State of Jammu-Kashmir - Act
Jammu and Kashmir Water Resources (Regulation And Management) Rules, 2011
JAMMU & KASHMIR
India
India
Jammu and Kashmir Water Resources (Regulation And Management) Rules, 2011
Rule JAMMU-AND-KASHMIR-WATER-RESOURCES-REGULATION-AND-MANAGEMENT-RULES-2011 of 2011
- Published on 24 January 2011
- Commenced on 24 January 2011
- [This is the version of this document from 24 January 2011.]
- [Note: The original publication document is not available and this content could not be verified.]
Chapter I
Preliminary
1. Short title and commencement
2. Definitions
- In these rules, unless the context otherwise requires,-3. Prohibition of certain acts affecting the water works utilities No person shall
4. Prohibition on construction over water works utilities
Chapter II
Drinking Water Supply
Part-AWater For Domestic Use5. Application for water connection for domestic use
6. Agreement
- On grant of water supply connection, the applicant shall execute an agreement with the Executive Engineer in form-II undertaking to abide by and adhere to all the terms and conditions contained therein.7. Validity of connection
- If the applicant to whom a water supply connection has been granted fails to get his connection installed within 6 months from the date of grant of connection, such connection shall be deemed to be inoperative and the applicant shall have to apply afresh for getting a water supply connection.8. Installation of Meter
9. Water usage charges
- Till the water usage charges are fixed by the Authority under the Act, a consumer shall be liable to pay water charges as per the existing rates.10. Preparation of demand note for water usage charges and service thereof
- The Assistant Executive Engineer In-charge of an area shall prepare a record of water used by consumers of that area and the water usage charges for such consumption payable by each consumer in form-III A or form III B, as the case may be, and serve a demand note on each such consumer twice a year on first April and first October every year with a copy the Executive Engineer for record.11. Deposit of water usage charge
On receipt of the demand note served upon him by the Assistant Executive Engineer under rule 10, the consumer shall deposit the water usage charges in the sub-division office against a proper receipt and the Assistant Executive Engineer shall, at the end of each day or in the morning of the next working day, remit the amount in the divisional chest.12. Connection from main line
Ordinarily no water connection shall be given from the main supply line. However, the Chief Engineer may, on the recommendation of Superintending Engineer, grant = to 1 inch dia water supply connection from the main supply line of less than 6 inches dia in exceptional cases for installation of fire fighting equipments and providing water supply to district hospitals or other vital installations of the Government:Provided that water utilized for firefighting purposes shall be free of cost.13. Cutting of water supply connection
- The Executive Engineer shall cause cutting of water supply to any premises or may turn off such supply on any of the following grounds:14. Restoration of water supply connection
15. Application for water connection for commercial use
16. Agreement
- On grant of water supply connection, the applicant shall execute an agreement with the Chief Engineer in Form-V undertaking to abide by and adhere to all the terms and conditions contained therein.17. Installation of Meter
18. Water usage charges
- Till the water usage charges are fixed by the Authority under the Act, a consumer shall be liable to pay water charges for the use as per the existing rates19. Validity of connection, installation of meters, deposit of water charges, cutting of supply and re-connection etc.
- The provisions of rule 7, 8 and 10 to 14 relating to validity of connection, installation of meters, service of demand note, deposit of water usage charges, connection from main line, cutting of water supply and re-connection thereof shall apply mutatis mutandis in respect of water supply connection for uses other than domestic use under this part.Chapter III
Irrigation and Flood Control
20. Prohibition on use of water from irrigation work without permission
21. Water usage charges for use of water for irrigation purposes
22. Regulation of water supply from irrigation work
- The Assistant Executive Engineer concerned shall notify in respect of each irrigation work23. Application for permission to use water from an irrigation work
24. Prohibition on sowing, cultivating or growing certain crops in the irrigation area
25. Restriction on construction of Wells
26. Preparation of scheme for water/field channels
27. Maintenance of water channels
28. Person using water course to construct works
29. Protection of water channels against demolition etc.
- If any person demolishes, alters, enlarge, obstructs or encroaches upon a water channel or field channel or causes any damage thereto, the Assistant Executive Engineer shall take immediate steps for restoration of the same to its original condition in accordance with the provisions of section 38 of the Act.30. Supply of water through intervening water channel
- If any person makes an application for supply of water from an irrigation work made under section 40 of the Act, the Assistant Executive Engineer shall give notice to the persons responsible for maintenance of such field channel to show cause within seven days from the date of issue of notice as to why the said supply should not be so conveyed and after making enquiries and satisfying himself fully, the Assistant Executive Engineer shall issue an order for the conveyance of water through a such field channel under the following terms and conditions:31. Transfer of field channel
32. Construction and maintenance of field channels
33. Preparation of schemes in culturable commanded area
- Every scheme for on-form development in cultural command areas shall be made and executed in accordance with section 51 of the Act.34. Removal of encroachments and obstructions over irrigation/flood control works
- The Executive Engineer incharge of an area shall ensure that all encroachments and obstructions over or upon irrigation or flood control works in such area are removed immediately on being noticed or on being informed about such encroachment or obstruction in accordance with the provisions of sections 52 and 53 of the Act.35. Preparation of scheme for drainage works
36. Scheme for field drains
- For preparation of a field drain, the Assistant Executive Engineer shall follow the procedure laid down in rules 26 to 30.37. Plying of boat or vessel
38. Extraction of water from irrigation work by installation of a pump set or other electrical or mechanical device
39. Prohibition on deposition of material or waste near an irrigation work or a water channel
40. Notification of flood basin
- After notification of an area as flood basin under section 79 of the Act, the Chief Engineer, Irrigation and Flood Control shall cause a public notice exhibited at conspicuous places in the flood basin area for information of general public specifying therein the boundaries of the basin and the prohibitions and restrictions on use of land covered by the basin. Such notices shall also be individually given to the owners and occupiers of the land in the basin area.41. Superintendence and control of embankments
- The Chief Engineer Irrigation and Flood Control, or subject to his approval, the Executive Engineer concerned shall, on apprehending a threat to the life and property of the public due to floods or apprehending such threats, cause public embankments constructed to avert such threats and if the situation so warrants also42. Extraction of bed material
43. Restrictions on construction on the slopes of embankments
Chapter IV
Installation of a Unit
44. Installation of Unit
- Any person intending to install a unit requiring usage of water for the purpose of generation of electricity, supply of drinking water or water for irrigation, running of water mill or exploitation of groundwater shall, after preparation of a scheme, submit the same to the Authority for approval. Every scheme shall be accompanied by45. Contents of the DPR
- The Detailed Project Report (DPR) shall contain the following particulars46. Requirement of obtaining a licence
- After approval of a scheme by the Authority under sub-section (2), or by the Government under sub-section (4), of section 92 of Act or for undertaking any activity as mentioned in section 96 of the Act, the user shall apply to the licensing authority for grant of a licence for use of water.47. Application for licence
- Every application for a grant of licence shall be signed by or on behalf of the applicant and shall be accompanied by48. Procedure for grant of Licence
49. Agreement to be executed by the licensee
- After issuance of licence under rule 48, the licensee shall execute an agreement with the licensing authority in Form-X undertaking thereby to take all necessary precautions and measures for50. Requirement of licence for existing users
51. Grant of licence to the existing users
52. Agreement to be executed by existing users
- After issuance of licence to an existing user under rule 51, the licensee shall execute an agreement with the licensing authority in the same manner as provided n rule 49.53. Suspension of a licence
- The licensing authority may suspend a licence issued under rule 48 or rule 51, if the licensee,-54. Notice of suspension and restoration of licence
55. Revocation of licence
56. Procedure for assessment of water usagi charges and recovery thereof
57. Disconnection of supply in case of default of payment
Chapter V
Ground Water
58. Grant of permit to extract and use ground water in the notified area
59. Registration
- After grant of permission under rule 58, the Chief Engineer shall register the user/well and grant a Certificate of Registration after allotting a registration number to such user/well.60. Registration of existing users in the notified areas
61. Information of wells in non-notified areas
62. Water usage charges for extraction and use of ground water
- The procedure specified in rule 56 and rule 57 shall be followed for assessment of water usage charges and recovery thereof in respect of extraction and use of ground water.63. Registration of drilling agencies
Chapter VI
State Water Resources Regulatory Authority
64. Composition of State Water Resources Regulatory Authority
65. Salary and allowances of the Chairperson and Members
66. Oath of office and secrecy
- The Chairperson and Members shall, before entering upon their office, make and subscribe an oath of office and secrecy before the Chief Secretary of the State as per the Schedule.67. Decisions of the Authority
- The Authority shall decide all matters brought before it by majority. In case of a tie, the Chairperson shall have a casting vote.68. Officers and other employees of the Authority
69. Functions of the Secretary
70. Annual report of the authority
Chapter VII
General
71. Complaints
72. Compounding of offences/filing of complaints
- If, on inspection or on a report by any subordinate officer or on a complaint by any person, the Chief Engineer or Executive Engineer or Assistant Executive Engineer concerned, having the jurisdiction over the area where the offence has been committed or has occurred, is satisfied that any user or licensee or any other person or authority has committed an offence punishable under the Act, he shall either compound the offence under section 181 of the Act read with rule 73, if a request to that effect is made by the offender thereof, or file a complaint under rule 71 in the court of competent jurisdiction.73. Authorities competent to compound offences
| S.No. | Offence | Compounding authority |
| (a) | Offences punishable under clauses (m) to (s) of sub-section(1) of section 156 or sub-section (1) of section 159 or sections160 to 162 of the Act. | Assistant Executive Engineer |
| (b) | offences punishable under clauses (a) to (1) of sub-section(1) of section 156 or sections 163 to 165 or section 167 orsection 168 of the Act. | Executive Engineer |
| (c) | offences punishable under sub-section (2) of section 159 orsection 166 or section 174 of the Act. | Chief Engineer |