of Plot No(CS) ............................................................................ Plot Village/Mauza ................................................................. Ward No ......................................................................... of Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act or within the Development Plan Area of .................................................................. purpose.I certify;

1. That the building has been constructed according to the structural design and specification prepared by me, which incorporates the provisions of structural safety norms as specified in part 6 (Structural Design) of the national building code of India, 2005 and other relevant codes and the design complies with the Earthquake safety requirement.

2. That the construction has been done under my supervision and guidance and adheres to the structural drawings and specifications prepared by me and records of supervision have been maintained.

Any subsequent changes or deviation from the structural drawings and specifications shall be the responsibility of the owner/builder.Name and signature of competentTechnical PersonRegistration no.Date:Address:Name and Signature of Owner/Builder/ApplicantRegistration no.Date:Address:Form-IVCertificate For Structural StabilityWith respect to the building work of erection, re-erection or for making alteration with respect of Plot No(CS) ............................................... Plot No.(MSP) ............................................................... khata No Holdings No ................................................................ Village/Mauza Ward No ...................................................... of Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act.I certify that the structural calculations, plans and details including the relevant specifications of the building prepared by me, satisfy the structural safety requirements for all situations including natural disasters like cyclone & earth quake etc: as applicable under the Byelaws and stipulated under Part-6 (Structural Design) of the National Building Code of India, 2005 and other relevant codes; and the information given the in is factually correct to the best of my knowledge.I undertake the responsibility with regard to supervision of the work at each and every stage of construction of the structure, regularly to the effect that the building is being constructed conforming to the structural plan prepared structural calculations, plans and details including the relevant specifications of the building prepared by me.I will be responsible and liable for action by ............................................................................ Authority/Government if the plan/design contain misrepresentation or fraudulent information and the construction is made in deviation from structural calculations, plans and details including the relevant specifications of the building prepared by me or if there is any structural failure due wrong/unsafe structural design/use of low quality material and/or poor workmanship endangering the safety of inmates or public and the the structural stability of the building.Name and signature of competentTechnical PersonRegistration no.Date:Address:Name and Signature of Owner/Builder/ApplicantRegistration no.Date:Address:Form-VForm For SupervisionI hereby certify that development erection/re-erection/demolition material alteration in/of the building in respect of Plot No(CS) ............................................................... Plot No(MSP) ............................................................... khata No ............................................................... Holding No ............................................................... Village/Mauza .............................................................../Ward No ............................................................... of ............................................................... Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act shall be carried out under my supervision and certify that all the materials (type and grade) and the workmanship of the work shall be generally in accordance with the general and detailed specifications submitted along with and that the work shall be carried out according to the sanctioned plans.Signature of Empanelled Technical PersonName of the Technical Person with Registration numberAddress ..............................................................................................................................Date .................................Form VICheck List

1. Name of the Applicant:

2. Name of the Owner:

3. Name of the Builder/Developer and Name of the Project:

4. Ownership documents: Established/Non established

5. Land Area

As per Document As per Building Plan As per Possession
     

6. Tenancy:-Lease hold/Free hold.

If lease hold:
(i)Name of Lesser:
(ii)Purpose of lease:
(iii)Duration of lease:

7. Existing off site Physical Infrastructure:

(a)Road
(b)Sewerage
(c)Drainage
(d)Water facility
(e)Availability of drain
(f)Telephone
(g)Electricity

8. Nature of Construction: New Construction/Reconstruction/Addition/Alteration

9. (i) Amount of fee deposited

(ii)Covered area on all floors

10.

Use applied Prescribed Land use in the development plan(ifany) Whether permissible/not permissible/specialconsideration
     
     

11. (i) Whether first permission/Revised permission/Revalidation .......................................................

(ii)No of floor(s) .......................................................

12. Contents of Buildings Plan:

(i)Site plan
(ii)Lay out plan
(iii)All floor plan
(iv)Elevations Front/Rear/Right/Left/Cross section
(v)Plan of foundation
(vi)Septic tank and Soak pit
(vii)recharging pit & Rain Water harvesting Plan
(viii)Drain Section
(ix)Schedule of doors and windows

13. Approach road:

(i)Nature of road
(ii)Width of road
As per site/key plan Site inspection report
   
(iii)Whether the approach road as shown connected to an existing public road in the site plan ...........................................
(iv)Whether such connection is available in settlement sheets or Cadastral Map: Yes/No
(v)If private, whether
(a)transferred to the Authority: Yes/No
(b)indicated in the final settlement plan: Yes/No
(c)mentioned in the ownership document: Yes/No

14. Whether the plot is affected by proposed road/proposed drain/proposed lake/any other public use ...........................................................

15. Whether the plot is within 100meter/100-300 meter of State/A.S.I. protected monuments.... Whether the plot is within 200 meter radius of important buildings (i.e. Governor House, High Court, State Secretariat, Legislative Assembly)

16. Building Parameters:

Category Requirement as per norm Approved building plan Proposal Remarks
1 2 3 4 5
Basement/stilsqmt        
1stfloor sqmt        
2ndfloor sqmt        
3rdfloor sqmt        
4thfloor sqmt        
Other Floors        
Society room        
Front set back        
Rear set back        
Left/Right side set back        
FAR        
Parking        
Height        
No. of dwelling unit        
Population density        
No. of staircase        
No. of lift        
Recharging pit        
Fee deposited        
Any other item        
Exemptions(i) height(ii) setback(iii) FAR        

17. Whether falls in the Airport funnel zone .......................................

18. Provision of proposed on site physical infrastructure

(i)Water Supply:-
(ii)Sewerage:-
(iii)Drainage:-
(iv)Electrical Installation:-

19. Clearance/Certificate produced

(i)General Affidavit:-
(ii)Structural Stability Certificate:-
(iii)Form of Supervision:-
(iv)NOC from Fire Authority:-
(v)Undertakings with regard to quality construction/Water Supply/Sewerage/Drainage/Waste disposal/firefighting (wherever applicable)
Any other (specify)N:B: (RS Required and Submitted, RNS: Required not Submitted, NR: Not Required)

20. Involvement of Technical Person & Builder:

(i) Architect/Engineer:-
  Name:-
  CoA registration no.(for Architects)
  Empanelment no:
  Signature
(ii) Engineer/Structural Engineer:-
  Name
  Empanelment No:
  Signature
(iv) Builder/Owner/Applicant
  Name:
  Registration no.
  Signature
Form-VII (A)For Empanelment of Technical Person (Artchetect, Engineer, Structural Engineer, Town Planner, Supervisor)
Self-Attestedpassport sizephoto of theapplication

1. Name .....................................................................................

(In block letter)

2. Father's/Husband's Name ...................................................................................

3. Date of Birth ..............................................................................

4. Nationality ...............................................................................

5. Educational Qualification .............................................................

6. Professional Experience ...................................................................

7. Registration No. With Council of Architecture, New Delhi ..................................

8. Registration with other relevant Institutions/ULBs .........................................

9. Details of other Academic & Professional Achievements .......................................

10. Details of Certificate relating to qualifications/testimonials, if any as per column 5 & 6 with self attested copies .........................................................

11. Details of Bank Draft/Postal Order (separately for empanelment Rs. 500/ ............................

12. Permanent Address - ..........................................................................

13. Address for Correspondence - ...................................................................

14. Tel. No./Mob. No - ..........................................................................

15. Email id - ..................................................................................

DeclarationI hereby solemnly affirm and declare that the information as furnished above are true and correct to the best of my knowledge and belief. I further undertake that if any information at any stage shall be found to be false, any my empanelment shall be liable to be cancelled without any prior notice in that regard and I shall not claim any compensation etc. for such a default on my part. In case of any discrepancies found later, I shall be liable for punishment under the relevant provision of law as also under Jharkhand Municipal Act-2011, Jharkhand Regional Development Authority Act-2002, Jharkhand Mineral Area Development Authority Act. Jharkhand Industrial Area Development Authority Act.Place ..................................................................Date ...................................................................Name and Signature of the ApplicantNote:- Self Attested copies of supporting documents shall be submitted along with the form.Form-VII (B)For Registration of Builder
To,The Authority…..............................…..............................   Self-Attestedpassport Sizephoto of theapplication  

1. Name of the Firm

2. Type of Firm-(Partnership/Company) (In block letters)

3. Name of Partner/Directors ....................................................

(In block letters)

4. Father's/Husband's Name ...............................................................

5. Date of Birth ....................................................

6. Nationality .........................................................................

7. Registration No .............................................................

8. PAN/DIN .......................................................................

9. Sales Tax No ...............................................................

10. VAT No .....................................................................

11. Income Tax Statement of Last Three consecutive Financial Year ..........................................................................

12. Category applied for .......................................................

13. Details of fee ...........................................................

14. Permanent Address ..........................................................

15. Address for Correspondence - ................................................................................

16. Tel. No./Mob. No .............................................................................

17. Email id ................................................................

DeclarationI hereby solemnly affirm and declare that the information as furnished above are true and correct to the best of my knowledge and belief. I/we have not been barred for building construction activities by any competent authority and further undertake that if any information at any stage shall be found to be false, my registration shall be liable to be cancelled without any prior notice in that regard and I shall not claim any compensation etc. for such a default on my part. In case of any discrepancies found later, I shall be liable for punishment under the relevant provision of law as also under Jharkhand Municipal Act-2011, Jharkhand Regional Development Authority Act-2002, Jharkhand Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act.Place ............................................................Date ...............................................................Name and Signature of the ApplicantNote:- Self Attested copies of supporting documents shall be submitted along with the form.Form-VIII (A)For Approval of Building PermitWith respect to your Application No .................................... date .................................... permission is hereby granted in favour of, Smt/Shri .................................... fora) Construction of a .................................... buildingb) Reconstruction of .................................... buildingc) Alteration of .................................... buildingd) Alteration or additions in the existing buildinge) Institution of change of the use of building .................................... (Specify)In respect of Plot No (CS) .......................................... Plot No (MSP) .......................................... Khata No .......................................... Holding No. .......................................... Village/Mauza .......................................... of Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act to the following conditions/restrictions.a) The land/Building shall be used exclusively for .......................................... purpose and the uses shall not be changed to any other use without prior approval of this Authority.b) The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement.c) Parking space measuring .......................................... sq. m. as shown in the approved plan shall be kept open and no part of it will be built upon.d) The land over which construction is proposed is accessible by an approved means of access of .......................................... m. width.e) The land in question must be in lawful ownership and peaceful possession of the applicant.f) The applicant shall free gift .......................................... m. wide strip of land of the road in the name of the authority for the purposes as mentioned in these Byelaws.g) The permission is valid for period of three years with effect from the date of issue.h) Permission accorded under the provision cannot be construed as evidence in respect of right title interest of the plot over which the plan is approved.i) Any dispute arising out of land record or in respect of right/title/interest after this approval the plan shall be treated automatically cancelled during the period of dispute.j) Any other conditions.By OrderAuthorised Officer..........................................Memo No .......................................... , Date ..........................................Copy along with .......................................... copies of the approved plans to Smt./Shri ..........................................Authority Officer/AuthorityMemo No .......................................... Date ..........................................Copy with a copy approved plan forwarded to the ...................................... Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayats for information.Authority Officer/Authority..............................Form-VIII (B)For Approval of Land Development PermitWith respect to your Application No .......................................... date .......................................... permission is hereby granted in favour of, Smt/Shri .......................................... fora) For layout plan of land developmentb) Institution of change of the use of land (Specify)In respect of Plot No (CS) .......................................... Plot No (MSP) Khata No .......................................... Holding No. .......................................... Village/Mauza .......................................... of Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act to the following conditions/restrictions.a) The land shall be used exclusively for .......................................... purpose and the uses shall not be changed to any other use without prior approval of this Authority.b) The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement.c) Parking space measuring .......................................... sq. m. as shown in the approved plan shall be kept open and no part of it will be built upon.d) The land over which construction is proposed is accessible by an approved means of .......................................... access of m. width.e) The land in question must be in lawful ownership and peaceful possession of the applicant.f) The applicant shall free gift .......................................... m. wide ..........................................strip of land in the Municipal Corporations/Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act for the further widening of the road to the standard width.g) The permission is valid for period of three years with effect from the date of issue.h) Permission accorded under the provision cannot be construed as evidence in respect of right title interest of the plot over which the plan is approved.i) Any dispute arising out of land record or in respect of right/title/interest after this approval the plan shall be treated automatically cancelled during the period of dispute.j) Any other conditions.By OrderAuthorised OfficerMemo No .......................................... , Date ..........................................Copy along with .......................................... copies of the approved plans to Smt./Shri ..........................................Authorised Officer/AuthorityMemo No .......................................... , Date ..........................................Copy with a copy approved plan forwarded to the ........................................ Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayats for information.Authorised Officer/AuthorityForm-IXForm of Refusal of Building Permit/Development PermitFrom.............................................................................................................................To,Smt/Sri .........................................................With respect to the Application No .............................................. dated .............................................. , your reply to the objections made by this office vide its letter No .............................................. dated .............................................. has not been found satisfactory.Your application for permission to undertake building/land development on Plot No
(CS).............................................. .Plot No (MSP) .............................................. Khata No .............................................. Holding No. .............................................. Village/Mauza .............................................. of Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act is hereby refused on the following grounds.

1. ............................................................................................

2. ............................................................................................

3. ............................................................................................

4. ............................................................................................

Two copies of the plans are retained in this office for record and reference and the rest are returned herewith.Authorised Officer/ Authority..............................................Memo No .............................................. , Date ..............................................Copy forwarded to the ..................................... Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayats for information.Authorised Officer/ Authority..........................Form-XForm of Notice For Commencement of Work(To Be Furnished by the Plot Owner(S) and the Builder/developer)From.........................................................................................................................................................................................................................................................(Name and address of the applicant in block letters)To.........................................................................................................................................................................................................................................................Sir,I/we hereby given of the erection of building in with respect of plot No (CS) ............................................. Plot No (MSP) ............................................. Khata No ............................................. Holding No. ............................................. Village/Mauza ............................................. Mohalla ................................................/Ward No ............................................. of ............................................. Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act within the development plan area of ............................................. to be commenced on ............................................. as per the permission given in your letter no ............................................. dated ............................................. Under the supervision of ............................................. Authority/empanelled Architect/Structural Engineer ............................................. Regd. No ............................................. in accordance with the approval plan.Yours faithfully,Name and Signature of Owner/Builder/Applicant Registration no.Phone/Mobile no.-Date:Address:Form-XIPeriodic Progress Report(To be submitted by the Empanelled Structure/Architect/Engineer)From.........................................................................................................................................................................................................................................................To,........................................................................................................................................................................................................................................................Ref .......................................... Authority approval letter No .......................................... Dated ..........................................Madam/Sir,I/we hereby certify that the construction of the building up to plinth level/ground floor roof slab level/first floor roof slab level/second floor roof slab level .......................................... of the building with respect of plot No (CS) .......................................... Plot No (MSP) .......................................... Khata No .......................................... Holding No .......................................... Village/Mauza ........................................../Ward No .......................................... of .......................................... Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act within the development plan area of .......................................... has been supervised by me/us and has been constructed strictly conforming to the sanctioned plan and structural design as per the provision of NBC,2005. The work has been done to my/our best satisfaction. All the materials used in construction of this building are strictly in accordance with BIS specifications and norms conforming to National building Code, 2005 covering all the safety factors including earthquake and cyclone. I/we will be responsible and liable for action by .......................................... Authority/Government if there is any structural failure and fire endangering the inmates and public.
(i) Architect/Engineer:-
  Name:-
  CoA registration no.(for Architects)
  Empanelment no:
  Signature
(ii) Engineer/Structural Engineer:-
  Name
  Empanelment No:
  Signature
(iv) Builder/Owner/Applicant
  Name:
  Registration no.
  Signature
Form-XIIMaintenance of Register
Sl. Name and address of the applicant Date of receipt of application Date of permission/refusal with letter No. Date of Submission of commencement Submission of notice of completion Date of issue/refusal of occupancy permissionwith letter no. Remarks Signature of the Aurthorised Person
(i) (ii) (iii) (iv) (v) (vi) (viii) (ix) (x)
                 
Form-XIII (A)Indemnity Bond For BasementThe indemnity Bond is executed by Shri/Smt .................................................... S/o, D/o, W/o Shri/Smt. .................................................... R/O .................................................... in favour of .................................................... Authority.Whereas the Executant has submitted to the concerned Authority the plans for sanction of basement over Plot No(CS) .................................................... Plot No(MSP) .................................................... khata No .................................................... Holding No .................................................... Village/Mauza ..................................................../Word No .................................................... of Municipal Corporation/Municipal Council/Nagar Panchayat/Municipality/Notified Area Committee/Regional Development Authorities/Industrial Area Development Authorities/Mineral Area Development Authority, Gram Panchayat areas covered under Development Plan or Planning Scheme notified under Jharkhand Municipal Act 2011, Jharkhand Regional Development Authority Act 2002, Mineral Area Development Authority Act, Jharkhand Industrial Area Development Authority Act within the development plan area .................................................... under the provisions of the building Bye laws made there under whereas the concerned Authority has agreed to sanction the aforesaid construction subject to the conditions that the owner shall indemnity the concerned Authority in the event of any loss or damage being cause to the adjoining building on account of the construction of the said basement either as the time of digging of its foundations or in the course of its construction or even thereafter and also against any claim of any concern there to.And whereas the executants has agreed to execute an indemnity bond to the above affect and also to abide by the terms imposed by the concerned .................................................... Authority the grant of sanction for construction of the basement.Now the deed witnesses:

1. That in consideration of the sanction of the plans by .................................................... Authority for construction of the basement the executant undertakes that he/she shall at all times keep .................................................... Authority free from any liability, loss or damages/flowing from any injury or damage caused to the adjoining built up properties or to any person as a consequence of the construction of at the time of digging of its foundations or during the course of its construction or at any time thereafter.

2. The owner agreed and undertakes that in the event of any claim being made by any person or persons against the concerned Authority either in respect of the sanction granted by the concerned Authority to the owner for the construction of basement or in respect of the construction or manner of construct ion of the basement .by the owner of the consequences flowing from the said sanction the executant shall be responsible and liable and not .................................................... Authority.

3. The executant agrees and undertake to indemnify the concerned Authority fully in respect of any amount which the concerned Authority may be required to pay to any person either by way of compensation or on any other account as a result of any claim or suit or any other proceedings concerning the sanctioning of the construction of the basement of the making there of and also in respect of the costs and expenses which the concerned Authority may incur on defending any action.

4. Without prejudice to the above undertaking the executant hereby binds itself to pay to .................................................... Authority to the full extent any amount which .................................................... Authority may be required to pay to any person in connection with relating to or concerning the sanctioning or the basement o the making thereof.

5. The owner agrees and undertakes that this bond shall remain in full force and effect till the executant faithfully observes/performs the undertaking here in before contained. In witness where of the executant above named has signed this bond on this .................................................... of .................................................... at .................................................... day

IndemnifierName and Signature of Owner/Builder/ApplicantRegistration no.Phone/Mobile no.-Date:Address:Witness:
1. Name..............................................
Full Address............................................
Date..............................................
(Signatures)
2. Name..................................................
Full Address..............................................
Date..................................................
(Signatures)
Form-XIII (B)AffidavitI ........................................................................... S/o, W/o ........................................................................... by faith ........................................................................... Resident of ........................................................................... do hereby solemnly affirm and declare that the statements made herein below are true to the best knowledge and belief.

1. That I am the Owner/Power of Attorney Holder of land having R.S./M.S. Plot No. ........................................................................... khata No. ........................................................................... Khewat No. ........................................................................... Thana No. ........................................................................... corresponding to holding No. ........................................................................... Ward No. ........................................................................... of name of the Authority ..........................................................................., measuring an area of ........................................................................... situated at Village/Mauza ........................................................................... P.S.Name of the Place ...........................................................................

2. That the land mentioned above is a freehold property and does not belong to Khas Mahal Estate of Government. It is not either Gair Mazarua Aam Khas, Kaisare Hind, District Board or Acquired Land.

3. That the land stated above is a tribal land/not a tribal land for tribal land; permission for transfer has been obtained vide Case No. Year from SAR/DC/Commissioner Court.

4. That I have applied a building Plan vide B.C. Case No.................................

5. That further declare that in future, if it will be found that property mentioned above are Gair Mazarua Aam Khas, Kaisare Hind, District Board or Acquired Land property of Government the sanctioned map will be deemed to be cancelled due to misrepresentation and suppression of facts.

Sworn & Signed this Affidavit on this the ........................................................................... day of 200 ........................................................................... at Name of the place ...........................................................................DeponentIdentified by :(Advocate, Name of the place ........................................)Form-XIVCertificate of Undertaking for Hazard Safety RequirementTo,REF:- Proposed work of ............................................................ (Title of project) C.S.No./R.S.No in ward No. ............................................................ at village/Mauza ............................................................ Scheme No ............................................................ of ............................................................ village/Town/City ............................................................

1. Certified that the building plans submitted for approval will satisfy the safety requirements as stipulated under Building Bye-laws 59 and the information given there in is factually correct to the best of our knowledge and understanding .

2. It also certified that the structural design including safety from hazards based on soil conditions shall be duly incorporated in the design of the building and these provisions shall be adhered to during the construction as per Annexure-IX & X.

(ii) Engineer/Structural Engineer:-
  NameEmpanelment No:Signature with date
 
 
(iii) Builder/Owner/Applicant
  Name:Registration no.Signature with date